RC West has revised the operating procedures referenced below.
RC0120A RC West IRO-010 Data Specification, version 6.3, effective Oct. 12, 2023.
Updated data request 6.8.2 from discussions with Data Exchange Working Group (DEWG) on 9/13/23 and Joint Cold Weather Task Force, per North American Electric Reliability Corporation (NERC) Alert 3. Added a note to 6.2.8 In accordance with Full Network Model Schedule posted RC Portal > Western Interconnection Model library for new resources. Updated data requests 1.13, 6.10.1, and 6.10.2 in preparation of Federal Energy Regulatory Commission (FERC) Order 881 on dynamic ratings. Updated template name for request 6.15. Added request 2.24 based on feedback regarding battery storage Inter-Control Center Communications Protocol (ICCP) data.
RC0120B RC West IRO-010 Data Specification for Adjacent RCs, version 4.4 effective Oct. 12, 2023.
Updated data requests 1.13, 6.10.1, and 6.10.2 in preparation of FERC Order 881 on dynamic ratings. Added request 2.24 based on feedback regarding battery storage ICCP data.
The California ISO’s operating procedures are available on the Operating Procedures webpage.