ISO Logo
 
Market Notice
June 11, 2019

REQUESTED ACTION

Forward to Operating Department

CATEGORIES

System Operations

Notification of Revised ISO Operating Procedure 4420

MESSAGE

The California ISO has revised the operating procedure referenced below.

 

4420 System Emergency, version 12.0, effective June 11, 2019.

Annual Review:

Section 3.4: Removed Steps 19, 20, 22 and 23 to remove declaration of Energy Emergency Alert 2 (EEA2) and Energy Emergency Alert 3 (EEA3), per updated Reliability Coordinator (RC) procedures.

Section 3.5: Updated WECC Standard BAL-002 reference.

Section 3.5.2: Moved Steps 15, 16, and 17 to Steps 7, 8 and 9.

Sections 3.5.2, 3.5.3 and 3.5.4: Updated Step 5 note to be consistent with other notes regarding Shift Manager or designee to file DOE OE-417 if Emergency Response Coordinator (ERC) is unavailable.

Replaced Reliability Messaging Tool (RMT) with Reliability messaging system throughout.

Replaced Peak RC with the RC under Operationally Affected Parties.

References Section: Removed BAL-004 reference from NERC Requirements.

Minor format and grammar updates.

 

ISO Operating Procedures - http://www.caiso.com/rules/Pages/OperatingProcedures/Default.aspx


CONTACT INFORMATION

ISO Procedure Control Desk at procctrldesk@caiso.com

Engage with us!
isoball twitterball RSSball Facebookball YouTube
Daily Briefing
Sign up
for
Daily Briefing
ISO Today
Download
ISO Today
Flex Alerts
Sign up
for
Flex Alerts

California Independent System Operator | P.O. Box 639014 | Folsom, CA 95630 | United States