|
||||||
M-423 Scheduling the Use of Existing Transmission Contract RightsVersion 3.6 pdf 265K Summary:Operating Procedure M-423, Scheduling the Use of Existing Transmission Contract Rights and Transmission Ownership Rights, Version No. 3.6, Effective: 7/7/06, Distribution Restriction: None Extract:This procedure describes the 1) Processes and requirements for scheduling the use of Existing Transmission Contract (ETC) rights and, where applicable, Transmission Ownership Rights (TOR) in the CAISO Balancing Authority (BA) and 2) CAISO’s scheduling system software functionality that supports these purposes. Document Locations: |