Skip Ribbon Commands
Skip to main content
Sign In

 

  • Local capacity requirements process - archive
    The ISO performs annual studies to identify the minimum local resource capacity required in each local area to meet established reliability criteria. As part of this study process, the ISO obtains input from stakeholders on the criteria, methodology and assumptions used as inputs into the studies, and feedback on the study results. Based on the study results, load serving entities receive a proportional allocation of the minimum required local resource capacity by transmission access charge area, and submit resource adequacy plans to show that they have procured the necessary capacity.
    • 2021 Local capacity requirements process
    • 2020 Local capacity requirements process
    • 2019 Local capacity requirements process
    • 2018 Local capacity requirements process
    • 2017 Local capacity requirements process
    • 2016 Local capacity requirements process
    • 2015 Local capacity requirements process
    • 2014 Local capacity requirements process
    • 2013 Local capacity requirements process
    • 2012 Local capacity requirements process
    • 2011 Local capacity requirements process
    • 2010 Local capacity requirements process
    • 2009 Local capacity requirements process
    • 2008 Local capacity requirements process
    • 2007 Local capacity requirements process
    • 2006 Local capacity requirements process
    • Local capacity requirements - papers and proposals archive
    • LCR Study Advisory Group (LSAG) Meeting 06-Nov-2006
    • LCR Study Advisory Group (LSAG) Meeting 20-Oct-2006
    • LCR Study Advisory Group (LSAG)