E-508A Load Shedding GuideVersion 8.0 pdf 71K Summary:When a subset of UDCs/MSSs have an insufficient showing for Resource Adequacy, the under-scheduled UDC or MSS will be required to shed Load proportional to the amount of Load that they are deficient. If the RA deficient Load-Shedding did not yield adequate Load-Shedding, then fixed Pro-Rata Load-Shedding by all UDCs and MSSs may be required. Document Locations: |