Library

CAISO IRP 38MMT PSP Stochastic and Deterministic PLEXOS Models with CEC 2019 IEPR Load Forecast

The ISO posts both stochastic and deterministic models of the CPUC 2019-20 IRP 38 million metric ton (MMT) Core Portfolio (as of January 2022) with the CEC 2019 IEPR load forecast. The modeling results were referenced in the ISO’s Opening Comments, submitted on Sept. 27, 2021.

3 Documents

3 of 3 results
Title Type Posted
CAISO Integrated Resource Planning 38MMT Core Portfolio PLEXOS Deterministic 2026 and 2030 78.64 MB
Report 02/11/2022, 9:26 AM
CAISO Integrated Resource Planning 38MMT Core Portfolio PLEXOS Stochastic 2030 226.21 MB
Report 02/11/2022, 9:26 AM
CAISO Integrated Resource Planning 38MMT Core Portfolio PLEXOS Stochastic 2026 243.04 MB
Report 02/11/2022, 9:26 AM
No results
Back to top