Library

Energy storage meter considerations

The ISO and CPUC have various metering requirements for energy storage resources that are connecting to the grid that should be considered in the meter design phase of the project. As an example, the CPUC requirements require retail metering for station service if the battery is not charging or discharging.

2 Documents

2 of 2 results
Title Type Posted
CPUC - Station Power Decision 1.07 MB
Decision 09/07/2021, 3:17 PM
Aug 17, 2018 Tariff Amendment - Energy Storage and Distributed Energy Resources Phase 2 Enhancements (ER18-2242) 3.94 MB
Filing 08/20/2018, 8:34 AM
No results
Back to top