Notification of revised ISO operating procedures 2510A, 3630, 3630A, 5360, 5360A, 5360B and 5360C
MESSAGE

The California ISO has revised the operating procedures referenced below.

 

2510A Point of Receipt (POR)/Point of Delivery (POD)-Scheduling Path Cross Reference, version 12.2, effective July 13, 2023.

Added MEADN_2_N101 to MEAD230_ITC to accommodate Los Angeles Department of Water and Power (LDWP) Energy Transfer System Resources (ETSRs) on MEAD230. Removed PacifiCorp East (PACE) from MONA_3_N501 row to resolve Customer Inquiry, Dispute and Information system (CIDI) case 263548.

 

3630 Modeling - Scheduling Existing Transmission Contract (ETC) and Transmission Ownership Rights (TOR) Rights, version 7.1, effective July 13, 2023.

Periodic Review: Updated from ISO to CAISO, minor formatting and grammar edits.

 

3630A ETC/TOR Instructions, version 3.1, effective July 13, 2023.

Periodic Review: Corrected typos and updated form field.

 

5360 Black Start Resource Testing, version 3.3, effective July 13, 2023.

Periodic Review: Minor formatting, updated procedure references and removed history prior to five years.

 

5360A Black Start Resource Test Request Form, version 2.2, effective July 13, 2023.

Periodic Review: No changes.

 

5360B Black Start Resource Test Report Form, version 2.3, effective July 13, 2023.

Periodic Review: Very minor formatting, no content changes.

 

5360C Black Start Resource Test Plan Template, version 2.2, effective July 13, 2023.

Periodic Review: Minor formatting and grammar or punctuation edits.

 

The California ISO’s operating procedures are available on the Operating Procedures webpage.

CONTACT INFORMATION

Please contact the ISO Procedure Control Desk at ProcedureControl@caiso.com with any questions.