California ISO
Public & Media Operations Center
Operations Center

Operating Procedures: Draft Procedures

Back to Previous Page
 Download Adobe Reader
TERMS OF ACCESS

Actual ISO operations are based upon system conditions and prudent practice. System conditions may warrant deviation from written procedures. The Shift Manager will determine the need for such deviation. The ISO reserves the sole right to revise or edit these Procedures in accordance with Operating Procedure A-02.

The following information is not available in this public posting of the ISO Operating Procedures due to security or confidentiality reasons: third party operating procedures and unit specific data is not being provided pending ISO and third party confidentiality review; names and phone numbers are excluded for privacy and security reasons; and emergency restoration procedures are not included due to security considerations.

Comments, Concerns? Contact the Procedure Control Desk at: procctrldesk@caiso.com

Request for Notification of Draft Operating Procedures
If you want to receive notifications for various DRAFT CAISO Operating Procedures then fill out the attached spreadsheet and save it to your desktop and then e-mail it to the CAISO Operating Procedure Control Desk at procctrldesk@caiso.com.
xls 48K | Abstract | 05/02/2005 14:34
MRTU Operating Procedures: Draft Procedures

© 2005 -  California ISO
All Rights Reserved
Sitemap  Privacy Policy  Legal Notice  Tell Us What You Think