S-301 Unscheduled Flow

S-301 Unscheduled Flow
Version 6.2
pdf 194K | Abstract | 12/29/2009 09:02
S-301A WECC Unscheduled Flow Reduction Procedure
pdf 213K | Abstract | 10/02/2009 16:10
S-301C WECC UFAS Admin Practice 002 - Qualified Path Loading Required to Request Relief of Unscheduled Flow
pdf 67K | Abstract | 07/06/2009 12:48
S-301D WECC UFAS Practice 005 - Rapid Advancement to Latter Steps of Procedure
pdf 82K | Abstract | 07/06/2009 12:51
S-301E Determining Qualified Path Values for USF
Version 1.3
pdf 366K | Abstract | 05/06/2009 09:36

S-303 Interchange Schedule Curtailments

S-303 Interchange Schedule Curtailments
Version 3.1
pdf 84K | Abstract | 12/31/2009 15:44

S-304 Manual Dispatch and Interchange Scheduling of Real-Time Energy

S-304 Manual Dispatch and Interchange Scheduling of Real-Time Energy
Version 5.1
pdf 103K | Abstract | 05/04/2009 15:07

S-310 Inadvertent Interchange Payback

S-310 Inadvertent Interchange ATEC Payback
Version 3.2
pdf 139K | Abstract | 07/27/2009 16:29

S-311 Real-time and After the Fact Check-Out Requirements

S-311 Real-Time and After-the-Fact Check-Out Requirements
Version 5.1
pdf 128K | Abstract | 08/27/2009 11:24

S-312 Preschedule Check-Out Requirements

S-312 Pre-Schedule Check-Out Requirements
Version 4.1
pdf 68K | Abstract | 08/12/2009 07:42

S-313 NERC Tagging Requirements

S-313 NERC Tagging Requirements
Version 5.1
pdf 132K | Abstract | 07/31/2009 13:54
S-313A - POR/POD-Scheduling Path Cross Reference
Version 8.1
pdf 199K | Abstract | 02/19/2010 08:29

S-315 Emergency Overload Mitigation Procedure for Stability Rated Paths

S-315 Emergency Overload Mitigation for Stability Rated Paths
Version 4.2
pdf 56K | Abstract | 09/09/2009 08:16
S-315A COI Path Operator N-S Emergency Overload Mitigation
Version 8.0
pdf 55K | Abstract | 10/16/2009 07:58

S-318 Exceptional Dispatch (Out of Market) Interchange Transactions

S-318 Exceptional Dispatch Non-Market Interchange Transactions
Version 4.6
pdf 106K | Abstract | 10/09/2009 11:03

S-320 Eldorado MSL Scheduling

S-320 Eldorado (Eldorado-Moenkopi-Four Corners) MSL Scheduling
Version 4.2
pdf 422K | Abstract | 11/18/2009 09:43

S-322 Transmission Reliability Margin (TRM) and Capacity Benefit Margin (CBM)

S-322 Transmission Reliability Margin (TRMs) and Capacity Benefit Margin (CBMs)
Version 5.0
pdf 80K | Abstract | 08/13/2009 13:30

S-326 Southern Cities Market Transmission Outage Management and Interchange Scheduling

S-326 Southern Cities Market Transmission Outage Management and Interchange Scheduling
Version 4.0
pdf 138K | Abstract | 03/31/2009 10:04
S-326G NERC Tags and SIBR Market Bid
Version 4.0
pdf 37K | Abstract | 03/31/2009 10:06

S-330 CRN Transfer - Day Ahead

S-330 CRN Transfer - Day-Ahead
Version 2.1
pdf 91K | Abstract | 05/29/2009 10:52
S-330A Secondary CRN Request
Version 1.1
xls 285K | Abstract | 10/02/2009 14:25