California ISO
Public & Media Operations Center
Operations Center

Operating Procedures: Transmission

Back to Previous Page
 Download Adobe Reader

T-102 COI/PDCI North of John Day Nomogram

T-102 COI/PDCI North of John Day Nomogram
Version 7.2
pdf 125K | Abstract | 05/06/2008 11:38

T-103 East-of-River/Southern California Import Transmission Nomogram (SCIT)

T-103 EOR - SCIT
Version 8.0
pdf 119K | Abstract | 05/06/2008 11:36
T-103A EOR - SCIT Nomogram
Version 8.5
pdf 27K | Abstract | 05/06/2008 14:44
T-103B SCIT Nomogram Axis and Reduction Tables
Version 6.8
pdf 79K | Abstract | 11/06/2007 07:37

T-105 Voltage and VAR Control

T-105 Voltage and VAR Control
Version 3.3
pdf 67K | Abstract | 04/16/2008 15:45

T-106 Pacific DC Intertie Transmission Line

T-106 Pacific DC Intertie Transmission Line
Version 3.7
pdf 102K | Abstract | 05/02/2008 09:52

T-107 HVAC Transmission Operating Procedure

T-107 HVAC Transmission Operating Procedure
Version 1.5
pdf 246K | Abstract | 09/25/2006 16:15

T-109 CAISO Interconnection Switching

T-109 CAISO Interconnection Switching
Version 2.0
pdf 212K | Abstract | 02/06/2007 13:26

T-113 Scheduled and Forced Outages


Attachments A, F, G and H are not posted for security reasons.
T-113 Scheduled and Forced Outages
Version 6.1
pdf 258K | Abstract | 05/07/2008 08:47
T-113B Transmission Outage Request
Version 2.3
doc 193K | Abstract | 12/19/2007 15:25
T-113D Status of Emissions Limitations
Version 1.1
doc 235K | Abstract | 12/19/2007 15:27
T-113E Outages to Connect New or Re-arranged Facilities
Version 2.3
pdf 100K | Abstract | 11/06/2006 16:30
T-113I Generation Facility(ies) Outage Notification Process
Version 1.2
pdf 24K | Abstract | 12/19/2007 15:29
T-113K CAISO Outage Management Seniority Lottery Draft
Version 1.1
pdf 28K | Abstract | 12/19/2007 15:31
T-113L SC SLIC Web Client
Version 2.0
pdf 1296K | Abstract | 01/22/2004 10:59
T-113M PTO SLIC Web Client
Version 2.0
pdf 1114K | Abstract | 01/21/2004 15:03
T-113N Outage Reporting
Version 2.1
pdf 34K | Abstract | 12/19/2007 15:34
T-113O Transmission Induced Generation Outages
Version 2.0
pdf 39K | Abstract | 04/29/2008 11:04

T-116 AC/DC Nomogram for North-to-South Flow and COI Nomogram for South-to-North Flows

T-116 AC/DC Nomogram for North-to-South Flow
Version 15.0
pdf 209K | Abstract | 03/31/2008 14:44
T-116A 2008 Heavy Spring AC/DC North-to-South Nomogram
Version 15.5
pdf 115K | Abstract | 03/31/2008 14:46
T-116Q Quick Reference - Operations Summary for the COI and the PDCI
Version 6.5
pdf 127K | Abstract | 03/31/2008 14:48

T-121Z Effectiveness Factors & Ratings - SMUD Control Area

T-121Z Effectiveness Factors & Ratings - SMUD Balancing Area
Version 1.3
pdf 119K | Abstract | 08/16/2006 08:58

T-129Z Effectiveness Factors - Fresno Area

T-129Z Fresno Area Effectiveness Factors
Version 4.7
pdf 98K | Abstract | 02/14/2008 16:08

T-132C San Diego Area Limits Summary

T-132C San Diego Area Limits Summary
Version 1.8
pdf 149K | Abstract | 06/05/2007 14:07

T-133Z Effectiveness Factors - Bay Area

T-133Z Effectiveness Factors - Bay Area
Version 8.0
pdf 97K | Abstract | 04/01/2008 08:25

T-137Z Effectiveness Factors – Serrano 500/220 kV AA Transformer Bank

T-137Z Effectiveness Factors - Serrano 500/220 kV AA Transformer Bank
Version 2.0
pdf 63K | Abstract | 05/09/2008 13:17

T-138Z Effectiveness Factors & Ratings - Humboldt Area

T-138Z Effectiveness Factors and Ratings - Humboldt Area
Version 2.0
pdf 35K | Abstract | 04/01/2008 08:28

T-139Z Effectiveness Factors - Mira Loma 500/230 kV

T-139Z Effectiveness Factors - Mira Loma 500/230 kV
Version 1.2
pdf 172K | Abstract | 07/27/2007 15:33

T-151Z Effectiveness Factors - North Geysers

T-151Z Effectiveness Factors - North Geysers
Version 2.0
pdf 24K | Abstract | 04/01/2008 08:44

T-152 Huntington Beach Power Plant Units 1-4 Split Bus Operation

T-152 Huntington Beach Power Plant Units 1-4 Split Bus Operation
Version 1.4
pdf 23K | Abstract | 11/22/2004 14:13

T-154 Drum Area

T-154A Drum Area/Summit Inter-Tie Operations
Version 5.0
pdf 298K | Abstract | 04/02/2007 09:36
T-154Z Drum Area Effectiveness Factors
Version 1.0
pdf 8K | Abstract | 09/15/2005 11:24

T-156 Path 59 (CAISO-WALC Blythe Tie)


Main procedure not posted for security reasons
T-156A Path 59 Scheduling Capability Nomogram
Version 1.1
pdf 25K | Abstract | 11/09/2007 15:36
T-156B Blythe - Eagle Mountain 161 kV Line Security Constrained Limit
Version 1.1
pdf 24K | Abstract | 11/09/2007 15:38

T-165Z Palermo - Rio Oso Area Effectiveness Factors

T-165Z Palermo - Rio Oso Area Effectiveness Factors
Version 2.6
pdf 41K | Abstract | 05/06/2008 11:33

T-167Z Tesla/Bellota Area Effectiveness Factors

T-167Z Tesla/Bellota Area Effectiveness Factors
Version 3.0
pdf 29K | Abstract | 04/01/2008 08:54

T-171Z Effectiveness Factors – Antelope-Vincent 220 kV

T-171Z Effectiveness Factors – Antelope-Vincent 220 kV
Version 1.1
pdf 29K | Abstract | 09/20/2007 08:41

T173-Z Effectiveness Factors - Westley Operations

T-173Z Effectiveness Factors - Westley Operations
Version 1.0
pdf 72K | Abstract | 06/22/2007 12:40

T-174Z Effectiveness Factors - Parker - Gene

T-174Z Effectiveness Factors - Parker - Gene
Version 1.0
pdf 112K | Abstract | 04/19/2006 08:48

T175Z Effectiveness Factors West of Devers

T-175Z Effectiveness Factors West of Devers
Version 3.0
pdf 134K | Abstract | 03/04/2008 08:30

© 2005 -  California ISO
All Rights Reserved
Sitemap  Privacy Policy  Legal Notice  Tell Us What You Think