Notice
August 24, 2022
REQUESTED ACTION
Forwarding to Operating Department
CATEGORIES
Operations
Notification of revised RC West operating procedures RC0110, RC0540A, RC0650 and RC0680
MESSAGE

RC West has revised the operating procedures referenced below.

 

RC0110 Communications Protocols, version 4.1, effective Aug. 24, 2022

Annual Review: Minor edit in References section only.

 

RC0540A RC West WIT Schedule Change Process, version 1.2, effective Aug. 24, 2022

Removed the macro-enabled Western Interchange Tool (WIT) Schedule Change Form link from Background Section.

Corrected Step 2 title and slight rewording to Steps 3 and 4.

 

RC0650 Steady-State and Dynamic System Model Validation: North American Electric Reliability Corporation (NERC) MOD-033-2, version 3.1, effective Aug. 24, 2022.

Annual Review: No changes.

 

RC0680 RC Guidelines for Seasonal Assessment and Coordination Process, version 1.2, effective Aug. 24, 2022.

Periodic Review: no content edits, formatting only. 

 

The California ISO’s operating procedures are available on the Operating Procedures webpage.

CONTACT INFORMATION

Please contact the ISO Procedure Control Desk at ProcedureControl@caiso.com with any questions.

California Independent System Operator | P.O. Box 639014 | Folsom, CA 95630 | United States
Copyright © 2022 California Independent System Operator. All rights reserved.