|
||||||
E-503 Under-Frequency Load SheddingVersion 1.6 pdf 248K Summary:Operating Procedure E-503 Under-Frequency Load Shedding, Version No. 1.6, Effective 11/16/2006, Distribution Restriction: None Extract:Provides guidance for Load restoration in coordination with Participating Transmission Owners (PTOs), Utility Distribution Companies (UDCs), Metered Subsystems (MSSs) and Participating Generators (PGs) following Under-Frequency Load Shedding (UFLS) caused by frequency decay and describes the restoration activities directed by the CAISO. Document Locations: |