Resource ID Resource Name Outage Type Capacity (MW) Curtailed (MW) Zone Name
ALAMO_6_UNIT ALAMO POWER PLANT Forced 17.00 0.00 SCE Gen
ALTA3A_2_CPCE8 CPC East - Alta Wind 8 Planned 150.00 0.00 SCE Gen
ALTA4B_2_CPCW6 CPC West - Alta Wind 6 Planned 150.00 0.00 SCE Gen
ALTA6B_2_WIND11 Alta Wind 11 Forced 90.00 0.00 SCE Gen
ALTA6E_2_WIND10 Alta Wind 10 Forced 138.00 0.00 SCE Gen
ANAHM_7_CT ANAHEIM COMBUSTION TURBINE Planned 42.81 42.81 SCE Gen
ANZA_6_SOLAR1 Seville Solar One Planned 20.00 0.00 SDGE Gen
ARBWD_6_QF Wind Resource II Forced 19.95 0.78 SCE Gen
BIGCRK_2_EXESWD BIG CREEK HYDRO PROJECT PSP Planned/Forced 820.00 672.00 SCE Gen
BISHOP_1_ALAMO BISHOP CREEK PLANT 2 AND 6 Forced 13.40 6.90 SCE Gen
BISHOP_1_UNITS BISHOP CREEK PLANT 3 AND 4 Forced 15.80 13.00 SCE Gen
BLAST_1_WIND Mountain View IV Wind Planned 49.00 0.00 SCE Gen
BLKCRK_2_SOLAR1 McCoy Station Planned 250.00 97.00 SCE Gen
BORDER_6_UNITA1 CalPeak Power Border Unit 1 Planned 51.25 0.00 SDGE Gen
BUCKWD_1_QF Buckwind Re-powering project Forced 16.50 0.00 SCE Gen
BUTTVL_7_UNIT 1 BUTT VALLEY HYDRO Forced 40.00 4.00 PGAE North
CARBOU_7_PL2X3 CARIBOU PH 1 UNIT 2 & 3 AGGREGATE Planned 49.00 25.00 PGAE North
CARBOU_7_PL4X5 CARIBOU PH 2 UNIT 4 & 5 AGGREGATE Forced 122.00 8.00 PGAE North
CCRITA_7_RPPCHF Rancho Penasquitos Hydro Facility Planned 5.25 5.25 SDGE Gen
CENTER_2_QF CENTER QFS Forced 31.00 31.00 SCE Gen
CHINO_7_MILIKN MN Milliken Genco LLC Planned 1.90 1.90 SCE Gen
COLGAT_7_UNIT 1 COLGATE HYDRO UNIT 1 Planned 176.72 176.72 PGAE North
COLGAT_7_UNIT 2 COLGATE HYDRO UNIT 2 Forced 175.67 41.67 PGAE North
COLUSA_2_PL1X3 Colusa Generating Station Forced 641.00 15.90 PGAE North
CRSTWD_6_KUMYAY Kumeyaay Wind Farm Forced 50.00 0.00 SDGE Gen
DRUM_7_PL1X2 Drum PH 1 Units 1 & 2 Aggregate Planned 26.00 13.00 PGAE North
DSRTSL_2_SOLAR1 Desert Stateline Planned 299.99 193.99 SCE Gen
DSRTSN_2_SOLAR2 Desert Sunlight 250 Planned 250.00 50.20 SCE Gen
DVLCYN_1_UNITS DEVIL CANYON HYDRO UNITS 1-4 AGGREGATE Planned 236.80 0.00 SCE Gen
EASTWD_7_UNIT EASTWOOD PUMP-GEN Forced 200.00 0.00 SCE Gen
ELDORO_7_UNIT 1 El Dorado Unit 1 Planned 11.00 11.00 PGAE North
ELECTR_7_PL1X3 ELECTRA PH UNIT 1 & 2 AGGREGATE Planned 101.50 0.00 PGAE North
ELSEGN_2_UN1011 El Segundo Energy Center 5/6 Forced 263.00 0.00 SCE Gen
ELSEGN_2_UN2021 El Segundo Energy Center 7/8 Forced 263.68 0.00 SCE Gen
ENCINA_7_EA4 ENCINA UNIT 4 Planned 300.00 300.00 SDGE Gen
ENWIND_2_WIND2 Ridgetop I Planned 65.00 36.80 SCE Gen
ESCNDO_6_UNITB1 CalPeak Power Enterprise Unit 1 Planned 48.04 0.00 SDGE Gen
ETIWND_2_FONTNA FONTANALYTLE CREEK POWERHOUSE P Planned 2.56 2.06 SCE Gen
ETIWND_6_MWDETI ETIWANDA RECOVERY HYDRO Planned 24.00 24.00 SCE Gen
ETIWND_7_MIDVLY MN Mid Valley Genco LLC Planned 2.10 0.60 SCE Gen
ETIWND_7_UNIT 4 ETIWANDA GEN STA. UNIT 4 Forced 320.00 70.00 SCE Gen
FAIRHV_6_UNIT FAIRHAVEN POWER CO. Planned 19.90 19.90 PGAE North
GARNET_1_UNITS GARNET GREEN POWER PROJECT AGGREGATE Forced 16.50 1.50 SCE Gen
GARNET_1_WINDS Garnet Winds Aggregation Forced 22.50 0.00 SCE Gen
GARNET_2_WIND2 Karen Avenue Wind Farm Planned/Forced 11.70 0.00 SCE Gen
GLNARM_7_UNIT 1 GLEN ARM UNIT 1 Planned 22.07 0.00 SCE Gen
GLNARM_7_UNIT 2 GLEN ARM UNIT 2 Forced 22.30 22.30 SCE Gen
GLNARM_7_UNIT 3 GLEN ARM UNIT 3 Planned 44.83 0.00 SCE Gen
GLNARM_7_UNIT 4 GLEN ARM UNIT 4 Planned 42.42 0.00 SCE Gen
GRNLF1_1_UNITS GREENLEAF #1 COGEN AGGREGATE Forced 49.50 0.30 PGAE North
HAASPH_7_PL1X2 HAAS PH UNIT 1 & 2 AGGREGATE Forced 144.00 0.00 PGAE North
HIDSRT_2_UNITS HIGH DESERT POWER PROJECT AGGREGATE Forced 830.00 74.00 SCE Gen
HUMBPP_6_UNITS Humboldt Bay Generating Station 1 Planned 97.62 0.00 PGAE North
IVWEST_2_SOLAR1 Imperial Valley West ( Q # 608) Planned/Forced 150.00 1.00 SDGE Gen
JAWBNE_2_NSRWND North Sky River Wind Project Forced 160.00 12.80 SCE Gen
KERKH2_7_UNIT 1 KERKHOFF PH 2 UNIT #1 Planned 153.90 153.90 PGAE North
KERRGN_1_UNIT 1 KERN RIVER HYDRO UNITS 1-4 AGGREGATE Forced 25.60 6.40 SCE Gen
KRAMER_1_SEGS37 LUZ SOLAR PARTNERS 3-7 AGGREGATE Forced 175.00 0.00 SCE Gen
KRAMER_2_SEGS89 LUZ SOLAR PARTNERS 8-9 AGGREGATE Forced 184.00 0.00 SCE Gen
LARKSP_6_UNIT 1 LARKSPUR PEAKER UNIT 1 Forced 46.10 0.10 SDGE Gen
LARKSP_6_UNIT 2 LARKSPUR PEAKER UNIT 2 Forced 47.98 2.98 SDGE Gen
LAROA1_2_UNITA1 LR1 Forced 180.00 15.00 SDGE Gen
LAROA2_2_UNITA1 LR2 Forced 322.00 7.00 SDGE Gen
MANZNA_2_WIND Manzana Wind Forced 189.00 1.50 SCE Gen
MOJAVE_1_SIPHON MOJAVE SIPHON POWER PLANT Planned 12.58 0.00 SCE Gen
MONLTH_6_BOREL BOREL HYDRO UNITS 1-3 AGGREGATE Planned/Forced 11.00 11.00 SCE Gen
MOORPK_7_UNITA1 WEME- Simi Valley Landfill Planned 2.49 0.49 SCE Gen
MRCHNT_2_PL1X3 Desert Star Energy Center Forced 494.58 6.58 SCE Gen
MRGT_6_MMAREF Miramar Energy Facility Planned 48.00 48.00 SDGE Gen
MTWIND_1_UNIT 1 Mountain View Power Project I Planned/Forced 44.40 0.00 SCE Gen
MTWIND_1_UNIT 2 Mountain View Power Project II Planned/Forced 22.20 0.00 SCE Gen
MTWIND_1_UNIT 3 Mountain View Power Project III Forced 22.44 0.66 SCE Gen
NAROW2_2_UNIT NARROWS PH 2 UNIT Forced 55.00 55.00 PGAE North
NZWIND_6_WDSTR Windstream 39 Planned 6.20 0.00 SCE Gen
NZWIND_6_WDSTR2 Windstream 6040 Planned 6.90 0.00 SCE Gen
NZWIND_6_WDSTR3 Windstream 6041 Planned 6.00 0.00 SCE Gen
OGROVE_6_PL1X2 Orange Grove Energy Center Planned 96.00 0.00 SDGE Gen
OMAR_2_UNIT 1 KERN RIVER COGENERATION CO. UNIT 1 Forced 78.00 1.10 SCE Gen
OMAR_2_UNIT 2 KERN RIVER COGENERATION CO. UNIT 2 Forced 78.11 0.11 SCE Gen
OMAR_2_UNIT 3 KERN RIVER COGENERATION CO. UNIT 3 Forced 81.41 1.41 SCE Gen
OTMESA_2_PL1X3 OTAY MESA ENERGY CENTER Forced 603.68 3.68 SDGE Gen
PACLUM_6_UNIT PACIFIC LUMBER (HUMBOLDT) Forced 28.80 15.80 PGAE North
PADUA_2_ONTARO ONTARIO/SIERRA HYDRO PSP Planned 1.92 1.22 SCE Gen
PANDOL_6_UNIT Covanta Delano, Inc. Planned 49.00 49.00 SCE Gen
PANSEA_1_PANARO Mesa Wind Project Planned 30.00 21.61 SCE Gen
PIT3_7_PL1X3 PIT PH 3 UNITS 1, 2 & 3 AGGREGATE Planned 70.60 25.00 PGAE North
PIT4_7_PL1X2 PIT PH 4 UNITS 1 & 2 AGGREGATE Planned 95.00 0.00 PGAE North
PIT5_7_PL3X4 PIT PH 5 UNITS 3 & 4 AGGREGATE Planned 82.00 82.00 PGAE North
PIT6_7_UNIT 1 PIT PH 6 UNIT 1 Forced 39.00 7.00 PGAE North
PIT6_7_UNIT 2 PIT PH 6 UNIT 2 Planned 40.00 40.00 PGAE North
PIT7_7_UNIT 1 PIT PH 7 UNIT 1 Forced 55.70 5.00 PGAE North
PIT7_7_UNIT 2 PIT PH 7 UNIT 2 Forced 54.60 5.00 PGAE North
POEPH_7_UNIT 1 POE HYDRO UNIT 1 Planned 69.00 69.00 PGAE North
POEPH_7_UNIT 2 POE HYDRO UNIT 2 Planned 68.50 68.50 PGAE North
POTTER_6_UNITS Potter Valley Planned 10.10 10.10 PGAE North
PTLOMA_6_NTCCGN AEI MCRD STEAM TURBINE Planned 2.58 0.00 SDGE Gen
PWEST_1_UNIT PACIFIC WEST 1 WIND GENERATION Forced 2.10 2.10 SCE Gen
RAMON_2_SCEDYN RAMON_2_SCEDYN Planned 414.40 66.40 SCE Gen
REDOND_7_UNIT 6 REDONDO GEN STA. UNIT 6 Planned 175.00 175.00 SCE Gen
RENWD_1_QF Renwind re-powering project Forced 10.00 0.00 SCE Gen
ROSMDW_2_WIND1 Pacific Wind - Phase 1 Forced 140.00 4.00 SDGE Gen
RVSIDE_6_SPRING SPRINGS GENERATION PROJECT AGGREGATE Planned 36.00 0.00 SCE Gen
SAMPSN_6_KELCO1 KELCO QUALIFYING FACILITY Planned 25.00 7.40 SDGE Gen
SANDLT_2_SUNITS Mojave Solar Planned 275.00 150.00 SCE Gen
SANTGO_6_COYOTE GAS RECOVERY SYS. (COYOTE CANYON) Forced 9.99 9.99 SCE Gen
SANWD_1_QF San Gorgonio Farms Wind Farm Planned 31.00 6.06 SCE Gen
SAUGUS_7_LOPEZ MM Lopez Energy Planned 6.10 0.90 SCE Gen
SBERDO_2_SNTANA SANTA ANA PSP Planned 6.95 5.95 SCE Gen
SBERDO_6_MILLCK MILL CREEK PSP Planned/Forced 3.93 2.93 SCE Gen
SENTNL_2_CTG3 Sentinel Unit 3 Forced 92.36 0.00 SCE Gen
SLYCRK_1_UNIT 1 SLY CREEK HYDRO Forced 13.00 6.50 PGAE North
SNCLRA_6_WILLMT WILLIAMETTE Forced 27.81 0.00 SCE Gen
SPRGVL_2_TULE TULE RIVER HYDRO PLANT (PG&E) Planned 6.40 0.00 SCE Gen
STANIS_7_UNIT 1 STANISLAUS HYDRO Forced 91.00 16.00 PGAE North
SYCAMR_2_UNIT 1 Sycamore Cogeneration Unit 1 Planned 85.00 6.60 SCE Gen
SYCAMR_2_UNIT 2 Sycamore Cogeneration Unit 2 Planned 85.00 4.49 SCE Gen
SYCAMR_2_UNIT 3 Sycamore Cogeneration Unit 3 Planned 85.00 2.80 SCE Gen
SYCAMR_2_UNIT 4 Sycamore Cogeneration Unit 4 Planned 85.00 3.87 SCE Gen
TERMEX_2_PL1X3 TDM Forced 625.00 2.00 SDGE Gen
TIFFNY_1_DILLON TIFFNY_1_DILLON Forced 45.00 0.00 SCE Gen
ULTRCK_2_UNIT Rio Bravo Rocklin Forced 28.80 28.80 PGAE North
VALLEY_7_BADLND VALLEY_7_BADLND Forced 1.30 0.00 SCE Gen
VALLEY_7_UNITA1 WM Energy, El Sobrante Landfill Forced 3.74 1.94 SCE Gen
VERNON_6_GONZL1 H. Gonzales Unit #1 Planned 5.75 5.75 SCE Gen
VERNON_6_GONZL2 H. Gonzales Unit #2 Planned 5.75 5.75 SCE Gen
VESTAL_2_KERN KERN RIVER PH 3 UNITS 1 & 2 AGGREGATE Forced 36.80 16.30 SCE Gen
VESTAL_2_WELLHD Wellhead Power Delano Planned 49.00 0.00 SCE Gen
VICTOR_1_LVSLR2 Lone Valley Solar Park 2 Forced 20.00 0.00 SCE Gen
VINCNT_2_WESTWD Oasis Power Plant Planned 60.00 4.00 SCE Gen
WALCRK_2_CTG1 Walnut Creek Energy Park Unit 1 Planned 96.43 0.00 SCE Gen
WALCRK_2_CTG2 Walnut Creek Energy Park Unit 2 Planned 96.91 0.00 SCE Gen
WALCRK_2_CTG3 Walnut Creek Energy Park Unit 3 Planned 96.65 0.00 SCE Gen
WALCRK_2_CTG4 Walnut Creek Energy Park Unit 4 Planned 96.49 0.00 SCE Gen
WALCRK_2_CTG5 Walnut Creek Energy Park Unit 5 Planned 96.65 0.00 SCE Gen
WHTWTR_1_WINDA1 Whitewater Hill Wind Project Forced 61.50 16.50 SCE Gen
WNDSTR_2_WIND Windstar Planned 120.00 0.00 SCE Gen
ADLIN_1_UNITS GEYSERS AIDLIN AGGREGATE Planned 22.00 7.00
ALMEGT_1_UNIT 1 ALAMEDA GT UNIT 1 Planned 23.80 23.80
ALMEGT_1_UNIT 2 ALAMEDA GT UNIT 2 Planned 25.40 25.40
BALCHS_7_UNIT 3 BALCH 2 PH UNIT 3 Planned 54.60 54.60
BCTSYS_5_PWXDYN BCTSYS_5_PWXDYN Forced 428.00 128.00
BDGRCK_1_UNITS BADGER CREEK LIMITED Forced 47.49 2.49
BEARMT_1_UNIT Bear Mountain Limited Forced 47.49 1.49
BELDEN_7_UNIT 1 BELDEN HYDRO Planned/Forced 119.00 119.00
BLCKBT_2_STONEY BLACK BUTTE HYDRO Forced 6.20 6.20
BNNIEN_7_ALTAPH ALTA POWER HOUSE Planned 1.00 1.00
BRDSLD_2_HIWIND High Winds Energy Center Forced 162.00 10.80
BRDSLD_2_SHILO1 Shiloh I Wind Project Forced 150.00 3.00
BRDSLD_2_SHILO2 SHILOH WIND PROJECT 2 Planned 150.00 4.00
BRDSLD_2_SHLO3A Shiloh III Wind Project, LLC Forced 102.50 2.50
BRDSLD_2_SHLO3B Shiloh IV Wind Project Forced 100.00 0.00
BUCKCK_7_PL1X2 BUCKS CREEK AGGREGATE Forced 59.00 9.00
CAPWD_1_QF Edom Hills Wind Farm Forced 19.55 4.55
CHALK_1_UNIT CHALK CLIFF LIMITED Forced 47.49 2.49
CHWCHL_1_BIOMAS Chow II Biomass to Energy Planned 10.80 1.30
CHWCHL_1_UNIT CHOW 2 PEAKER PLANT Planned 48.60 0.00
CNTRVL_6_UNIT Centerville Forced 6.40 6.40
COCOPP_2_CTG1 Marsh Landing 1 Forced 204.20 1.71
COCOPP_2_CTG2 Marsh Landing 2 Forced 202.70 1.07
COCOPP_2_CTG3 Marsh Landing 3 Forced 208.96 7.76
COCOPP_2_CTG4 Marsh Landing 4 Forced 204.29 1.20
CORRAL_6_SJOAQN Ameresco San Joaquin Planned 4.30 0.00
COTTLE_2_FRNKNH Frankenheimer Power Plant Forced 5.30 0.00
CRNEVL_6_CRNVA Crane Valley Planned 0.90 0.00
CRNEVL_6_SJQN 2 SAN JOAQUIN 2 Planned 3.20 0.00
CRNEVL_6_SJQN 3 SAN JOAQUIN 3 Planned 4.20 0.00
CSTRVL_7_PL1X2 Marina Land Fill Gas Planned 4.53 3.73
DALYCT_1_FCELL PGE San Francisco State Fuel Cell Forced 1.60 1.40
DELTA_2_PL1X4 DELTA ENERGY CENTER AGGREGATE Forced 880.00 0.00
DINUBA_6_UNIT DINUBA GENERATION PROJECT Forced 12.00 12.00
DISCOV_1_CHEVRN CHEVRON USA (EASTRIDGE) Forced 56.20 56.20
DONNLS_7_UNIT Donnells Hydro Forced 72.00 0.00
DOUBLC_1_UNITS DOUBLE "C" LIMITED Forced 52.23 0.83
DRACKR_2_SOLAR1 Dracker Solar Unit 1 Forced 110.00 79.60
ELKCRK_6_STONYG STONEY GORGE HYDRO AGGREGATE Forced 4.90 4.90
ELKHIL_2_PL1X3 ELK HILLS COMBINED CYCLE (AGGREGATE) Forced 551.70 50.70
ELNIDP_6_BIOMAS El Nido Biomass to Energy Planned 10.50 0.30
ETIWND_2_RTS017 SPVP017 Forced 3.50 0.00
EXCHEC_7_UNIT 1 EXCHEQUER HYDRO Planned 94.50 94.50
FLOWD2_2_FPLWND DIABLO WINDS Forced 18.60 0.00
FORKBU_6_UNIT HYPOWER, INC. (FORKS OF BUTTE) Forced 14.30 14.30
FRESHW_1_SOLAR1 Freshwater Solar Planned 20.00 14.00
FRIANT_6_UNITS FRIANT DAM Forced 33.70 0.00
GATWAY_2_PL1X3 GATEWAY GENERATING STATION Forced 562.50 0.20
GEYS11_7_UNIT11 GEYSERS UNIT 11 (HEALDSBURG) Forced 74.40 6.40
GEYS12_7_UNIT12 GEYSERS UNIT 12 (HEALDSBURG) Forced 57.00 3.00
GEYS13_7_UNIT13 GEYSERS UNIT 13 (HEALDSBURG) Planned 95.00 8.00
GEYS14_7_UNIT14 GEYSERS UNIT 14 (HEALDSBURG) Forced 70.00 10.00
GEYS16_7_UNIT16 GEYSERS UNIT 16 (HEALDSBURG) Forced 85.00 85.00
GEYS17_7_UNIT17 GEYSERS UNIT 17 (HEALDSBURG) Planned 60.00 0.00
GEYS18_7_UNIT18 GEYSERS UNIT 18 (HEALDSBURG) Forced 72.00 72.00
GEYS20_7_UNIT20 GEYSERS UNIT 20 (HEALDSBURG) Forced 62.00 62.00
GRIFFI_2_LSPDYN Griffith Energy Forced 570.00 370.00
GRNVLY_7_SCLAND SANTA CRUZ LANDFILL GENERATING PLANT Planned 3.04 0.00
GWFPWR_1_UNITS HANFORD PEAKER PLANT Forced 98.46 0.39
GYS5X6_7_UNITS GEYSERS UNITS 5 & 6 AGGREGATE Forced 85.00 0.00
GYS7X8_7_UNITS GEYSERS UNITS 7 & 8 AGGREGATE Planned 82.00 4.00
HATRDG_2_WIND Hatchet Ridge Wind Farm Forced 102.00 7.70
HENRTA_6_UNITA1 GWF HENRIETTA PEAKER PLANT UNIT 1 Forced 49.98 1.27
HENRTA_6_UNITA2 GWF HENRIETTA PEAKER PLANT UNIT 2 Forced 49.42 0.82
HMLTBR_6_UNITS HAMILTON BRANCH PH (AGGREGATE) Planned/Forced 4.90 4.90
HYTTHM_2_UNITS HYATT-THERMALITO PUMP-GEN (AGGREGATE) Planned/Forced 933.10 700.10
INTKEP_2_UNITS CCSF Hetch_Hetchy Hydro Aggregate Forced 405.00 88.00
INTMNT_3_RIVERSIDE IPPDYN Forced 137.00 1.00
KELSO_2_UNITS Mariposa Energy Forced 196.00 0.00
KERNFT_1_UNITS KERN FRONT LIMITED Forced 52.40 0.80
KRNCNY_6_UNIT KERN CANYON Planned 11.50 11.50
LAMONT_1_SOLAR4 Hayworth Solar Farm Forced 26.66 26.66
LAMONT_1_SOLAR5 Redcrest Solar Farm Forced 16.66 0.00
LAPAC_6_UNIT LOUISIANA PACIFIC SAMOA Forced 20.00 20.00
LAPLMA_2_UNIT 1 La Paloma Generating Plant Unit #1 Forced 259.80 3.80
LAPLMA_2_UNIT 2 La Paloma Generating Plant Unit #2 Forced 260.20 3.20
LAPLMA_2_UNIT 3 La Paloma Generating Plant Unit #3 Forced 256.15 3.15
LAPLMA_2_UNIT 4 LA PALOMA GENERATING PLANT, UNIT #4 Forced 259.54 3.54
LASSEN_6_AGV1 AGV 1 Planned 1.80 1.80
LECEF_1_UNITS LOS ESTEROS ENERGY FACILITY AGGREGATE Forced 294.00 6.40
LITLRK_6_SOLAR2 Palmdale 18 Forced 2.00 0.00
LITLRK_6_SOLAR4 Little Rock Pham Solar Forced 3.00 0.00
LIVOAK_1_UNIT 1 LIVE OAK LIMITED Forced 47.49 0.49
LODIEC_2_PL1X2 Lodi Energy Center Forced 302.58 13.58
MALAGA_1_PL1X2 Malaga Power Aggregate Planned 96.00 0.00
MCSWAN_6_UNITS MC SWAIN HYDRO Planned 10.00 10.00
MERCFL_6_UNIT MERCED FALLS Forced 3.50 3.50
METEC_2_PL1X3 Metcalf Energy Center Forced 593.16 23.16
MKTRCK_1_UNIT 1 MCKITTRICK LIMITED Forced 47.49 1.49
MOSSLD_7_UNIT 6 MOSS LANDING UNIT 6 Planned 754.00 0.00
MOSSLD_7_UNIT 7 MOSS LANDING UNIT 7 Forced 755.00 15.00
MTNPOS_1_UNIT MT.POSO COGENERATION CO. Forced 46.64 43.64
NCPA_7_GP2UN3 NCPA GEO PLANT 2 UNIT 3 Planned 42.42 42.42
NZWIND_6_CALWND Wind Resource I Forced 9.00 0.48
OAK C_7_UNIT 1 OAKLAND STATION C GT UNIT 1 Forced 55.00 0.00
OAK C_7_UNIT 3 OAKLAND STATION C GT UNIT 3 Forced 55.00 0.00
OASIS_6_SOLAR2 Oasis Solar Planned/Forced 20.00 2.00
OILDAL_1_UNIT 1 Oildale Energy Forced 40.00 0.00
OILFLD_7_QFUNTS Nacimiento Hydroelectric Plant Forced 3.80 3.80
OLDRIV_6_BIOGAS Bidart Old River 1 Forced 2.00 1.01
PINFLT_7_UNITS PINE FLAT HYDRO AGGREGATE Planned 210.00 179.40
PITTSP_7_UNIT 5 PITTSBURG UNIT 5 Forced 312.00 312.00
PITTSP_7_UNIT 7 PITTSBURG UNIT 7 Planned 530.00 130.00
PMPJCK_1_SOLAR1 Pumpjack Solar I Forced 19.48 19.48
PNCHPP_1_PL1X2 Midway Peaking Aggregate Forced 119.91 0.00
PNOCHE_1_UNITA1 CalPeak Power Panoche Unit 1 Planned 52.01 0.00
PRIMM_2_SOLAR1 Silver State South Planned/Forced 250.00 122.90
RICHMN_7_BAYENV BAY ENVIRONMENTAL (NOVE POWER) Forced 2.50 2.00
SANLOB_1_LNDFIL Cold Canyon Forced 1.50 1.50
SANTFG_7_UNITS GEYSERS CALISTOGA AGGREGATE Forced 92.10 26.10
SCEHOV_2_HOOVER SCEHOV_2_HOOVER Planned 525.00 237.00
SCHLTE_1_PL1X3 Tracy Combined Cycle Power Plant Forced 332.28 0.00
SIERRA_1_UNITS HIGH SIERRA LIMITED Forced 52.43 1.03
SLUISP_2_UNITS SAN LUIS (GIANELLI) PUMP-GEN (AGGREGATE) Planned/Forced 374.43 214.43
SMUDGO_7_UNIT 1 SONOMA POWER PLANT Forced 53.00 27.00
SNMALF_6_UNITS Sonoma County Landfill Planned 7.50 4.10
SPIAND_1_ANDSN2 SPI Anderson 2 Forced 27.15 0.00
SUNRIS_2_PL1X3 Sunrise Power Project AGGREGATE II Forced 586.02 5.02
SUNSET_2_UNITS MIDWAY SUNSET COGENERATION PLANT Forced 248.00 14.00
SUTTER_2_PL1X3 SUTTER POWER PLANT AGGREGATE Forced 525.00 525.00
SWIFT_1_NAS YERBA BUENA BATTERY Forced 4.80 4.80
THMENG_1_UNIT 1 Tracy Biomass Forced 18.50 18.50
TULLCK_7_UNITS Tullock Hydro Planned 25.90 0.00
TUPMAN_1_BIOGAS ABEC Bidart-Stockale #1 Forced 0.60 0.60
TXMCKT_6_UNIT McKittrick Cogen Forced 11.20 6.20
UKIAH_7_LAKEMN UKIAH LAKE MENDOCINO HYDRO Forced 3.50 2.50
USWND2_1_WIND1 Golden Hills A Forced 42.96 4.16
USWND2_1_WIND2 Golden Hills B Forced 42.96 5.16
USWNDR_2_SMUD SOLANO WIND FARM Forced 102.18 0.00
USWNDR_2_SMUD2 Solano Wind Project Phase 3 Forced 127.80 0.00
VACADX_1_UNITA1 CalPeak Power Vaca Dixon Unit 1 Planned 50.61 0.00
VLYHOM_7_SSJID Woodward Power Plant Forced 3.00 0.00
WDFRDF_2_UNITS WEST FORD FLAT AGGREGATE Forced 32.60 32.60
WHEATL_6_LNDFIL G2 ENERGY, OSTROM ROAD LLC Forced 3.00 1.50
WNDMAS_2_UNIT 1 BUENA VISTA ENERGY, LLC Forced 38.00 0.00
ZOND_6_UNIT ZOND WINDSYSTEMS INC. Forced 17.10 17.10


Outage Summary
Zone Name Number Of Outages MW's
Planned Forced Limitation Shutdown
PGAE North 18 16 903.09 714.92
SCE Gen 63 91 1942.05 380.60
SDGE Gen 11 12 396.41 353.25
46 148 4337.50 1693.46
Total 138 267 7579.05 3142.23


Report Generated on:
01/04/2016 15:15:06 (PPT)
Filtered Parameters:
Date = 01/04/2016
Resource = ALL
Area = ALL
States = ALL
Outage Origin = CAISO
Configurable Parameters:
Time = 3:15PM PPT

System conditions are dynamic and may change, affecting the accuracy of this report. This report includes all outages, curtailments and temporary operating constraints reflecting normal operations that are effective at the time of the report. Because outages may overlap or may not all be simultaneously in effect at the time of this report, Other real-time reports may indicate a different total outage/curtailment than this report. This report reflects the best available data at the date and time of the report. It is a snapshot of conditions existing at the time the report was posted. This report is initiated once daily 1515 Pacific Time.

The content of these pages is subject to change without notice. Decisions based on information contained within the California ISO web site are the visitor's sole responsibility.