California ISO
   
Search

E-508A Load Shedding Guide

Version 7.1

pdf 72K

Summary:


When a subset of UDCs/MSSs have an insufficient showing for Resource Adequacy, the under-scheduled UDC or MSS will be required to shed Load proportional to the amount of Load that they are deficient. If the RA deficient Load-Shedding did not yield adequate Load-Shedding, then fixed Pro-Rata Load-Shedding by all UDCs and MSSs may be required.


Document Locations:

© 2005 -  California ISO
All Rights Reserved
Sitemap  Privacy Policy  Legal Notice  Tell Us What You Think