Notice
Oct. 12, 2023
REQUESTED ACTION
Forward to Operating Department 
CATEGORIES
Operations
Notification of revised RC West operating procedures RC0120A and RC0120B
MESSAGE

RC West has revised the operating procedures referenced below.

 

RC0120A RC West IRO-010 Data Specification, version 6.3, effective Oct. 12, 2023.

Updated data request 6.8.2 from discussions with Data Exchange Working Group (DEWG) on 9/13/23 and Joint Cold Weather Task Force, per North American Electric Reliability Corporation (NERC) Alert 3. Added a note to 6.2.8 In accordance with Full Network Model Schedule posted RC Portal > Western Interconnection Model library for new resources. Updated data requests 1.13, 6.10.1, and 6.10.2 in preparation of Federal Energy Regulatory Commission (FERC) Order 881 on dynamic ratings. Updated template name for request 6.15. Added request 2.24 based on feedback regarding battery storage Inter-Control Center Communications Protocol (ICCP) data.

 

RC0120B RC West IRO-010 Data Specification for Adjacent RCs, version 4.4 effective Oct. 12, 2023.

Updated data requests 1.13, 6.10.1, and 6.10.2 in preparation of FERC Order 881 on dynamic ratings. Added request 2.24 based on feedback regarding battery storage ICCP data.

 

The California ISO’s operating procedures are available on the Operating Procedures webpage.

CONTACT INFORMATION

Please contact the ISO Procedure Control Desk at ProcedureControl@caiso.com with any questions.

California Independent System Operator | P.O. Box 639014 | Folsom, CA 95630 | United States
Copyright © 2023 California Independent System Operator. All rights reserved.