T-106 Pacific DC Intertie Transmission LineVersion 3.7 pdf 102K Summary:Provides guidelines for the operation of the CAISO controlled portion of the PDCI Transmission Line and its terminal facilities, and scheduling of Energy on the CAISO controlled portion of the PDCI Transmission Line. Version 3.7. Effective Date 5/1/2008 Document Locations: |