Resource ID |
Resource Name
|
Outage Type
|
Capacity (MW)
|
Curtailed (MW)
|
Zone Name
|
ALTA6B_2_WIND11 |
Alta Wind 11 |
Forced |
90.00 |
0.00 |
SCE Gen |
ALTA6E_2_WIND10 |
Alta Wind 10 |
Forced |
138.00 |
0.00 |
SCE Gen |
ANAHM_7_CT |
ANAHEIM COMBUSTION TURBINE |
Planned |
42.81 |
0.00 |
SCE Gen |
ARBWD_6_QF |
Wind Resource II |
Forced |
19.95 |
0.65 |
SCE Gen |
BIGCRK_2_EXESWD |
BIG CREEK HYDRO PROJECT PSP |
Planned |
820.00 |
708.00 |
SCE Gen |
BISHOP_1_ALAMO |
BISHOP CREEK PLANT 2 AND 6 |
Planned/Forced |
13.40 |
13.40 |
SCE Gen |
BISHOP_1_UNITS |
BISHOP CREEK PLANT 3 AND 4 |
Forced |
15.80 |
15.80 |
SCE Gen |
BLKCRK_2_SOLAR1 |
McCoy Station |
Planned |
250.00 |
145.00 |
SCE Gen |
BORDER_6_UNITA1 |
CalPeak Power Border Unit 1 |
Planned |
51.25 |
3.25 |
SDGE Gen |
BUCKWD_1_QF |
Buckwind Re-powering project |
Forced |
16.50 |
0.00 |
SCE Gen |
BUTTVL_7_UNIT 1 |
BUTT VALLEY HYDRO |
Forced |
40.00 |
4.00 |
PGAE North |
CARBOU_7_PL4X5 |
CARIBOU PH 2 UNIT 4 & 5 AGGREGATE |
Planned/Forced |
122.00 |
122.00 |
PGAE North |
CCRITA_7_RPPCHF |
Rancho Penasquitos Hydro Facility |
Planned |
5.25 |
5.25 |
SDGE Gen |
CENTER_2_QF |
CENTER QFS |
Forced |
31.00 |
31.00 |
SCE Gen |
CHINO_6_SMPPAP |
SIMPSON PAPER |
Planned |
44.00 |
44.00 |
SCE Gen |
CHINO_7_MILIKN |
MN Milliken Genco LLC |
Planned |
1.90 |
1.90 |
SCE Gen |
COLEMN_2_UNIT |
Coleman |
Forced |
13.00 |
5.00 |
PGAE North |
COLGAT_7_UNIT 1 |
COLGATE HYDRO UNIT 1 |
Planned |
176.72 |
176.72 |
PGAE North |
COLGAT_7_UNIT 2 |
COLGATE HYDRO UNIT 2 |
Forced |
175.67 |
41.67 |
PGAE North |
CONTRL_1_CASAD1 |
Mammoth G1 |
Forced |
10.00 |
10.00 |
SCE Gen |
CRSTWD_6_KUMYAY |
Kumeyaay Wind Farm |
Forced |
50.00 |
0.00 |
SDGE Gen |
DVLCYN_1_UNITS |
DEVIL CANYON HYDRO UNITS 1-4 AGGREGATE |
Planned |
236.80 |
0.00 |
SCE Gen |
EASTWD_7_UNIT |
EASTWOOD PUMP-GEN |
Planned |
200.00 |
200.00 |
SCE Gen |
ELDORO_7_UNIT 1 |
El Dorado Unit 1 |
Planned |
11.00 |
11.00 |
PGAE North |
ELECTR_7_PL1X3 |
ELECTRA PH UNIT 1 & 2 AGGREGATE |
Planned |
101.50 |
38.10 |
PGAE North |
ENERSJ_2_WIND |
ESJ Wind Energy |
Forced |
155.10 |
0.00 |
SDGE Gen |
ENWIND_2_WIND2 |
Ridgetop I |
Planned |
65.00 |
51.80 |
SCE Gen |
ESCNDO_6_UNITB1 |
CalPeak Power Enterprise Unit 1 |
Planned |
48.04 |
0.04 |
SDGE Gen |
ETIWND_2_FONTNA |
FONTANALYTLE CREEK POWERHOUSE P |
Planned |
2.56 |
2.06 |
SCE Gen |
ETIWND_6_MWDETI |
ETIWANDA RECOVERY HYDRO |
Planned |
24.00 |
24.00 |
SCE Gen |
ETIWND_7_MIDVLY |
MN Mid Valley Genco LLC |
Planned |
2.10 |
1.00 |
SCE Gen |
ETIWND_7_UNIT 4 |
ETIWANDA GEN STA. UNIT 4 |
Forced |
320.00 |
70.00 |
SCE Gen |
FAIRHV_6_UNIT |
FAIRHAVEN POWER CO. |
Forced |
19.90 |
19.90 |
PGAE North |
GALE_1_SEGS1 |
SUNRAY ENERGY, INC. - SEGS 1 |
Planned |
14.20 |
14.20 |
SCE Gen |
GARNET_1_UNITS |
GARNET GREEN POWER PROJECT AGGREGATE |
Forced |
16.50 |
13.50 |
SCE Gen |
GARNET_1_WINDS |
Garnet Winds Aggregation |
Forced |
22.50 |
0.00 |
SCE Gen |
GARNET_2_WIND2 |
Karen Avenue Wind Farm |
Planned |
11.70 |
0.00 |
SCE Gen |
GLNARM_7_UNIT 1 |
GLEN ARM UNIT 1 |
Planned |
22.07 |
22.07 |
SCE Gen |
GLNARM_7_UNIT 2 |
GLEN ARM UNIT 2 |
Forced |
22.30 |
22.30 |
SCE Gen |
GRIZLY_1_UNIT 1 |
GRIZZLY HYDRO |
Forced |
20.00 |
20.00 |
PGAE North |
HAASPH_7_PL1X2 |
HAAS PH UNIT 1 & 2 AGGREGATE |
Forced |
144.00 |
0.00 |
PGAE North |
HIDSRT_2_UNITS |
HIGH DESERT POWER PROJECT AGGREGATE |
Forced |
830.00 |
830.00 |
SCE Gen |
HUMBPP_1_UNITS3 |
Humboldt Bay Generating Station 3 |
Planned |
65.08 |
16.27 |
PGAE North |
IVWEST_2_SOLAR1 |
Imperial Valley West ( Q # 608) |
Planned/Forced |
150.00 |
1.00 |
SDGE Gen |
JAWBNE_2_NSRWND |
North Sky River Wind Project |
Forced |
160.00 |
4.80 |
SCE Gen |
KERKH2_7_UNIT 1 |
KERKHOFF PH 2 UNIT #1 |
Planned |
153.90 |
153.90 |
PGAE North |
KERRGN_1_UNIT 1 |
KERN RIVER HYDRO UNITS 1-4 AGGREGATE |
Planned/Forced |
25.60 |
0.00 |
SCE Gen |
LARKSP_6_UNIT 1 |
LARKSPUR PEAKER UNIT 1 |
Forced |
46.10 |
0.10 |
SDGE Gen |
LARKSP_6_UNIT 2 |
LARKSPUR PEAKER UNIT 2 |
Forced |
47.98 |
2.98 |
SDGE Gen |
LAROA1_2_UNITA1 |
LR1 |
Forced |
180.00 |
15.00 |
SDGE Gen |
LAROA2_2_UNITA1 |
LR2 |
Forced |
322.00 |
12.00 |
SDGE Gen |
MANZNA_2_WIND |
Manzana Wind |
Forced |
189.00 |
4.50 |
SCE Gen |
MIRLOM_2_CORONA |
MWD Corona Hydroelectric Recovery Plant |
Forced |
2.85 |
2.85 |
SCE Gen |
MIRLOM_6_PEAKER |
Mira Loma Peaker |
Forced |
46.00 |
0.00 |
SCE Gen |
MNDALY_7_UNIT 1 |
MANDALAY GEN STA. UNIT 1 |
Planned |
215.00 |
215.00 |
SCE Gen |
MNDALY_7_UNIT 2 |
MANDALAY GEN STA. UNIT 2 |
Planned |
215.29 |
215.29 |
SCE Gen |
MONLTH_6_BOREL |
BOREL HYDRO UNITS 1-3 AGGREGATE |
Planned/Forced |
11.00 |
11.00 |
SCE Gen |
MRGT_6_MMAREF |
Miramar Energy Facility |
Planned |
48.00 |
48.00 |
SDGE Gen |
MSOLAR_2_SOLAR1 |
Mesquite Solar 1 |
Forced |
165.00 |
0.00 |
SCE Gen |
MTWIND_1_UNIT 3 |
Mountain View Power Project III |
Forced |
22.44 |
0.66 |
SCE Gen |
NAROW2_2_UNIT |
NARROWS PH 2 UNIT |
Forced |
55.00 |
55.00 |
PGAE North |
OTMESA_2_PL1X3 |
OTAY MESA ENERGY CENTER |
Forced |
603.68 |
28.68 |
SDGE Gen |
PACLUM_6_UNIT |
PACIFIC LUMBER (HUMBOLDT) |
Forced |
28.80 |
28.80 |
PGAE North |
PADUA_2_ONTARO |
ONTARIO/SIERRA HYDRO PSP |
Planned/Forced |
1.92 |
1.22 |
SCE Gen |
PANDOL_6_UNIT |
Covanta Delano, Inc. |
Forced |
49.00 |
4.00 |
SCE Gen |
PANSEA_1_PANARO |
Mesa Wind Project |
Forced |
30.00 |
21.61 |
SCE Gen |
PIT4_7_PL1X2 |
PIT PH 4 UNITS 1 & 2 AGGREGATE |
Planned |
95.00 |
95.00 |
PGAE North |
PIT5_7_PL3X4 |
PIT PH 5 UNITS 3 & 4 AGGREGATE |
Planned |
82.00 |
82.00 |
PGAE North |
PIT7_7_UNIT 1 |
PIT PH 7 UNIT 1 |
Forced |
55.70 |
0.00 |
PGAE North |
PIT7_7_UNIT 2 |
PIT PH 7 UNIT 2 |
Forced |
54.60 |
0.00 |
PGAE North |
POEPH_7_UNIT 1 |
POE HYDRO UNIT 1 |
Planned |
69.00 |
69.00 |
PGAE North |
POEPH_7_UNIT 2 |
POE HYDRO UNIT 2 |
Planned |
68.50 |
68.50 |
PGAE North |
POTTER_6_UNITS |
Potter Valley |
Planned |
10.10 |
10.10 |
PGAE North |
PWEST_1_UNIT |
PACIFIC WEST 1 WIND GENERATION |
Forced |
2.10 |
2.10 |
SCE Gen |
RECTOR_2_KAWEAH |
KAWEAH PH 2 & 3 PSP AGGREGATE |
Planned |
6.55 |
2.00 |
SCE Gen |
RECTOR_2_QF |
RECTOR QFS |
Forced |
19.50 |
0.00 |
SCE Gen |
RENWD_1_QF |
Renwind re-powering project |
Forced |
10.00 |
0.00 |
SCE Gen |
ROSMDW_2_WIND1 |
Pacific Wind - Phase 1 |
Forced |
140.00 |
10.00 |
SDGE Gen |
RVSIDE_6_SPRING |
SPRINGS GENERATION PROJECT AGGREGATE |
Planned |
36.00 |
36.00 |
SCE Gen |
SAMPSN_6_KELCO1 |
KELCO QUALIFYING FACILITY |
Planned |
25.00 |
7.40 |
SDGE Gen |
SANDLT_2_SUNITS |
Mojave Solar |
Forced |
275.00 |
275.00 |
SCE Gen |
SANTGO_6_COYOTE |
GAS RECOVERY SYS. (COYOTE CANYON) |
Forced |
9.99 |
7.24 |
SCE Gen |
SANWD_1_QF |
San Gorgonio Farms Wind Farm |
Planned |
31.00 |
2.38 |
SCE Gen |
SAUGUS_7_LOPEZ |
MM Lopez Energy |
Planned |
6.10 |
0.90 |
SCE Gen |
SBERDO_2_SNTANA |
SANTA ANA PSP |
Planned |
6.95 |
5.95 |
SCE Gen |
SBERDO_6_MILLCK |
MILL CREEK PSP |
Planned |
3.93 |
2.93 |
SCE Gen |
SLYCRK_1_UNIT 1 |
SLY CREEK HYDRO |
Forced |
13.00 |
5.00 |
PGAE North |
SNCLRA_6_WILLMT |
WILLIAMETTE |
Forced |
27.81 |
0.00 |
SCE Gen |
TIFFNY_1_DILLON |
TIFFNY_1_DILLON |
Forced |
45.00 |
2.00 |
SCE Gen |
VALLEY_7_BADLND |
VALLEY_7_BADLND |
Forced |
1.30 |
1.30 |
SCE Gen |
VALLEY_7_UNITA1 |
WM Energy, El Sobrante Landfill |
Forced |
3.74 |
1.94 |
SCE Gen |
VESTAL_2_KERN |
KERN RIVER PH 3 UNITS 1 & 2 AGGREGATE |
Forced |
36.80 |
16.30 |
SCE Gen |
VINCNT_2_WESTWD |
Oasis Power Plant |
Planned |
60.00 |
3.00 |
SCE Gen |
WALCRK_2_CTG1 |
Walnut Creek Energy Park Unit 1 |
Planned |
96.43 |
0.00 |
SCE Gen |
WALCRK_2_CTG2 |
Walnut Creek Energy Park Unit 2 |
Planned |
96.91 |
0.00 |
SCE Gen |
WALCRK_2_CTG3 |
Walnut Creek Energy Park Unit 3 |
Planned |
96.65 |
0.00 |
SCE Gen |
WALCRK_2_CTG4 |
Walnut Creek Energy Park Unit 4 |
Planned |
96.49 |
0.00 |
SCE Gen |
WALCRK_2_CTG5 |
Walnut Creek Energy Park Unit 5 |
Planned |
96.65 |
0.00 |
SCE Gen |
WALNUT_2_SOLAR |
Industry MetroLink PV 1 |
Forced |
1.50 |
0.00 |
SCE Gen |
WALNUT_7_WCOVCT |
WALNUT_7_WCOVCT |
Forced |
4.50 |
4.50 |
SCE Gen |
WHTWTR_1_WINDA1 |
Whitewater Hill Wind Project |
Forced |
61.50 |
16.50 |
SCE Gen |
WNDSTR_2_WIND |
Windstar |
Forced |
120.00 |
0.00 |
SCE Gen |
ADERA_1_SOLAR1 |
Adera Solar |
Planned |
20.00 |
7.00 |
|
ADLIN_1_UNITS |
GEYSERS AIDLIN AGGREGATE |
Planned |
22.00 |
6.00 |
|
ANZA_6_SOLAR1 |
Seville Solar One |
Planned |
20.00 |
2.67 |
|
BALCHS_7_UNIT 3 |
BALCH 2 PH UNIT 3 |
Planned |
54.60 |
54.60 |
|
BELDEN_7_UNIT 1 |
BELDEN HYDRO |
Planned/Forced |
119.00 |
119.00 |
|
BLCKBT_2_STONEY |
BLACK BUTTE HYDRO |
Forced |
6.20 |
6.20 |
|
BNNIEN_7_ALTAPH |
ALTA POWER HOUSE |
Planned |
1.00 |
0.00 |
|
BRDSLD_2_HIWIND |
High Winds Energy Center |
Forced |
162.00 |
9.00 |
|
BRDSLD_2_SHILO1 |
Shiloh I Wind Project |
Forced |
150.00 |
3.00 |
|
BRDSLD_2_SHILO2 |
SHILOH WIND PROJECT 2 |
Planned |
150.00 |
4.00 |
|
BRDSLD_2_SHLO3A |
Shiloh III Wind Project, LLC |
Forced |
102.50 |
2.50 |
|
BRDSLD_2_SHLO3B |
Shiloh IV Wind Project |
Forced |
100.00 |
0.00 |
|
BUCKCK_7_PL1X2 |
BUCKS CREEK AGGREGATE |
Planned/Forced |
59.00 |
34.00 |
|
CAPWD_1_QF |
Edom Hills Wind Farm |
Forced |
19.55 |
4.55 |
|
CHWCHL_1_BIOMAS |
Chow II Biomass to Energy |
Planned |
10.80 |
1.30 |
|
CNTRVL_6_UNIT |
Centerville |
Forced |
6.40 |
6.40 |
|
COTTLE_2_FRNKNH |
Frankenheimer Power Plant |
Forced |
5.30 |
0.00 |
|
CSTRVL_7_PL1X2 |
Marina Land Fill Gas |
Planned/Forced |
4.53 |
3.73 |
|
CUMBIA_1_SOLAR |
Columbia Solar Energy II |
Forced |
19.00 |
19.00 |
|
DALYCT_1_FCELL |
PGE San Francisco State Fuel Cell |
Planned/Forced |
1.60 |
1.60 |
|
DELTA_2_PL1X4 |
DELTA ENERGY CENTER AGGREGATE |
Forced |
880.00 |
30.00 |
|
DINUBA_6_UNIT |
DINUBA GENERATION PROJECT |
Forced |
12.00 |
12.00 |
|
DONNLS_7_UNIT |
Donnells Hydro |
Planned |
72.00 |
72.00 |
|
DSRTSL_2_SOLAR1 |
Desert Stateline |
Planned/Forced |
299.99 |
189.99 |
|
DUANE_1_PL1X3 |
DONALD VON RAESFELD POWER PROJECT |
Forced |
147.80 |
73.90 |
|
ELKCRK_6_STONYG |
STONEY GORGE HYDRO AGGREGATE |
Forced |
4.90 |
4.90 |
|
ELNIDP_6_BIOMAS |
El Nido Biomass to Energy |
Planned |
10.50 |
0.50 |
|
ETIWND_2_RTS026 |
SPVP026 |
Planned |
6.00 |
0.00 |
|
EXCHEC_7_UNIT 1 |
EXCHEQUER HYDRO |
Planned |
94.50 |
94.50 |
|
FLOWD2_2_FPLWND |
DIABLO WINDS |
Forced |
18.60 |
0.00 |
|
GEYS11_7_UNIT11 |
GEYSERS UNIT 11 (HEALDSBURG) |
Forced |
74.40 |
7.40 |
|
GEYS12_7_UNIT12 |
GEYSERS UNIT 12 (HEALDSBURG) |
Forced |
57.00 |
3.00 |
|
GEYS13_7_UNIT13 |
GEYSERS UNIT 13 (HEALDSBURG) |
Planned |
95.00 |
10.00 |
|
GEYS14_7_UNIT14 |
GEYSERS UNIT 14 (HEALDSBURG) |
Forced |
70.00 |
10.00 |
|
GEYS16_7_UNIT16 |
GEYSERS UNIT 16 (HEALDSBURG) |
Forced |
85.00 |
85.00 |
|
GEYS17_7_UNIT17 |
GEYSERS UNIT 17 (HEALDSBURG) |
Planned |
60.00 |
0.00 |
|
GEYS18_7_UNIT18 |
GEYSERS UNIT 18 (HEALDSBURG) |
Forced |
72.00 |
72.00 |
|
GEYS20_7_UNIT20 |
GEYSERS UNIT 20 (HEALDSBURG) |
Forced |
62.00 |
62.00 |
|
GRIFFI_2_LSPDYN |
Griffith Energy |
Forced |
570.00 |
370.00 |
|
GYS5X6_7_UNITS |
GEYSERS UNITS 5 & 6 AGGREGATE |
Forced |
85.00 |
0.00 |
|
GYS7X8_7_UNITS |
GEYSERS UNITS 7 & 8 AGGREGATE |
Forced |
82.00 |
4.00 |
|
GYSRVL_7_WSPRNG |
Sonoma CWA Warm Springs Hydro |
Forced |
3.75 |
2.42 |
|
HATRDG_2_WIND |
Hatchet Ridge Wind Farm |
Forced |
102.00 |
0.80 |
|
HELMPG_7_UNIT 1 |
HELMS PUMP-GEN UNIT 1 |
Planned |
407.00 |
407.00 |
|
HMLTBR_6_UNITS |
HAMILTON BRANCH PH (AGGREGATE) |
Planned/Forced |
4.90 |
4.90 |
|
HYTTHM_2_UNITS |
HYATT-THERMALITO PUMP-GEN (AGGREGATE) |
Planned/Forced |
933.10 |
677.10 |
|
INTKEP_2_UNITS |
CCSF Hetch_Hetchy Hydro Aggregate |
Forced |
405.00 |
33.00 |
|
INTMNT_3_RIVERSIDE |
IPPDYN |
Forced |
137.00 |
1.00 |
|
KRNCNY_6_UNIT |
KERN CANYON |
Planned |
11.50 |
1.00 |
|
LAMONT_1_SOLAR3 |
Woodmere Solar Farm |
Planned/Forced |
14.99 |
0.00 |
|
LAMONT_1_SOLAR4 |
Hayworth Solar Farm |
Planned |
26.66 |
0.00 |
|
LAPAC_6_UNIT |
LOUISIANA PACIFIC SAMOA |
Forced |
20.00 |
20.00 |
|
LASSEN_6_AGV1 |
AGV 1 |
Planned |
1.80 |
1.80 |
|
LIVOAK_1_UNIT 1 |
LIVE OAK LIMITED |
Forced |
47.49 |
47.49 |
|
MALAGA_1_PL1X2 |
Malaga Power Aggregate |
Planned |
96.00 |
3.99 |
|
MCSWAN_6_UNITS |
MC SWAIN HYDRO |
Planned |
10.00 |
10.00 |
|
MERCFL_6_UNIT |
MERCED FALLS |
Forced |
3.50 |
3.50 |
|
METEC_2_PL1X3 |
Metcalf Energy Center |
Forced |
593.16 |
308.16 |
|
MNDOTA_1_SOLAR2 |
Citizen Solar B |
Forced |
5.00 |
1.50 |
|
MOSSLD_7_UNIT 7 |
MOSS LANDING UNIT 7 |
Forced |
755.00 |
15.00 |
|
MTNPOS_1_UNIT |
MT.POSO COGENERATION CO. |
Forced |
46.64 |
4.64 |
|
NCPA_7_GP2UN3 |
NCPA GEO PLANT 2 UNIT 3 |
Planned |
42.42 |
42.42 |
|
OAK C_7_UNIT 1 |
OAKLAND STATION C GT UNIT 1 |
Forced |
55.00 |
0.00 |
|
OAK C_7_UNIT 3 |
OAKLAND STATION C GT UNIT 3 |
Forced |
55.00 |
0.00 |
|
OILFLD_7_QFUNTS |
Nacimiento Hydroelectric Plant |
Forced |
3.80 |
3.80 |
|
PARDEB_6_UNITS |
Pardee Power House |
Planned/Forced |
30.00 |
10.00 |
|
PINFLT_7_UNITS |
PINE FLAT HYDRO AGGREGATE |
Forced |
210.00 |
210.00 |
|
PITTSP_7_UNIT 6 |
PITTSBURG UNIT 6 |
Forced |
317.00 |
151.00 |
|
PITTSP_7_UNIT 7 |
PITTSBURG UNIT 7 |
Planned |
530.00 |
530.00 |
|
PLACVL_1_CHILIB |
Chili Bar Hydro |
Planned |
8.40 |
8.40 |
|
PNOCHE_1_UNITA1 |
CalPeak Power Panoche Unit 1 |
Planned |
52.01 |
4.01 |
|
PRIMM_2_SOLAR1 |
Silver State South |
Planned |
250.00 |
215.00 |
|
RICHMN_7_BAYENV |
BAY ENVIRONMENTAL (NOVE POWER) |
Forced |
2.50 |
0.60 |
|
RUSCTY_2_UNITS |
Russell City Energy Center |
Forced |
620.00 |
0.00 |
|
SANTFG_7_UNITS |
GEYSERS CALISTOGA AGGREGATE |
Forced |
92.10 |
35.10 |
|
SCEHOV_2_HOOVER |
SCEHOV_2_HOOVER |
Planned |
525.00 |
239.00 |
|
SKERN_6_SOLAR1 |
South Kern Solar PV Plant |
Forced |
20.00 |
6.00 |
|
SLUISP_2_UNITS |
SAN LUIS (GIANELLI) PUMP-GEN (AGGREGATE) |
Planned/Forced |
374.43 |
214.43 |
|
SMUDGO_7_UNIT 1 |
SONOMA POWER PLANT |
Forced |
53.00 |
23.00 |
|
SNMALF_6_UNITS |
Sonoma County Landfill |
Planned |
7.50 |
4.10 |
|
STOILS_1_UNITS |
Chevron Richmond Refinery |
Forced |
113.90 |
0.00 |
|
SWIFT_1_NAS |
YERBA BUENA BATTERY |
Forced |
4.80 |
4.80 |
|
THMENG_1_UNIT 1 |
Tracy Biomass |
Forced |
18.50 |
18.50 |
|
TUPMAN_1_BIOGAS |
ABEC Bidart-Stockale #1 |
Forced |
0.60 |
0.60 |
|
TXMCKT_6_UNIT |
McKittrick Cogen |
Forced |
11.20 |
2.10 |
|
USWND1_2_UNITS |
US WIND POWER#1(WALKER) |
Forced |
38.90 |
38.90 |
|
USWND2_1_UNITS |
US WIND POWER#2(PATTERSON) |
Forced |
138.50 |
138.50 |
|
USWND2_1_WIND1 |
Golden Hills A |
Planned/Forced |
42.96 |
0.00 |
|
USWND2_1_WIND2 |
Golden Hills B |
Planned/Forced |
42.96 |
0.00 |
|
USWNDR_2_SMUD |
SOLANO WIND FARM |
Forced |
102.18 |
0.00 |
|
USWNDR_2_SMUD2 |
Solano Wind Project Phase 3 |
Forced |
127.80 |
0.00 |
|
VACADX_1_UNITA1 |
CalPeak Power Vaca Dixon Unit 1 |
Planned |
50.61 |
2.61 |
|
VLYHOM_7_SSJID |
Woodward Power Plant |
Forced |
3.00 |
0.00 |
|
WDFRDF_2_UNITS |
WEST FORD FLAT AGGREGATE |
Forced |
32.60 |
32.60 |
|
WHEATL_6_LNDFIL |
G2 ENERGY, OSTROM ROAD LLC |
Forced |
3.00 |
1.50 |
|
WISE_1_UNIT 1 |
Wise Hydro Unit 1 |
Planned |
14.50 |
14.50 |
|
WNDMAS_2_UNIT 1 |
BUENA VISTA ENERGY, LLC |
Forced |
38.00 |
0.00 |
|
ZOND_6_UNIT |
ZOND WINDSYSTEMS INC. |
Forced |
17.10 |
17.10 |
|
Report Generated on:12/15/2015 09:22:34 (PPT)
Filtered Parameters:
Date = 12/13/2015
Resource = ALL
Area = ALL
States = ALL
Outage Origin = CAISO
Configurable Parameters:
Time = 9:22AM PPT
System conditions are dynamic and may change, affecting the accuracy of this report.
This report includes all outages, curtailments and temporary operating constraints
reflecting normal operations that are effective at the time of the report.
Because outages may overlap or may not all be simultaneously in effect at the time of this report,
Other real-time reports may indicate a different total outage/curtailment than this report.
This report reflects the best available data at the date and time of the report.
It is a snapshot of conditions existing at the time the report was posted. This report is
initiated once daily 1515 Pacific Time.
The content of these pages is subject to change without notice. Decisions based on information contained within the California ISO web site are the visitor's sole responsibility.