Revised Proposed CAISO Tariff Languagepdf 172K Summary:Large Generating Facility Centralized Interconnection, CAISO WORKING DRAFT – LONG-TERM LGIP Extract:The objective of this LGIP is to implement FERC’s Order No. 2003 setting forth the requirements for Large Generating Facility interconnections to the ISO Controlled Grid. Document Locations: |