California ISO
   
Search

T-109 CAISO Interconnection Switching

Version 2.0

pdf 212K

Summary:


Operating Procedure T-109 CAISO Interconnection Switching, Version No. 2.0, Effective Date: 10/12/06, Distribution Restriction: None


Extract:

This procedure provides CAISO dispatchers with general instructions for the switching of Interconnection facilities. Includes instructions for each Interconnection based on CAISO switching rules and guidelines, Participating Transmission Owner (PTO) instructions, the Interconnected Control Area Operating Agreements with adjacent Balancing Areas, and the established procedures for Interconnected Balancing Authorities.


Document Locations:

© 2005 -  California ISO
All Rights Reserved
Sitemap  Privacy Policy  Legal Notice  Tell Us What You Think