RC West has revised the operating procedures referenced below.
RC0600 RC West Implementation of Common Interconnection-wide Methodology, version 3.2, effective Jan. 1, 2024.
Annual Review: Minor formatting and update in references section.
RC0600A Western Interconnection Modeling and Monitoring Common Methodology, version 5.0, effective Jan. 1, 2024.
Annual Review: No content changes to this document were requested.
RC0620 Operations Planning Analysis (Next Day), version 2.2, effective Dec. 13, 2023.
Periodic Review: Updated instance of ISO to CAISO, minor formatting and grammar edit. No other content changes.
RC0630 Outage Coordination Process, version 2.1, effective Dec. 13, 2023.
Periodic Review: Replaced instances of ISO RC with RC West. Replaced instances of ISO with CAISO, where appropriate. Updated IRO-010 & TOP-003 North American Electric Reliability Corporation (NERC) Standard references. Minor formatting and grammar edits.
The California ISO’s operating procedures are available on the Operating Procedures webpage.