ISO Logo
 
Notice
March 29, 2022

REQUESTED ACTION

Request for Comment

CATEGORIES

Legal & Regulatory

BPM Change Management: Proposed Revision Requests and Updated BPMs Posted as of 3/29/22


MESSAGE

The California ISO has posted new Proposed Revision Requests (PRRs) reflecting edits to Business Practice Manuals (BPM). Revised BPMs that have completed the BPM change management process are posted in the BPM Library. All PRRs and related activity are publicly available through the BPM change management site.

 

BPM PRR updates are part of the ISO Daily Briefing in addition to being listed in the “Announcement” sections of the BPM change management tool. These updates include PRRs that have become available for review, upcoming BPM meetings, and comment due dates. All registered BPM users should continue to reference the BPM Change Management tool to see current PRR status. Subscribe to the Daily Briefing to stay up to date.

 

The PRRs listed below have an open 10-business day comment or appeal period from March 29, 2022 through April 12, 2022.

 

New PRRs

 

PRR 1412

Scheduling Coordinator Certification and Termination BPM, Emergency PRR, Updating energy imbalance market acronym and adding sub entity to application

PRR 1413

Market Operations BPM, Small updates to align with CAISO move from alert, warning or emergency notice staged alerts to NERC EEA emergency language

PRR 1414

Market Instruments BPM, Change to short and long start definitions

PRR 1415

Market Operations BPM, Change to short and long start definitions

 

PRR 1417

Generator Interconnection and Deliverability Allocation Procedures BPM, Updating section title to "Notifying the CAISO and affected Participating TO(s) for a study"

PRR 1419

Settlements and Billing BPM, Updated charge code 6456 to implement changes related to the Tariff clarification filing

PRR 1420

Generator Interconnection and Deliverability Allocation Procedures BPM, Eliminate the use of the least squares methodology for allocating deliverability

PRR 1421

Settlements and Billing BPM, Updated multiple BPM configuration guides to accommodate invoicing issues discovered during functional testing of shortfall charge codes that have never been run in settlements production since their inception

PRR 1422

Settlements and Billing BPM, Updated multiple BPM configuration guides for charge code 6045 over and under scheduling western energy imbalance market settlement and 6046 over and under scheduling western energy imbalance market allocation to accommodate MIAF 2021-100

PRR 1423

Reliability Requirements BPM, Contract management 2021 updates

PRR 1424

Reliability Requirements BPM, Short-long start definitions update

PRR 1425

Settlements and Billing BPM, Updated charge code pre calc metered subsystem deviation quantity to capture spin/non-spin instructed imbalance energy under scenarios where the resource was exceptionally dispatched in a non-contingency interval

PRR 1426

Settlements and Billing BPM, Update configuration guides to support short-long start unit definitions update initiative

PRR 1427

Settlements and Billing BPM, Updated BPM for settlements and billing to accommodate aligning with annual FERC settlement process defined in charge codes 550 and 551 FERC fee settlement

PRR 1428

Generator Interconnection Procedures BPM, Contract management enhancement updates for modifications and re-studies for serial projects

PRR 1429

Market Operations BPM, Guidance for scheduling coordinators to register high priority wheels

PRR 1430

Generator Management BPM, 2021 Contract management enhancements initiative updates

 

ISO Recommendations

 

PRR 1402

Market Instruments BPM, Updates to after-market cost recovery and reference level calculator change requests for Extremely Long Start resources

PRR 1406

Market Operations BPM, Emergency PRR, Activation of minimum constraint in real time dispatch

PRR 1407

Transmission Planning Process BPM, Emergency PRR, Implementation of the outcome resulting from the maximum import capability

PRR 1408

Reliability Requirements BPM, Emergency PRR, Implementation of the outcome resulting from the maximum import capability

PRR 1409

Settlements and Billing BPM, Update configuration guides to reflect fix to reliability must run adjustments for startup cost

PRR 1410

Settlements and Billing BPM, Update configuration guides to reflect joint-owned units pilot initiative settlement

PRR 1411

Market Operations BPM, Update to penalty prices used to determine when the security constrained unit commitment and security constrained economic dispatch software will relax an enforced transmission constraint

 

 

ISO Final Decisions

 

PRR 1403

Market Operations BPM, Treatment of expected energy for non-participating energy imbalance market resources

PRR 1404

Market Operations BPM, Market operations BPM edits related to energy storage and distributed energy resources phase 4 cleanup

PRR 1405

 

Market Instruments BPM, Market instruments BPM edits related to energy storage and distributed energy resources phase 4 cleanup

 

BPM Library Updates

The reference document on the ISO website lists the updated BPMs in the library.

 

The ISO may unilaterally make and implement revisions to the BPMs in emergency circumstances, as set forth in Sections 22.4.3 and 22.11 of the ISO Tariff and in Section 2.6 of the Business Practice Manual for BPM Change Management. An emergency PRR will continue through the BPM change management stakeholder process to obtain stakeholder input on the revisions and make other recommendations, as necessary.

 

Please note that affected parties must register in order to submit a PRR or written comments.

 

More information on the BPM change management process is available on the BPM webpage of the ISO website.

 


CONTACT INFORMATION

Nicole Hines at 916-608-5862 or BPM_CM@caiso.com

Engage with us!
isoball twitterball RSSball Facebookball YouTube
Daily Briefing
Sign up
for
Daily Briefing
ISO Today
Download
ISO Today
Flex Alerts
Sign up
for
Flex Alerts

California Independent System Operator | P.O. Box 639014 | Folsom, CA 95630 | United States