Curtailed and Non-Operational Generating Units
Resource ID Resource Name Outage Type Capacity (MW) Curtailed (MW) Zone Name
ALAMIT_7_UNIT 3 ALAMITOS GEN STA. UNIT 3 Forced 332.18 0.00 SCE Gen
ALTA3A_2_CPCE8 CPC East - Alta Wind 8 Forced 150.00 12.00 SCE Gen
ALTA4B_2_CPCW6 CPC West - Alta Wind 6 Forced 150.00 0.00 SCE Gen
ALTA6B_2_WIND11 Alta Wind 11 Forced 90.00 0.00 SCE Gen
ALTA6E_2_WIND10 Alta Wind 10 Forced 138.00 0.00 SCE Gen
BIGCRK_2_EXESWD BIG CREEK HYDRO PROJECT PSP Planned/Forced 820.00 163.00 SCE Gen
BISHOP_1_ALAMO BISHOP CREEK PLANT 2 AND 6 Planned/Forced 13.40 2.50 SCE Gen
BISHOP_1_UNITS BISHOP CREEK PLANT 3 AND 4 Forced 15.80 0.00 SCE Gen
BLAST_1_WIND Mountain View IV Wind Planned 49.00 0.00 SCE Gen
BOGUE_1_UNITA1 Feather River Energy Center, Unit #1 Forced 46.30 0.00 PGAE North
BORDER_6_UNITA1 CalPeak Power Border Unit 1 Planned 51.25 3.14 SDGE Gen
BRDWAY_7_UNIT 3 BROADWAY UNIT 3 Planned 65.00 65.00 SCE Gen
BUCKWD_1_QF Buckwind Re-powering project Forced 16.50 0.00 SCE Gen
CARBOU_7_PL4X5 CARIBOU PH 2 UNIT 4 & 5 AGGREGATE Forced 122.00 8.00 PGAE North
CHINO_7_MILIKN MN Milliken Genco LLC Planned 1.90 1.90 SCE Gen
COLCEM_6_UNITS CALIFORNIA PORTLAND CEMENT COMPANY Forced 25.00 0.00 SCE Gen
COLEMN_2_UNIT Coleman Planned 13.00 13.00 PGAE North
COLGAT_7_UNIT 1 COLGATE HYDRO UNIT 1 Planned 176.72 36.72 PGAE North
COLGAT_7_UNIT 2 COLGATE HYDRO UNIT 2 Planned/Forced 175.67 35.67 PGAE North
COLTON_6_AGUAM1 AGUA MANSA UNIT 1 (CITY OF COLTON) Forced 43.00 2.00 SCE Gen
COLUSA_2_PL1X3 Colusa Generating Station Forced 641.00 53.90 PGAE North
CONTRL_1_CASAD1 Mammoth G1 Forced 10.00 3.90 SCE Gen
CONTRL_1_CASAD3 Mammoth G3 Forced 14.00 3.40 SCE Gen
CONTRL_1_LUNDY LUNDY Planned 3.00 0.00 SCE Gen
CONTRL_1_RUSHCK RUSH CREEK Planned 11.94 0.00 SCE Gen
CRSTWD_6_KUMYAY Kumeyaay Wind Farm Planned/Forced 50.00 0.00 SDGE Gen
CSLR4S_2_SOLAR Csolar IV South Forced 130.00 0.00 SDGE Gen
DSRTSN_2_SOLAR1 Desert Sunlight 300 Forced 300.00 0.00 SCE Gen
DSRTSN_2_SOLAR2 Desert Sunlight 250 Forced 250.00 0.00 SCE Gen
DUTCH1_7_UNIT 1 DUTCH FLAT 1 PH Planned 22.00 0.00 PGAE North
DVLCYN_1_UNITS DEVIL CANYON HYDRO UNITS 1-4 AGGREGATE Forced 236.80 0.00 SCE Gen
ELCAJN_6_LM6K El Cajon Energy Center Forced 48.10 1.90 SDGE Gen
ELCAJN_7_GT1 EL CAJON Planned 16.36 0.00 SDGE Gen
ELSEGN_2_UN1011 El Segundo Energy Center 5/6 Forced 263.00 11.00 SCE Gen
ELSEGN_2_UN2021 El Segundo Energy Center 7/8 Forced 263.68 11.68 SCE Gen
ENERSJ_2_WIND ESJ Wind Energy Planned/Forced 155.10 6.60 SDGE Gen
ENWIND_2_WIND2 Ridgetop I Forced 65.00 49.30 SCE Gen
ESCNDO_6_PL1X2 MMC Escondido Aggregate Forced 48.71 0.00 SDGE Gen
ESCNDO_6_UNITB1 CalPeak Power Enterprise Unit 1 Planned 48.04 0.04 SDGE Gen
ETIWND_2_FONTNA FONTANALYTLE CREEK POWERHOUSE P Planned 2.56 2.36 SCE Gen
ETIWND_7_MIDVLY MN Mid Valley Genco LLC Planned 2.10 0.40 SCE Gen
ETIWND_7_UNIT 4 ETIWANDA GEN STA. UNIT 4 Forced 320.00 320.00 SCE Gen
FMEADO_7_UNIT FRENCH MEADOWS HYDRO Forced 18.00 2.10 PGAE North
GARNET_1_UNITS GARNET GREEN POWER PROJECT AGGREGATE Forced 16.50 3.00 SCE Gen
GARNET_1_WINDS Garnet Winds Aggregation Forced 22.50 1.50 SCE Gen
GLNARM_7_UNIT 2 GLEN ARM UNIT 2 Forced 22.30 22.30 SCE Gen
GRNLF1_1_UNITS GREENLEAF #1 COGEN AGGREGATE Forced 49.50 0.30 PGAE North
HAASPH_7_PL1X2 HAAS PH UNIT 1 & 2 AGGREGATE Forced 144.00 0.00 PGAE North
HARBGN_7_UNITS HARBOR COGEN COMBINED CYCLE Forced 109.01 9.01 SCE Gen
HIDSRT_2_UNITS HIGH DESERT POWER PROJECT AGGREGATE Forced 830.00 131.00 SCE Gen
INDIGO_1_UNIT 1 INDIGO PEAKER UNIT 1 Forced 44.00 6.00 SCE Gen
INDIGO_1_UNIT 2 INDIGO PEAKER UNIT 2 Forced 44.53 5.53 SCE Gen
INDIGO_1_UNIT 3 INDIGO PEAKER UNIT 3 Forced 43.69 5.69 SCE Gen
IVWEST_2_SOLAR1 Imperial Valley West ( Q # 608) Forced 150.00 0.00 SDGE Gen
KERRGN_1_UNIT 1 KERN RIVER HYDRO UNITS 1-4 AGGREGATE Forced 25.60 0.00 SCE Gen
LARKSP_6_UNIT 1 LARKSPUR PEAKER UNIT 1 Forced 46.10 4.10 SDGE Gen
LARKSP_6_UNIT 2 LARKSPUR PEAKER UNIT 2 Forced 47.98 5.98 SDGE Gen
LAROA1_2_UNITA1 LR1 Planned 180.00 180.00 SDGE Gen
LAROA2_2_UNITA1 LR2 Forced 322.00 17.00 SDGE Gen
MANZNA_2_WIND Manzana Wind Forced 189.00 0.00 SCE Gen
MONLTH_6_BOREL BOREL HYDRO UNITS 1-3 AGGREGATE Planned/Forced 11.00 11.00 SCE Gen
MOORPK_7_UNITA1 WEME- Simi Valley Landfill Forced 2.49 0.79 SCE Gen
MRCHNT_2_PL1X3 Desert Star Energy Center Forced 494.58 29.58 SCE Gen
MTWIND_1_UNIT 1 Mountain View Power Project I Planned/Forced 44.40 0.00 SCE Gen
MTWIND_1_UNIT 2 Mountain View Power Project II Planned/Forced 22.20 0.00 SCE Gen
MTWIND_1_UNIT 3 Mountain View Power Project III Planned/Forced 22.44 0.00 SCE Gen
NAROW1_2_UNIT NARROWS PH 1 UNIT Planned 12.00 12.00 PGAE North
OGROVE_6_PL1X2 Orange Grove Energy Center Forced 99.90 4.23 SDGE Gen
OMAR_2_UNIT 1 KERN RIVER COGENERATION CO. UNIT 1 Forced 78.00 6.50 SCE Gen
OMAR_2_UNIT 2 KERN RIVER COGENERATION CO. UNIT 2 Forced 78.11 4.71 SCE Gen
OMAR_2_UNIT 3 KERN RIVER COGENERATION CO. UNIT 3 Forced 81.41 5.51 SCE Gen
OTMESA_2_PL1X3 OTAY MESA ENERGY CENTER Forced 603.68 41.68 SDGE Gen
PACLUM_6_UNIT PACIFIC LUMBER (HUMBOLDT) Forced 28.80 28.80 PGAE North
PADUA_2_ONTARO ONTARIO/SIERRA HYDRO PSP Planned 1.92 1.56 SCE Gen
PANDOL_6_UNIT DELANO ENERGY COMPANY AGGREGATE Forced 49.00 3.00 SCE Gen
PANSEA_1_PANARO Mesa Wind Project Planned 30.00 0.00 SDGE Gen
PIT7_7_UNIT 1 PIT PH 7 UNIT 1 Forced 55.70 1.70 PGAE North
POTTER_6_UNITS Potter Valley Forced 10.10 8.30 PGAE North
PWEST_1_UNIT PACIFIC WEST 1 WIND GENERATION Forced 2.10 0.50 SCE Gen
RECTOR_2_KAWEAH KAWEAH PH 2 & 3 PSP AGGREGATE Forced 6.55 0.00 SCE Gen
RECTOR_2_KAWH 1 KAWEAH PH 1 UNIT 1 Planned 2.25 2.25 SCE Gen
REDOND_7_UNIT 5 REDONDO GEN STA. UNIT 5 Forced 178.87 178.87 SCE Gen
RENWD_1_QF Renwind re-powering project Forced 10.00 0.00 SCE Gen
ROSMDW_2_WIND1 Pacific Wind - Phase 1 Planned 140.00 4.00 SDGE Gen
RVSIDE_2_RERCU3 Riverside Energy Res. Ctr Unit 3 Forced 49.00 0.00 SCE Gen
RVSIDE_2_RERCU4 Riverside Energy Res. Ctr Unit 4 Forced 49.00 0.00 SCE Gen
RVSIDE_6_RERCU1 Riverside Energy Res. Ctr Unit 1 Forced 48.35 0.00 SCE Gen
RVSIDE_6_RERCU2 Riverside Energy Res. Ctr Unit 2 Forced 48.50 0.00 SCE Gen
SANTGO_6_COYOTE GAS RECOVERY SYS. (COYOTE CANYON) Forced 9.99 5.49 SCE Gen
SANWD_1_QF San Gorgonio Farms Wind Farm Forced 31.00 4.40 SCE Gen
SAUGUS_7_CHIQCN Chiquita Canyon Landfill Fac Forced 8.00 2.50 SCE Gen
SAUGUS_7_LOPEZ MM Lopez Energy Planned 6.10 1.00 SCE Gen
SBERDO_2_PSP3 Mountainview Gen Sta. Unit 3 Forced 525.00 8.00 SCE Gen
SBERDO_2_PSP4 Mountainview Gen Sta. Unit 4 Forced 525.00 8.00 SCE Gen
SBERDO_2_SNTANA SANTA ANA PSP Planned 6.95 3.85 SCE Gen
SBERDO_6_MILLCK MILL CREEK PSP Planned 3.93 3.23 SCE Gen
SPRGAP_1_UNIT 1 SPRING GAP HYDRO Forced 7.00 7.00 PGAE North
SPRGVL_2_TULESC TULE RIVER HYDRO PLANT (SCE) Forced 2.50 0.00 SCE Gen
SYCAMR_2_UNIT 1 Sycamore Cogeneration Unit 1 Planned 85.00 8.85 SCE Gen
SYCAMR_2_UNIT 2 Sycamore Cogeneration Unit 2 Planned 85.00 8.58 SCE Gen
SYCAMR_2_UNIT 3 Sycamore Cogeneration Unit 3 Planned 85.00 7.30 SCE Gen
SYCAMR_2_UNIT 4 Sycamore Cogeneration Unit 4 Planned 85.00 7.99 SCE Gen
TENGEN_2_PL1X2 Berry Cogen 42 Planned 40.20 3.20 SCE Gen
TERMEX_2_PL1X3 TDM Forced 625.00 16.00 SDGE Gen
TIFFNY_1_DILLON TIFFNY_1_DILLON Forced 45.00 1.00 SCE Gen
VACADX_1_NAS VACA-DIXON BATTERY Planned 1.85 0.00 PGAE North
VALLEY_7_BADLND VALLEY_7_BADLND Forced 1.30 1.30 SCE Gen
VALLEY_7_UNITA1 WM Energy, El Sobrante Landfill Forced 3.74 1.74 SCE Gen
VESTAL_2_KERN KERN RIVER PH 3 UNITS 1 & 2 AGGREGATE Forced 36.80 16.30 SCE Gen
VINCNT_2_WESTWD Oasis Power Plant Forced 60.00 6.00 SCE Gen
WALCRK_2_CTG1 Walnut Creek Energy Park Unit 1 Planned 96.43 0.00 SCE Gen
WALCRK_2_CTG2 Walnut Creek Energy Park Unit 2 Planned 96.91 0.00 SCE Gen
WALCRK_2_CTG3 Walnut Creek Energy Park Unit 3 Planned 96.65 0.00 SCE Gen
WALCRK_2_CTG4 Walnut Creek Energy Park Unit 4 Planned 96.49 0.00 SCE Gen
WALCRK_2_CTG5 Walnut Creek Energy Park Unit 5 Planned 96.65 0.00 SCE Gen
WALNUT_7_WCOVCT WALNUT_7_WCOVCT Forced 4.50 4.50 SCE Gen
WHTWTR_1_WINDA1 Whitewater Hill Wind Project Forced 61.50 22.50 SCE Gen
ADLIN_1_UNITS GEYSERS AIDLIN AGGREGATE Planned 22.00 6.00
ALAMIT_7_UNIT 3 ALAMITOS GEN STA. UNIT 3 Forced 332.18 0.00
ALLGNY_6_HYDRO1 Salmon Creek Hydroelectric Project Forced 0.52 0.00
ALMEGT_1_UNIT 1 ALAMEDA GT UNIT 1 Forced 23.80 23.80
ALTA3A_2_CPCE8 CPC East - Alta Wind 8 Forced 150.00 12.00
ALTA4B_2_CPCW6 CPC West - Alta Wind 6 Forced 150.00 0.00
BANGOR_6_HYDRO Virginia Ranch Dam Powerplant Forced 1.00 0.00
BCTSYS_5_PWXDYN BCTSYS_5_PWXDYN Forced 428.00 249.00
BDGRCK_1_UNITS BADGER CREEK LIMITED Forced 47.49 4.89
BEARMT_1_UNIT BEAR MOUNTAIN LIMITED Forced 47.49 1.29
BELDEN_7_UNIT 1 BELDEN HYDRO Forced 119.00 5.00
BIGCRK_2_EXESWD BIG CREEK HYDRO PROJECT PSP Planned/Forced 820.00 163.00
BISHOP_1_ALAMO BISHOP CREEK PLANT 2 AND 6 Planned/Forced 13.40 2.50
BISHOP_1_UNITS BISHOP CREEK PLANT 3 AND 4 Forced 15.80 0.00
BKRFLD_2_SOLAR1 Bakersfield 111 Forced 1.38 0.00
BLAST_1_WIND Mountain View IV Wind Planned 49.00 0.00
BLCKBT_2_STONEY BLACK BUTTE HYDRO Forced 6.20 0.00
BLKCRK_2_SOLAR1 McCoy Station Planned/Forced 250.00 213.00
BNNIEN_7_ALTAPH ALTA POWER HOUSE Planned 1.00 0.00
BOWMN_6_UNIT BOWMAN Planned 6.25 6.25
BRDSLD_2_HIWIND High Winds Energy Center Forced 162.00 12.60
BRDSLD_2_SHILO1 Shiloh I Wind Project Forced 150.00 1.50
BRDSLD_2_SHILO2 SHILOH WIND PROJECT 2 Planned/Forced 150.00 4.00
BRDSLD_2_SHLO3A Shiloh III Wind Project, LLC Forced 102.50 4.10
BRDSLD_2_SHLO3B Shiloh IV Wind Project Forced 100.00 4.00
BUCKCK_7_PL1X2 BUCKS CREEK AGGREGATE Forced 59.00 1.00
CATLNA_2_SOLAR2 Catalina Solar 2 Planned/Forced 18.00 0.00
CHALK_1_UNIT CHALK CLIFF LIMITED Forced 47.49 3.59
CHWCHL_1_BIOMAS Chow II Biomass to Energy Planned 10.80 1.80
CNTRVL_6_UNIT Centerville Forced 6.40 6.40
COCOPP_2_CTG1 Marsh Landing 1 Forced 204.20 14.45
COCOPP_2_CTG2 Marsh Landing 2 Forced 202.70 13.75
COCOPP_2_CTG3 Marsh Landing 3 Forced 208.96 20.42
COCOPP_2_CTG4 Marsh Landing 4 Forced 204.29 13.98
CONTRL_1_LUNDY LUNDY Planned 3.00 0.00
CONTRL_1_RUSHCK RUSH CREEK Planned 11.94 0.00
CORRAL_6_SJOAQN Ameresco San Joaquin Forced 4.30 0.00
COWCRK_2_UNIT Cow Creek Hydro Planned/Forced 2.00 2.00
CRNEVL_6_CRNVA Crane Valley Planned 0.90 0.90
CRNEVL_6_SJQN 2 SAN JOAQUIN 2 Planned 3.20 3.20
CRNEVL_6_SJQN 3 SAN JOAQUIN 3 Planned 4.20 4.20
CSTRVL_7_PL1X2 Marina Land Fill Gas Planned 4.53 1.53
DALYCT_1_FCELL PGE San Francisco State Fuel Cell Forced 1.60 1.60
DELTA_2_PL1X4 DELTA ENERGY CENTER AGGREGATE Forced 880.00 67.00
DINUBA_6_UNIT DINUBA GENERATION PROJECT Planned 12.00 4.00
DOUBLC_1_UNITS DOUBLE "C" LIMITED Forced 52.23 2.63
DSRTSN_2_SOLAR2 Desert Sunlight 250 Forced 250.00 0.00
DVLCYN_1_UNITS DEVIL CANYON HYDRO UNITS 1-4 AGGREGATE Forced 236.80 0.00
EEKTMN_6_SOLAR1 EE K Solar 1 Forced 20.00 0.00
ELKCRK_6_STONYG STONEY GORGE HYDRO AGGREGATE Forced 4.90 4.90
ELKHIL_2_PL1X3 ELK HILLS COMBINED CYCLE (AGGREGATE) Forced 551.70 254.70
ELNIDP_6_BIOMAS El Nido Biomass to Energy Planned 10.50 1.00
ELSEGN_2_UN1011 El Segundo Energy Center 5/6 Forced 263.00 11.00
ELSEGN_2_UN2021 El Segundo Energy Center 7/8 Forced 263.68 11.68
ENWIND_2_WIND1 Cameron Ridge Forced 47.10 31.40
ETIWND_2_FONTNA FONTANALYTLE CREEK POWERHOUSE P Planned 2.56 2.36
ETIWND_7_UNIT 4 ETIWANDA GEN STA. UNIT 4 Forced 320.00 320.00
EXCHEC_7_UNIT 1 EXCHEQUER HYDRO Forced 94.50 71.50
FORKBU_6_UNIT HYPOWER, INC. (FORKS OF BUTTE) Forced 14.30 14.30
GATWAY_2_PL1X3 GATEWAY GENERATING STATION Forced 562.50 33.90
GEYS11_7_UNIT11 GEYSERS UNIT 11 (HEALDSBURG) Planned/Forced 74.40 4.40
GEYS12_7_UNIT12 GEYSERS UNIT 12 (HEALDSBURG) Planned 57.00 10.00
GEYS13_7_UNIT13 GEYSERS UNIT 13 (HEALDSBURG) Planned 95.00 42.00
GEYS14_7_UNIT14 GEYSERS UNIT 14 (HEALDSBURG) Planned 70.00 20.00
GEYS16_7_UNIT16 GEYSERS UNIT 16 (HEALDSBURG) Planned 85.00 42.00
GEYS17_7_UNIT17 GEYSERS UNIT 17 (HEALDSBURG) Planned 60.00 4.00
GEYS18_7_UNIT18 GEYSERS UNIT 18 (HEALDSBURG) Planned 72.00 20.00
GEYS20_7_UNIT20 GEYSERS UNIT 20 (HEALDSBURG) Planned 62.00 27.00
GWFPWR_1_UNITS HANFORD PEAKER PLANT Forced 98.46 9.40
GYS5X6_7_UNITS GEYSERS UNITS 5 & 6 AGGREGATE Forced 85.00 0.00
GYS7X8_7_UNITS GEYSERS UNITS 7 & 8 AGGREGATE Forced 82.00 3.00
GYSRVL_7_WSPRNG Sonoma CWA Warm Springs Hydro Forced 3.75 2.46
HALSEY_6_UNIT HALSEY HYDRO Forced 13.50 13.50
HATRDG_2_WIND Hatchet Ridge Wind Farm Forced 102.00 3.10
HENRTA_6_UNITA1 GWF HENRIETTA PEAKER PLANT UNIT 1 Forced 49.98 5.74
HENRTA_6_UNITA2 GWF HENRIETTA PEAKER PLANT UNIT 2 Forced 49.42 5.28
HYTTHM_2_UNITS HYATT-THERMALITO PUMP-GEN (AGGREGATE) Forced 933.10 420.10
INTKEP_2_UNITS CCSF Hetch_Hetchy Hydro Aggregate Planned/Forced 405.00 91.00
INTMNT_3_RIVERSIDE IPPDYN Forced 137.00 1.00
KELSO_2_UNITS Mariposa Energy Forced 196.00 3.74
KERNFT_1_UNITS KERN FRONT LIMITED Forced 52.40 2.60
KERRGN_1_UNIT 1 KERN RIVER HYDRO UNITS 1-4 AGGREGATE Forced 25.60 0.00
KRNCNY_6_UNIT KERN CANYON Planned 11.50 1.00
LAPAC_6_UNIT LOUISIANA PACIFIC SAMOA Forced 20.00 20.00
LAPLMA_2_UNIT 1 La Paloma Generating Plant Unit #1 Forced 259.80 8.80
LAPLMA_2_UNIT 2 La Paloma Generating Plant Unit #2 Forced 260.20 5.20
LAPLMA_2_UNIT 3 La Paloma Generating Plant Unit #3 Forced 256.15 5.15
LAPLMA_2_UNIT 4 LA PALOMA GENERATING PLANT, UNIT #4 Forced 259.54 8.54
LASSEN_6_AGV1 AGV 1 Planned 1.80 1.80
LECEF_1_UNITS LOS ESTEROS ENERGY FACILITY AGGREGATE Forced 294.00 13.40
LIVOAK_1_UNIT 1 LIVE OAK LIMITED Forced 47.49 3.69
LMEC_1_PL1X3 Los Medanos Energy Center AGGREGATE Forced 561.29 297.29
LOCKFD_1_BEARCK Bear Creek Solar Forced 1.50 0.00
LOCKFD_1_KSOLAR Kettleman Solar Forced 1.00 0.00
LODIEC_2_PL1X2 Lodi Energy Center Forced 302.58 23.38
MALAGA_1_PL1X2 Malaga Power Aggregate Forced 96.00 0.00
MERCFL_6_UNIT MERCED FALLS Forced 3.50 3.50
METEC_2_PL1X3 Metcalf Energy Center Forced 593.16 18.16
MKTRCK_1_UNIT 1 MCKITTRICK LIMITED Forced 47.49 2.39
MONLTH_6_BOREL BOREL HYDRO UNITS 1-3 AGGREGATE Planned/Forced 11.00 11.00
MOORPK_7_UNITA1 WEME- Simi Valley Landfill Forced 2.49 0.79
MOSSLD_7_UNIT 7 MOSS LANDING UNIT 7 Forced 755.70 15.70
MTWIND_1_UNIT 1 Mountain View Power Project I Planned/Forced 44.40 0.00
MTWIND_1_UNIT 2 Mountain View Power Project II Planned/Forced 22.20 0.00
NCPA_7_GP2UN3 NCPA GEO PLANT 2 UNIT 3 Planned 42.42 42.42
OAK C_7_UNIT 1 OAKLAND STATION C GT UNIT 1 Forced 55.00 0.00
OAK C_7_UNIT 3 OAKLAND STATION C GT UNIT 3 Forced 55.00 0.00
OLDRIV_6_BIOGAS Bidart Old River 1 Forced 2.00 1.00
OMAR_2_UNIT 1 KERN RIVER COGENERATION CO. UNIT 1 Forced 78.00 6.50
OMAR_2_UNIT 2 KERN RIVER COGENERATION CO. UNIT 2 Forced 78.11 4.71
OMAR_2_UNIT 3 KERN RIVER COGENERATION CO. UNIT 3 Forced 81.41 5.51
ORLND_6_HIGHLI High Line Canal Hydro Forced 0.50 0.50
PADUA_2_ONTARO ONTARIO/SIERRA HYDRO PSP Planned 1.92 1.56
PINFLT_7_UNITS PINE FLAT HYDRO AGGREGATE Forced 210.00 0.00
PITTSP_7_UNIT 7 PITTSBURG UNIT 7 Planned 530.00 130.00
PMDLET_6_SOLAR1 SEPV Palmdale East, LLC Forced 10.00 1.00
PNCHEG_2_PL1X4 PANOCHE ENERGY CENTER (Aggregated) Forced 400.00 2.20
PNCHPP_1_PL1X2 Midway Peaking Aggregate Forced 119.91 9.85
PNOCHE_1_UNITA1 CalPeak Power Panoche Unit 1 Planned 52.01 4.01
RAMON_2_SCEDYN RAMON_2_SCEDYN Forced 471.60 68.60
RECTOR_2_KAWEAH KAWEAH PH 2 & 3 PSP AGGREGATE Forced 6.55 0.00
RECTOR_2_KAWH 1 KAWEAH PH 1 UNIT 1 Planned 2.25 2.25
REDBLF_6_UNIT RED BLUFF PEAKER PLANT Forced 44.00 2.00
REDOND_7_UNIT 5 REDONDO GEN STA. UNIT 5 Forced 178.87 178.87
RICHMN_7_BAYENV BAY ENVIRONMENTAL (NOVE POWER) Planned/Forced 2.50 2.50
RUSCTY_2_UNITS Russell City Energy Center Forced 620.00 22.60
RVRVEW_1_UNITA1 Riverview Energy Center (GP Antioch) Forced 48.70 0.00
SANTFG_7_UNITS GEYSERS CALISTOGA AGGREGATE Planned 92.10 39.10
SANTGO_6_COYOTE GAS RECOVERY SYS. (COYOTE CANYON) Forced 9.99 5.49
SBERDO_2_PSP3 Mountainview Gen Sta. Unit 3 Forced 525.00 8.00
SBERDO_2_PSP4 Mountainview Gen Sta. Unit 4 Forced 525.00 8.00
SBERDO_2_SNTANA SANTA ANA PSP Planned 6.95 3.85
SBERDO_6_MILLCK MILL CREEK PSP Planned 3.93 3.23
SCEHOV_2_HOOVER SCEHOV_2_HOOVER Planned 525.00 133.00
SCHLTE_1_PL1X3 Tracy Combined Cycle Power Plant Forced 332.28 24.30
SIERRA_1_UNITS HIGH SIERRA LIMITED Forced 52.43 2.63
SLST13_2_SOLAR1 Quinto Solar PV Project Planned/Forced 107.60 83.60
SLUISP_2_UNITS SAN LUIS (GIANELLI) PUMP-GEN (AGGREGATE) Planned 374.43 182.43
SMUDGO_7_UNIT 1 SONOMA POWER PLANT Planned 53.00 27.00
SNMALF_6_UNITS Sonoma County Landfill Planned 7.50 4.10
SPRGVL_2_TULESC TULE RIVER HYDRO PLANT (SCE) Forced 2.50 0.00
SUNRIS_2_PL1X3 Sunrise Power Project AGGREGATE II Forced 586.02 28.02
SUNSET_2_UNITS MIDWAY SUNSET COGENERATION PLANT Forced 248.00 32.00
SUTTER_2_PL1X3 SUTTER POWER PLANT AGGREGATE Forced 525.00 30.00
SWIFT_1_NAS YERBA BUENA BATTERY Forced 4.80 4.80
SYCAMR_2_UNIT 1 Sycamore Cogeneration Unit 1 Planned 85.00 8.85
SYCAMR_2_UNIT 2 Sycamore Cogeneration Unit 2 Planned 85.00 8.58
SYCAMR_2_UNIT 3 Sycamore Cogeneration Unit 3 Planned 85.00 7.30
SYCAMR_2_UNIT 4 Sycamore Cogeneration Unit 4 Planned 85.00 7.99
TENGEN_2_PL1X2 Berry Cogen 42 Planned 40.20 3.20
THMENG_1_UNIT 1 THERMAL ENERGY DEV. CORP. Forced 18.50 18.50
UKIAH_7_LAKEMN UKIAH LAKE MENDOCINO HYDRO Planned 3.50 1.00
UNCHEM_1_UNIT CONTRA COSTA CARBON PLANT Forced 19.00 13.00
UNVRSY_1_UNIT 1 Berry Cogen 38 - Unit 1 Forced 38.00 1.50
USWNDR_2_SMUD SOLANO WIND FARM Forced 102.18 0.00
USWNDR_2_SMUD2 Solano Wind Project Phase 3 Forced 127.80 1.80
VACADX_1_UNITA1 CalPeak Power Vaca Dixon Unit 1 Planned 50.61 2.61
VALLEY_7_BADLND VALLEY_7_BADLND Forced 1.30 1.30
VALLEY_7_UNITA1 WM Energy, El Sobrante Landfill Forced 3.74 1.74
VESTAL_2_KERN KERN RIVER PH 3 UNITS 1 & 2 AGGREGATE Forced 36.80 16.30
VINCNT_2_WESTWD Oasis Power Plant Forced 60.00 6.00
VOLTA_6_BAILCK Bailey Creek Ranch Forced 0.63 0.63
WALCRK_2_CTG1 Walnut Creek Energy Park Unit 1 Planned 96.43 0.00
WALCRK_2_CTG2 Walnut Creek Energy Park Unit 2 Planned 96.91 0.00
WALCRK_2_CTG3 Walnut Creek Energy Park Unit 3 Planned 96.65 0.00
WALCRK_2_CTG4 Walnut Creek Energy Park Unit 4 Planned 96.49 0.00
WALCRK_2_CTG5 Walnut Creek Energy Park Unit 5 Planned 96.65 0.00
WDFRDF_2_UNITS WEST FORD FLAT AGGREGATE Planned 32.60 9.60
WHEATL_6_LNDFIL G2 ENERGY, OSTROM ROAD LLC Forced 3.00 3.00
WISHON_6_UNITS Wishon/San Joaquin #1-A AGGREGATE Planned 18.40 18.40
WNDMAS_2_UNIT 1 BUENA VISTA ENERGY, LLC Forced 38.00 0.00


Outage Summary
Zone Name Number Of Outages MW's
Planned Forced Limitation Shutdown
PGAE North 6 13 207.49 60.80
SCE Gen 37 78 1202.47 607.12
SDGE Gen 8 19 284.67 180.00
80 181 4039.16 710.52
Total 131 291 5733.79 1558.44


Report Generated on:
07/19/2015 15:15:04 (PPT)
Filtered Parameters:
Date = 07/19/2015
Resource = ALL
Area = ALL
States = ALL
Outage Origin = CAISO
Configurable Parameters:
Time = 3:15PM PPT

System conditions are dynamic and may change, affecting the accuracy of this report. This report includes all outages, curtailments and temporary operating constraints reflecting normal operations that are effective at the time of the report. Because outages may overlap or may not all be simultaneously in effect at the time of this report, Other real-time reports may indicate a different total outage/curtailment than this report. This report reflects the best available data at the date and time of the report. It is a snapshot of conditions existing at the time the report was posted. This report is initiated once daily 1515 Pacific Time.

The content of these pages is subject to change without notice. Decisions based on information contained within the California ISO web site are the visitor's sole responsibility.