|
T-102 COI/PDCI North of John Day Nomogram
|
T-102 COI/PDCI North of John Day Nomogram Version 7.3 pdf 135K | Abstract | 06/03/2008 10:18
|
|
|
T-103 East-of-River/Southern California Import Transmission Nomogram (SCIT)
|
T-103 EOR - SCIT Version 8.2 pdf 120K | Abstract | 09/24/2008 11:13
|
T-103A EOR - SCIT Nomogram Version 8.5 pdf 27K | Abstract | 06/03/2008 10:21
|
T-103B SCIT Nomogram Axis and Reduction Tables Version 6.8 pdf 79K | Abstract | 11/06/2007 07:37
|
|
|
T-105 Voltage and VAR Control
|
T-105 Voltage and VAR Control Version 3.3 pdf 67K | Abstract | 04/16/2008 15:45
|
|
|
T-106 Pacific DC Intertie Transmission Line
|
T-106 Pacific DC Intertie Transmission Line Version 3.7 pdf 102K | Abstract | 05/02/2008 09:52
|
|
|
T-107 HVAC Transmission Operating Procedure
|
T-107 HVAC Transmission Operating Procedure Version 1.5 pdf 246K | Abstract | 09/25/2006 16:15
|
|
|
T-109 CAISO Interconnection Switching
|
T-109 CAISO Interconnection Switching Version 2.0 pdf 212K | Abstract | 02/06/2007 13:26
|
|
|
T-113 Scheduled and Forced Outages
Attachments A, F, G and H are not posted for security reasons.
|
T-113 Scheduled and Forced Outages Version 7.1 pdf 303K | Abstract | 10/09/2008 16:18
|
T-113B Transmission Outage Request Version 2.3 doc 193K | Abstract | 12/19/2007 15:25
|
T-113D Status of Emissions Limitations Version 1.1 doc 235K | Abstract | 12/19/2007 15:27
|
T-113E Outages to Connect New or Re-arranged Facilities Version 2.3 pdf 100K | Abstract | 11/06/2006 16:30
|
T-113I Generation Facility(ies) Outage Notification Process Version 1.2 pdf 24K | Abstract | 12/19/2007 15:29
|
T-113K CAISO Outage Management Seniority Lottery Draft Version 1.1 pdf 28K | Abstract | 12/19/2007 15:31
|
T-113L SC SLIC Web Client Version 2.0 pdf 1296K | Abstract | 01/22/2004 10:59
|
T-113M PTO SLIC Web Client Version 2.0 pdf 1114K | Abstract | 01/21/2004 15:03
|
T-113N Outage Reporting Version 2.2 pdf 44K | Abstract | 09/26/2008 16:04
|
T-113O Transmission Induced Generation Outages Version 2.0 pdf 39K | Abstract | 04/29/2008 11:04
|
|
|
T-116 AC/DC Nomogram for North-to-South Flow and COI Nomogram for South-to-North Flows
|
T-116 AC/DC Nomogram for North-to-South Flow Version 15.1 pdf 168K | Abstract | 06/03/2008 10:24
|
T-116A - 2008 Heavy Summer AC/DC North-to-South Nomogram Version 15.6 pdf 26K | Abstract | 06/04/2008 14:28
|
T-116Q Quick Reference - Operations Summary for the COI and the PDCI Version 7.0 pdf 128K | Abstract | 07/08/2008 16:24
|
|
|
T-121Z Effectiveness Factors & Ratings - SMUD Control Area
|
T-121Z Effectiveness Factors & Ratings - SMUD Balancing Area Version 1.3 pdf 119K | Abstract | 08/16/2006 08:58
|
|
|
T-129Z Effectiveness Factors - Fresno Area
|
T-129Z Fresno Area Effectiveness Factors Version 4.7 pdf 102K | Abstract | 08/27/2008 09:13
|
|
|
T-132C San Diego Area Limits Summary
|
T-132C San Diego Area Limits Summary Version 1.8 pdf 48K | Abstract | 09/29/2008 15:46
|
|
|
T-133Z Effectiveness Factors - Bay Area
|
T-133Z Effectiveness Factors - Bay Area Version 8.0 pdf 97K | Abstract | 04/01/2008 08:25
|
|
|
T-137Z Effectiveness Factors – Serrano 500/220 kV AA Transformer Bank
|
T-137Z Effectiveness Factors - Serrano 500/220 kV AA Transformer Bank Version 2.0 pdf 63K | Abstract | 05/09/2008 13:17
|
|
|
T-138Z Effectiveness Factors & Ratings - Humboldt Area
|
T-138Z Effectiveness Factors and Ratings - Humboldt Area Version 2.0 pdf 35K | Abstract | 04/01/2008 08:28
|
|
|
T-139Z Effectiveness Factors - Mira Loma 500/230 kV
|
T-139Z Effectiveness Factors - Mira Loma 500/230 kV Version 1.2 pdf 172K | Abstract | 07/27/2007 15:33
|
|
|
T-151Z Effectiveness Factors - North Geysers
|
T-151Z Effectiveness Factors - North Geysers Version 3.0 pdf 30K | Abstract | 08/27/2008 08:33
|
|
|
T-152 Huntington Beach Power Plant Units 1-4 Split Bus Operation
|
T-152 Huntington Beach Power Plant Units 1-4 Split Bus Operation Version 1.4 pdf 23K | Abstract | 11/22/2004 14:13
|
|
|
T-154 Drum Area
|
T-154A Drum Area/Summit Inter-Tie Operations Version 5.0 pdf 298K | Abstract | 04/02/2007 09:36
|
T-154Z Drum Area Effectiveness Factors Version 1.0 pdf 8K | Abstract | 09/15/2005 11:24
|
|
|
T-156 Path 59 (CAISO-WALC Blythe Tie)
Main procedure not posted for security reasons
|
T-156A Path 59 Scheduling Capability Nomogram Version 1.1 pdf 25K | Abstract | 11/09/2007 15:36
|
T-156B Blythe - Eagle Mountain 161 kV Line Security Constrained Limit Version 1.1 pdf 24K | Abstract | 11/09/2007 15:38
|
|
|
T-165Z Palermo - Rio Oso Area Effectiveness Factors
|
T-165Z Effectiveness Factors Palermo -Rio Oso Area Version 2.8 pdf 149K | Abstract | 07/07/2008 08:59
|
|
|
T-167Z Tesla/Bellota Area Effectiveness Factors
|
T-167Z Tesla/Bellota Area Effectiveness Factors Version 3.0 pdf 29K | Abstract | 04/01/2008 08:54
|
|
|
T-171Z Effectiveness Factors – Antelope-Vincent 220 kV
|
T-171Z Effectiveness Factors – Antelope-Vincent 220 kV Version 1.1 pdf 29K | Abstract | 09/20/2007 08:41
|
|
|
T173-Z Effectiveness Factors - Westley Operations
|
T-173Z Effectiveness Factors - Westley Operations Version 1.0 pdf 72K | Abstract | 06/22/2007 12:40
|
|
|
T-174Z Effectiveness Factors - Parker - Gene
|
T-174Z Effectiveness Factors - Parker - Gene Version 1.0 pdf 112K | Abstract | 04/19/2006 08:48
|
|
|
T175Z Effectiveness Factors West of Devers
|
T-175Z Effectiveness Factors West of Devers Version 3.0 pdf 134K | Abstract | 03/04/2008 08:30
|
|