Resource ID |
Resource Name
|
Outage Type
|
Capacity (MW)
|
Curtailed (MW)
|
Zone Name
|
ALAMIT_7_UNIT 1 |
ALAMITOS GEN STA. UNIT 1 |
Forced |
174.56 |
109.56 |
SCE Gen |
ALAMIT_7_UNIT 3 |
ALAMITOS GEN STA. UNIT 3 |
Planned |
332.18 |
332.18 |
SCE Gen |
ALTA3A_2_CPCE8 |
CPC East - Alta Wind 8 |
Planned |
150.00 |
0.00 |
SCE Gen |
ALTA4B_2_CPCW6 |
CPC West - Alta Wind 6 |
Planned |
150.00 |
0.00 |
SCE Gen |
ALTA6B_2_WIND11 |
Alta Wind 11 |
Forced |
90.00 |
0.00 |
SCE Gen |
ALTA6E_2_WIND10 |
Alta Wind 10 |
Forced |
138.00 |
0.00 |
SCE Gen |
ARBWD_6_QF |
Wind Resource II |
Forced |
19.95 |
0.06 |
SCE Gen |
ARCOGN_2_UNITS |
WATSON COGENERATION |
Planned |
416.60 |
196.60 |
SCE Gen |
AVSOLR_2_SOLAR |
AV SOLAR RANCH 1 |
Planned |
241.50 |
30.00 |
SCE Gen |
BIGCRK_2_EXESWD |
BIG CREEK HYDRO PROJECT PSP |
Planned |
820.00 |
357.00 |
SCE Gen |
BISHOP_1_ALAMO |
BISHOP CREEK PLANT 2 AND 6 |
Planned/Forced |
13.40 |
2.50 |
SCE Gen |
BISHOP_1_UNITS |
BISHOP CREEK PLANT 3 AND 4 |
Forced |
15.80 |
9.80 |
SCE Gen |
BLAST_1_WIND |
Mountain View IV Wind |
Planned |
49.00 |
0.00 |
SCE Gen |
BLKCRK_2_SOLAR1 |
McCoy Station |
Planned |
250.00 |
36.00 |
SCE Gen |
BOGUE_1_UNITA1 |
Feather River Energy Center, Unit #1 |
Planned |
46.30 |
46.30 |
PGAE North |
BORDER_6_UNITA1 |
CalPeak Power Border Unit 1 |
Planned/Forced |
51.25 |
3.25 |
SDGE Gen |
BRODIE_2_WIND |
Coram Brodie Wind Project |
Planned |
102.00 |
0.00 |
SCE Gen |
BUCKWD_1_QF |
Buckwind Re-powering project |
Forced |
16.50 |
0.00 |
SCE Gen |
BUTTVL_7_UNIT 1 |
BUTT VALLEY HYDRO |
Forced |
40.00 |
4.00 |
PGAE North |
CARBOU_7_PL4X5 |
CARIBOU PH 2 UNIT 4 & 5 AGGREGATE |
Planned/Forced |
122.00 |
61.00 |
PGAE North |
CARBOU_7_UNIT 1 |
CARIBOU PH 1 UNIT 1 |
Planned |
24.00 |
24.00 |
PGAE North |
CCRITA_7_RPPCHF |
Rancho Penasquitos Hydro Facility |
Forced |
5.25 |
5.25 |
SDGE Gen |
CENTER_2_QF |
CENTER QFS |
Forced |
31.00 |
31.00 |
SCE Gen |
CHILLS_1_SYCENG |
Sycamore Energy 1 |
Planned |
1.50 |
0.00 |
SDGE Gen |
CHINO_2_SOLAR |
Chino RT Solar 1 |
Planned |
1.00 |
0.00 |
SCE Gen |
CHINO_7_MILIKN |
MN Milliken Genco LLC |
Planned |
1.90 |
1.90 |
SCE Gen |
COLGAT_7_UNIT 2 |
COLGATE HYDRO UNIT 2 |
Planned/Forced |
175.67 |
175.67 |
PGAE North |
COLUSA_2_PL1X3 |
Colusa Generating Station |
Forced |
641.00 |
26.90 |
PGAE North |
CORONS_6_CLRWTR |
Clearwater Power Plant |
Planned |
28.00 |
28.00 |
SCE Gen |
CPVERD_2_SOLAR |
Campo Verde Solar |
Forced |
139.00 |
30.24 |
SDGE Gen |
CRESTA_7_PL1X2 |
CRESTA PH UNIT 1 & 2 AGGREGATE |
Planned |
70.40 |
0.00 |
PGAE North |
CRSTWD_6_KUMYAY |
Kumeyaay Wind Farm |
Planned/Forced |
50.00 |
0.00 |
SDGE Gen |
CSLR4S_2_SOLAR |
Csolar IV South |
Planned/Forced |
130.00 |
51.68 |
SDGE Gen |
DSRTSL_2_SOLAR1 |
Desert Stateline |
Planned |
299.99 |
113.99 |
SCE Gen |
DSRTSN_2_SOLAR1 |
Desert Sunlight 300 |
Planned/Forced |
300.00 |
80.00 |
SCE Gen |
DUTCH1_7_UNIT 1 |
DUTCH FLAT 1 PH |
Planned |
22.00 |
22.00 |
PGAE North |
DVLCYN_1_UNITS |
DEVIL CANYON HYDRO UNITS 1-4 AGGREGATE |
Planned |
236.80 |
0.00 |
SCE Gen |
ELDORO_7_UNIT 1 |
El Dorado Unit 1 |
Forced |
11.00 |
11.00 |
PGAE North |
ELSEGN_2_UN1011 |
El Segundo Energy Center 5/6 |
Planned |
263.00 |
263.00 |
SCE Gen |
ELSEGN_2_UN2021 |
El Segundo Energy Center 7/8 |
Planned |
263.68 |
263.68 |
SCE Gen |
ENCINA_7_EA3 |
ENCINA UNIT 3 |
Planned |
110.00 |
110.00 |
SDGE Gen |
ESCNDO_6_PL1X2 |
MMC Escondido Aggregate |
Planned |
48.71 |
0.00 |
SDGE Gen |
ESCNDO_6_UNITB1 |
CalPeak Power Enterprise Unit 1 |
Planned/Forced |
48.04 |
0.00 |
SDGE Gen |
ESCO_6_GLMQF |
GOAL LINE L.P. |
Planned |
49.90 |
49.90 |
SDGE Gen |
ETIWND_2_FONTNA |
FONTANALYTLE CREEK POWERHOUSE P |
Planned |
2.56 |
2.06 |
SCE Gen |
ETIWND_2_RTS010 |
SPVP010 Fontana RT Solar |
Planned |
1.50 |
0.00 |
SCE Gen |
ETIWND_2_RTS015 |
SPVP015 |
Planned |
3.00 |
0.00 |
SCE Gen |
ETIWND_2_RTS018 |
SPVP018 Fontana RT Solar |
Planned |
1.50 |
0.00 |
SCE Gen |
ETIWND_2_RTS023 |
SPVP023 Fontana RT Solar |
Planned |
2.50 |
0.00 |
SCE Gen |
ETIWND_6_MWDETI |
ETIWANDA RECOVERY HYDRO |
Planned |
24.00 |
24.00 |
SCE Gen |
ETIWND_7_MIDVLY |
MN Mid Valley Genco LLC |
Planned |
2.10 |
0.30 |
SCE Gen |
ETIWND_7_UNIT 4 |
ETIWANDA GEN STA. UNIT 4 |
Planned |
320.00 |
320.00 |
SCE Gen |
FAIRHV_6_UNIT |
FAIRHAVEN POWER CO. |
Planned |
19.90 |
19.90 |
PGAE North |
GARNET_1_UNITS |
GARNET GREEN POWER PROJECT AGGREGATE |
Forced |
16.50 |
0.00 |
SCE Gen |
GARNET_1_WINDS |
Garnet Winds Aggregation |
Forced |
22.50 |
0.50 |
SCE Gen |
GARNET_2_WIND1 |
Phoenix |
Forced |
11.20 |
11.20 |
SCE Gen |
GARNET_2_WIND2 |
Karen Avenue Wind Farm |
Forced |
11.70 |
6.00 |
SCE Gen |
GARNET_2_WIND3 |
San Gorgonio East |
Forced |
12.60 |
0.00 |
SCE Gen |
GLNARM_7_UNIT 1 |
GLEN ARM UNIT 1 |
Planned |
22.07 |
22.07 |
SCE Gen |
GLNARM_7_UNIT 2 |
GLEN ARM UNIT 2 |
Forced |
22.30 |
22.30 |
SCE Gen |
GOLETA_6_EXGEN |
EXXON COMPANY USA |
Forced |
48.20 |
48.20 |
SCE Gen |
GOLETA_6_TAJIGS |
GOLETA_6_TAJIGS |
Forced |
3.10 |
3.10 |
SCE Gen |
GRNLF1_1_UNITS |
GREENLEAF #1 COGEN AGGREGATE |
Forced |
49.20 |
0.00 |
PGAE North |
HAASPH_7_PL1X2 |
HAAS PH UNIT 1 & 2 AGGREGATE |
Forced |
144.00 |
0.00 |
PGAE North |
HIDSRT_2_UNITS |
HIGH DESERT POWER PROJECT AGGREGATE |
Forced |
830.00 |
92.00 |
SCE Gen |
HINSON_6_SERRGN |
CITY OF LONG BEACH |
Planned |
38.91 |
38.91 |
SCE Gen |
INDIGO_1_UNIT 1 |
INDIGO PEAKER UNIT 1 |
Planned |
44.00 |
44.00 |
SCE Gen |
INDIGO_1_UNIT 2 |
INDIGO PEAKER UNIT 2 |
Planned |
44.53 |
44.53 |
SCE Gen |
INDIGO_1_UNIT 3 |
INDIGO PEAKER UNIT 3 |
Planned |
43.69 |
43.69 |
SCE Gen |
IVWEST_2_SOLAR1 |
Imperial Valley West ( Q # 608) |
Planned |
150.00 |
0.00 |
SDGE Gen |
JAWBNE_2_NSRWND |
North Sky River Wind Project |
Forced |
160.00 |
9.60 |
SCE Gen |
KERKH1_7_UNIT 3 |
KERKHOFF PH 1 UNIT #3 |
Forced |
12.80 |
12.80 |
PGAE North |
KERKH2_7_UNIT 1 |
KERKHOFF PH 2 UNIT #1 |
Planned |
153.90 |
153.90 |
PGAE North |
KERRGN_1_UNIT 1 |
KERN RIVER HYDRO UNITS 1-4 AGGREGATE |
Forced |
25.60 |
6.60 |
SCE Gen |
LAKHDG_6_UNIT 1 |
Lake Hodges Pumped Storage-Unit1 |
Planned |
20.00 |
20.00 |
SDGE Gen |
LAKHDG_6_UNIT 2 |
Lake Hodges Pumped Storage-Unit2 |
Planned |
20.15 |
20.15 |
SDGE Gen |
LARKSP_6_UNIT 1 |
LARKSPUR PEAKER UNIT 1 |
Forced |
46.10 |
0.10 |
SDGE Gen |
LARKSP_6_UNIT 2 |
LARKSPUR PEAKER UNIT 2 |
Forced |
47.98 |
2.98 |
SDGE Gen |
LAROA1_2_UNITA1 |
LR1 |
Forced |
180.00 |
15.00 |
SDGE Gen |
LAROA2_2_UNITA1 |
LR2 |
Forced |
322.00 |
7.00 |
SDGE Gen |
LEBECS_2_UNITS |
Pastoria Energy Facility |
Planned/Forced |
799.47 |
254.47 |
SCE Gen |
MANZNA_2_WIND |
Manzana Wind |
Forced |
189.00 |
0.00 |
SCE Gen |
MIRLOM_2_ONTARO |
Ontario RT Solar |
Planned |
5.50 |
0.00 |
SCE Gen |
MIRLOM_6_PEAKER |
Mira Loma Peaker |
Planned |
46.00 |
46.00 |
SCE Gen |
MOJAVE_1_SIPHON |
MOJAVE SIPHON POWER PLANT |
Planned |
12.58 |
0.00 |
SCE Gen |
MONLTH_6_BOREL |
BOREL HYDRO UNITS 1-3 AGGREGATE |
Forced |
11.00 |
11.00 |
SCE Gen |
MOORPK_7_UNITA1 |
WEME- Simi Valley Landfill |
Forced |
2.49 |
0.49 |
SCE Gen |
MRCHNT_2_PL1X3 |
Desert Star Energy Center |
Forced |
494.58 |
7.58 |
SCE Gen |
MSOLAR_2_SOLAR1 |
Mesquite Solar 1 |
Planned |
165.00 |
0.00 |
SCE Gen |
MTWIND_1_UNIT 1 |
Mountain View Power Project I |
Planned/Forced |
44.40 |
0.00 |
SCE Gen |
MTWIND_1_UNIT 2 |
Mountain View Power Project II |
Planned/Forced |
22.20 |
0.00 |
SCE Gen |
MTWIND_1_UNIT 3 |
Mountain View Power Project III |
Forced |
22.44 |
0.00 |
SCE Gen |
NGILAA_5_SDGDYN |
NGILAA_5_SDGDYN |
Planned |
57.00 |
57.00 |
SDGE Gen |
OMAR_2_UNIT 1 |
KERN RIVER COGENERATION CO. UNIT 1 |
Forced |
78.00 |
3.00 |
SCE Gen |
OMAR_2_UNIT 2 |
KERN RIVER COGENERATION CO. UNIT 2 |
Forced |
78.11 |
2.01 |
SCE Gen |
OMAR_2_UNIT 3 |
KERN RIVER COGENERATION CO. UNIT 3 |
Forced |
81.41 |
4.01 |
SCE Gen |
ORMOND_7_UNIT 2 |
ORMOND BEACH GEN STA. UNIT 2 |
Planned/Forced |
775.00 |
775.00 |
SCE Gen |
OTAY_6_PL1X2 |
Chula Vista Energy Center, LLC |
Planned |
35.50 |
35.50 |
SDGE Gen |
OTMESA_2_PL1X3 |
OTAY MESA ENERGY CENTER |
Forced |
603.68 |
10.68 |
SDGE Gen |
OXBOW_6_DRUM |
OXBOW HYDRO |
Planned |
6.00 |
6.00 |
PGAE North |
PACLUM_6_UNIT |
PACIFIC LUMBER (HUMBOLDT) |
Forced |
28.80 |
13.80 |
PGAE North |
PADUA_2_ONTARO |
ONTARIO/SIERRA HYDRO PSP |
Planned |
1.92 |
1.42 |
SCE Gen |
PANDOL_6_UNIT |
Covanta Delano, Inc. |
Planned |
49.00 |
49.00 |
SCE Gen |
PANSEA_1_PANARO |
Mesa Wind Project |
Planned |
30.00 |
21.61 |
SCE Gen |
PIT3_7_PL1X3 |
PIT PH 3 UNITS 1, 2 & 3 AGGREGATE |
Planned |
70.60 |
46.60 |
PGAE North |
PIT5_7_PL3X4 |
PIT PH 5 UNITS 3 & 4 AGGREGATE |
Planned |
82.00 |
82.00 |
PGAE North |
POEPH_7_UNIT 2 |
POE HYDRO UNIT 2 |
Planned |
68.50 |
68.50 |
PGAE North |
POTTER_6_UNITS |
Potter Valley |
Planned |
10.10 |
10.10 |
PGAE North |
PRIMM_2_SOLAR1 |
Silver State South |
Planned |
250.00 |
91.00 |
SCE Gen |
PWEST_1_UNIT |
PACIFIC WEST 1 WIND GENERATION |
Forced |
2.10 |
2.10 |
SCE Gen |
RAMON_2_SCEDYN |
RAMON_2_SCEDYN |
Planned |
414.40 |
242.40 |
SCE Gen |
RECTOR_2_KAWEAH |
KAWEAH PH 2 & 3 PSP AGGREGATE |
Forced |
6.55 |
2.00 |
SCE Gen |
REDOND_7_UNIT 5 |
REDONDO GEN STA. UNIT 5 |
Planned |
178.87 |
178.87 |
SCE Gen |
RENWD_1_QF |
Renwind re-powering project |
Forced |
10.00 |
0.00 |
SCE Gen |
ROSMDW_2_WIND1 |
Pacific Wind - Phase 1 |
Planned |
140.00 |
2.00 |
SDGE Gen |
RVSIDE_6_RERCU2 |
Riverside Energy Res. Ctr Unit 2 |
Planned |
48.50 |
48.50 |
SCE Gen |
SANTGO_6_COYOTE |
GAS RECOVERY SYS. (COYOTE CANYON) |
Forced |
9.99 |
9.99 |
SCE Gen |
SANWD_1_QF |
San Gorgonio Farms Wind Farm |
Planned |
31.00 |
5.90 |
SCE Gen |
SAUGUS_6_PTCHGN |
COUNTY OF LOS ANGELES -- PITCHLE |
Forced |
29.80 |
0.00 |
SCE Gen |
SAUGUS_7_LOPEZ |
MM Lopez Energy |
Planned |
6.10 |
4.09 |
SCE Gen |
SBERDO_2_REDLND |
Redlands RT Solar |
Planned |
2.00 |
0.00 |
SCE Gen |
SBERDO_2_RTS005 |
SPVP005 Redlands RT Solar |
Planned |
2.50 |
0.00 |
SCE Gen |
SBERDO_2_RTS007 |
SPVP007 Redlands RT Solar |
Planned |
2.50 |
0.00 |
SCE Gen |
SBERDO_2_RTS048 |
SPVP048 |
Planned |
5.00 |
0.00 |
SCE Gen |
SBERDO_2_SNTANA |
SANTA ANA PSP |
Planned |
6.95 |
5.45 |
SCE Gen |
SBERDO_6_MILLCK |
MILL CREEK PSP |
Planned |
3.93 |
2.63 |
SCE Gen |
SENTNL_2_CTG6 |
Sentinel Unit 6 |
Planned |
92.16 |
92.16 |
SCE Gen |
SENTNL_2_CTG7 |
Sentinel Unit 7 |
Planned |
91.84 |
0.00 |
SCE Gen |
SLSTR1_2_SOLAR1 |
Solar Star 1 |
Forced |
310.00 |
144.00 |
SCE Gen |
SLSTR2_2_SOLAR2 |
Solar Star 2 |
Forced |
276.00 |
276.00 |
SCE Gen |
SLYCRK_1_UNIT 1 |
SLY CREEK HYDRO |
Forced |
13.00 |
3.00 |
PGAE North |
SNCLRA_6_PROCGN |
PROCTER AND GAMBLE OXNARD II |
Forced |
49.50 |
49.50 |
SCE Gen |
SYCAMR_2_UNIT 1 |
Sycamore Cogeneration Unit 1 |
Planned |
85.00 |
3.97 |
SCE Gen |
SYCAMR_2_UNIT 2 |
Sycamore Cogeneration Unit 2 |
Planned |
85.00 |
11.09 |
SCE Gen |
SYCAMR_2_UNIT 3 |
Sycamore Cogeneration Unit 3 |
Planned |
85.00 |
2.69 |
SCE Gen |
SYCAMR_2_UNIT 4 |
Sycamore Cogeneration Unit 4 |
Planned |
85.00 |
5.29 |
SCE Gen |
TERMEX_2_PL1X3 |
TDM |
Forced |
625.00 |
8.00 |
SDGE Gen |
TIFFNY_1_DILLON |
TIFFNY_1_DILLON |
Forced |
45.00 |
1.00 |
SCE Gen |
VALLEY_5_PERRIS |
MWD Perris Hydroelectric Recovery Plant |
Forced |
7.94 |
0.00 |
SCE Gen |
VALLEY_5_RTS044 |
SPVP044 |
Planned |
8.00 |
0.00 |
SCE Gen |
VALLEY_7_BADLND |
VALLEY_7_BADLND |
Forced |
1.30 |
0.30 |
SCE Gen |
VALLEY_7_UNITA1 |
WM Energy, El Sobrante Landfill |
Planned/Forced |
3.74 |
2.94 |
SCE Gen |
VERNON_6_GONZL1 |
H. Gonzales Unit #1 |
Planned |
5.75 |
5.75 |
SCE Gen |
VERNON_6_GONZL2 |
H. Gonzales Unit #2 |
Planned |
5.75 |
5.75 |
SCE Gen |
VERNON_6_MALBRG |
Malburg Generating Station |
Forced |
134.00 |
22.00 |
SCE Gen |
VESTAL_2_RTS042 |
SPVP042 Porterville Solar |
Planned |
5.00 |
0.00 |
SCE Gen |
VESTAL_2_WELLHD |
Wellhead Power Delano |
Planned |
49.00 |
49.00 |
SCE Gen |
VICTOR_1_LVSLR2 |
Lone Valley Solar Park 2 |
Forced |
20.00 |
0.00 |
SCE Gen |
VINCNT_2_WESTWD |
Oasis Power Plant |
Planned |
60.00 |
5.00 |
SCE Gen |
VISTA_2_RIALTO |
Rialto RT Solar |
Planned |
1.00 |
0.00 |
SCE Gen |
WADHAM_6_UNIT |
Wadham Energy LP |
Planned |
32.00 |
32.00 |
PGAE North |
WALCRK_2_CTG1 |
Walnut Creek Energy Park Unit 1 |
Planned |
96.43 |
0.00 |
SCE Gen |
WALCRK_2_CTG2 |
Walnut Creek Energy Park Unit 2 |
Planned |
96.91 |
0.00 |
SCE Gen |
WALCRK_2_CTG3 |
Walnut Creek Energy Park Unit 3 |
Planned |
96.65 |
0.00 |
SCE Gen |
WALCRK_2_CTG4 |
Walnut Creek Energy Park Unit 4 |
Planned |
96.49 |
96.49 |
SCE Gen |
WALCRK_2_CTG5 |
Walnut Creek Energy Park Unit 5 |
Planned |
96.65 |
0.00 |
SCE Gen |
WDLEAF_7_UNIT 1 |
WOODLEAF HYDRO |
Forced |
60.00 |
0.00 |
PGAE North |
WHTWTR_1_WINDA1 |
Whitewater Hill Wind Project |
Forced |
61.50 |
25.50 |
SCE Gen |
WNDSTR_2_WIND |
Windstar |
Planned/Forced |
120.00 |
2.00 |
SCE Gen |
7STDRD_1_SOLAR1 |
Shafter Solar |
Forced |
20.00 |
2.00 |
|
ADERA_1_SOLAR1 |
Adera Solar |
Forced |
20.00 |
0.00 |
|
ADLIN_1_UNITS |
GEYSERS AIDLIN AGGREGATE |
Planned/Forced |
22.00 |
10.00 |
|
BALCHS_7_UNIT 2 |
BALCH 2 PH UNIT 2 |
Planned |
52.50 |
52.50 |
|
BALCHS_7_UNIT 3 |
BALCH 2 PH UNIT 3 |
Planned |
54.60 |
54.60 |
|
BCTSYS_5_PWXDYN |
BCTSYS_5_PWXDYN |
Forced |
428.00 |
158.00 |
|
BDGRCK_1_UNITS |
BADGER CREEK LIMITED |
Forced |
47.49 |
2.49 |
|
BEARMT_1_UNIT |
Bear Mountain Limited |
Forced |
47.49 |
1.49 |
|
BELDEN_7_UNIT 1 |
BELDEN HYDRO |
Planned/Forced |
119.00 |
119.00 |
|
BLCKBT_2_STONEY |
BLACK BUTTE HYDRO |
Forced |
6.20 |
0.00 |
|
BNNIEN_7_ALTAPH |
ALTA POWER HOUSE |
Planned |
1.00 |
0.00 |
|
BRDSLD_2_HIWIND |
High Winds Energy Center |
Forced |
162.00 |
0.00 |
|
BRDSLD_2_SHILO1 |
Shiloh I Wind Project |
Forced |
150.00 |
1.50 |
|
BRDSLD_2_SHILO2 |
SHILOH WIND PROJECT 2 |
Planned |
150.00 |
0.00 |
|
BRDSLD_2_SHLO3A |
Shiloh III Wind Project, LLC |
Forced |
102.50 |
32.50 |
|
BRDSLD_2_SHLO3B |
Shiloh IV Wind Project |
Forced |
100.00 |
0.00 |
|
BUCKCK_7_OAKFLT |
Oak Flat |
Forced |
1.30 |
1.30 |
|
BUCKCK_7_PL1X2 |
BUCKS CREEK AGGREGATE |
Forced |
59.00 |
9.00 |
|
CASTVL_2_FCELL |
PGE CSUEB Hayward Fuel Cell |
Forced |
1.40 |
1.40 |
|
CHALK_1_UNIT |
CHALK CLIFF LIMITED |
Forced |
47.49 |
1.59 |
|
CHWCHL_1_BIOMAS |
Chow II Biomass to Energy |
Planned |
10.80 |
1.00 |
|
CLOVER_2_UNIT |
MEGA HYDRO #1 (CLOVER CREEK) |
Forced |
1.50 |
1.50 |
|
CLRKRD_6_LIMESD |
Lime Saddle Hydro |
Planned |
2.00 |
2.00 |
|
CNTRVL_6_UNIT |
Centerville |
Forced |
6.40 |
6.40 |
|
COCOPP_2_CTG1 |
Marsh Landing 1 |
Planned |
204.20 |
204.20 |
|
COCOPP_2_CTG2 |
Marsh Landing 2 |
Planned |
202.70 |
202.70 |
|
COCOPP_2_CTG3 |
Marsh Landing 3 |
Forced |
208.96 |
9.67 |
|
COCOPP_2_CTG4 |
Marsh Landing 4 |
Forced |
204.29 |
3.13 |
|
COTTLE_2_FRNKNH |
Frankenheimer Power Plant |
Forced |
5.30 |
0.00 |
|
CRNEVL_6_CRNVA |
Crane Valley |
Forced |
0.90 |
0.00 |
|
CRNEVL_6_SJQN 2 |
SAN JOAQUIN 2 |
Forced |
3.20 |
1.20 |
|
CRNEVL_6_SJQN 3 |
SAN JOAQUIN 3 |
Forced |
4.20 |
4.20 |
|
CSTRVL_7_PL1X2 |
Marina Land Fill Gas |
Planned/Forced |
4.53 |
3.33 |
|
CUMBIA_1_SOLAR |
Columbia Solar Energy II |
Forced |
19.00 |
19.00 |
|
DALYCT_1_FCELL |
PGE San Francisco State Fuel Cell |
Planned/Forced |
1.60 |
1.43 |
|
DELTA_2_PL1X4 |
DELTA ENERGY CENTER AGGREGATE |
Forced |
880.00 |
43.00 |
|
DINUBA_6_UNIT |
DINUBA GENERATION PROJECT |
Forced |
12.00 |
12.00 |
|
DISCOV_1_CHEVRN |
CHEVRON USA (EASTRIDGE) |
Forced |
56.20 |
34.20 |
|
DONNLS_7_UNIT |
Donnells Hydro |
Forced |
72.00 |
1.50 |
|
DOUBLC_1_UNITS |
DOUBLE "C" LIMITED |
Forced |
52.23 |
1.23 |
|
DRACKR_2_SOLAR1 |
Dracker Solar Unit 1 |
Forced |
110.00 |
58.50 |
|
ELKHIL_2_PL1X3 |
ELK HILLS COMBINED CYCLE (AGGREGATE) |
Planned |
551.70 |
551.70 |
|
ELNIDP_6_BIOMAS |
El Nido Biomass to Energy |
Planned |
10.50 |
0.30 |
|
ELNIDS_2_DODPEV |
Los Angeles Air Force Base |
Forced |
0.50 |
0.40 |
|
ETIWND_2_RTS017 |
SPVP017 |
Planned |
3.50 |
0.00 |
|
ETIWND_2_RTS026 |
SPVP026 |
Planned |
6.00 |
0.00 |
|
ETIWND_2_RTS027 |
SPVP027 |
Planned |
2.00 |
0.00 |
|
ETIWND_2_SOLAR1 |
Dedeaux Ontario |
Planned/Forced |
1.00 |
0.00 |
|
ETIWND_2_UNIT1 |
New-Indy Ontario, LLC |
Forced |
33.60 |
25.60 |
|
EXCHEC_7_UNIT 1 |
EXCHEQUER HYDRO |
Planned |
94.50 |
94.50 |
|
FRESHW_1_SOLAR1 |
Freshwater Solar |
Planned/Forced |
20.00 |
0.00 |
|
FRIANT_6_UNITS |
FRIANT DAM |
Forced |
25.00 |
25.00 |
|
GATWAY_2_PL1X3 |
GATEWAY GENERATING STATION |
Forced |
562.50 |
10.20 |
|
GEYS11_7_UNIT11 |
GEYSERS UNIT 11 (HEALDSBURG) |
Forced |
74.40 |
7.40 |
|
GEYS12_7_UNIT12 |
GEYSERS UNIT 12 (HEALDSBURG) |
Forced |
57.00 |
3.00 |
|
GEYS13_7_UNIT13 |
GEYSERS UNIT 13 (HEALDSBURG) |
Planned |
95.00 |
7.00 |
|
GEYS14_7_UNIT14 |
GEYSERS UNIT 14 (HEALDSBURG) |
Forced |
70.00 |
9.00 |
|
GEYS16_7_UNIT16 |
GEYSERS UNIT 16 (HEALDSBURG) |
Forced |
85.00 |
85.00 |
|
GEYS17_7_UNIT17 |
GEYSERS UNIT 17 (HEALDSBURG) |
Planned |
60.00 |
0.00 |
|
GEYS18_7_UNIT18 |
GEYSERS UNIT 18 (HEALDSBURG) |
Forced |
72.00 |
72.00 |
|
GEYS20_7_UNIT20 |
GEYSERS UNIT 20 (HEALDSBURG) |
Forced |
62.00 |
62.00 |
|
GILROY_1_UNIT |
GILROY COGEN AGGREGATE |
Planned |
120.00 |
120.00 |
|
GRIFFI_2_LSPDYN |
Griffith Energy |
Forced |
570.00 |
320.00 |
|
GRSCRK_6_BGCKWW |
BIG CREEK WATER WORKS - CEDAR FLAT |
Forced |
5.00 |
1.00 |
|
GWFPWR_1_UNITS |
HANFORD PEAKER PLANT |
Forced |
98.46 |
1.44 |
|
GYS5X6_7_UNITS |
GEYSERS UNITS 5 & 6 AGGREGATE |
Forced |
85.00 |
0.00 |
|
GYS7X8_7_UNITS |
GEYSERS UNITS 7 & 8 AGGREGATE |
Planned |
82.00 |
5.00 |
|
GYSRVL_7_WSPRNG |
Sonoma CWA Warm Springs Hydro |
Forced |
3.75 |
2.63 |
|
HATRDG_2_WIND |
Hatchet Ridge Wind Farm |
Forced |
102.00 |
14.60 |
|
HELMPG_7_UNIT 1 |
HELMS PUMP-GEN UNIT 1 |
Forced |
407.00 |
0.00 |
|
HELMPG_7_UNIT 2 |
HELMS PUMP-GEN UNIT 2 |
Planned |
407.00 |
407.00 |
|
HENRTA_6_UNITA1 |
GWF HENRIETTA PEAKER PLANT UNIT 1 |
Forced |
49.98 |
1.79 |
|
HENRTA_6_UNITA2 |
GWF HENRIETTA PEAKER PLANT UNIT 2 |
Forced |
49.42 |
1.34 |
|
HMLTBR_6_UNITS |
HAMILTON BRANCH PH (AGGREGATE) |
Planned |
4.90 |
2.30 |
|
HYTTHM_2_UNITS |
HYATT-THERMALITO PUMP-GEN (AGGREGATE) |
Planned/Forced |
933.10 |
814.10 |
|
INTKEP_2_UNITS |
CCSF Hetch_Hetchy Hydro Aggregate |
Planned/Forced |
405.00 |
28.00 |
|
INTMNT_3_RIVERSIDE |
IPPDYN |
Forced |
137.00 |
1.00 |
|
JAKVAL_6_UNITG1 |
BUENA VISTA |
Forced |
17.84 |
0.00 |
|
KELSO_2_UNITS |
Mariposa Energy |
Forced |
196.00 |
0.00 |
|
KERNFT_1_UNITS |
KERN FRONT LIMITED |
Forced |
52.40 |
1.20 |
|
KERNRG_1_UNITS |
South Belridge Cogen Facility |
Planned |
55.20 |
12.20 |
|
KINGRV_7_UNIT 1 |
KINGS RIVER HYDRO UNIT 1 |
Planned |
51.20 |
51.20 |
|
KRNCNY_6_UNIT |
KERN CANYON |
Planned |
11.50 |
1.00 |
|
LAPAC_6_UNIT |
LOUISIANA PACIFIC SAMOA |
Forced |
20.00 |
20.00 |
|
LAPLMA_2_UNIT 1 |
La Paloma Generating Plant Unit #1 |
Forced |
259.80 |
9.80 |
|
LAPLMA_2_UNIT 2 |
La Paloma Generating Plant Unit #2 |
Forced |
260.20 |
10.20 |
|
LAPLMA_2_UNIT 3 |
La Paloma Generating Plant Unit #3 |
Forced |
256.15 |
9.15 |
|
LAPLMA_2_UNIT 4 |
LA PALOMA GENERATING PLANT, UNIT #4 |
Planned |
259.54 |
259.54 |
|
LASSEN_6_AGV1 |
AGV 1 |
Planned |
1.80 |
1.80 |
|
LECEF_1_UNITS |
LOS ESTEROS ENERGY FACILITY AGGREGATE |
Forced |
294.00 |
9.10 |
|
LITLRK_6_SOLAR4 |
Little Rock Pham Solar |
Planned/Forced |
3.00 |
0.00 |
|
LIVOAK_1_UNIT 1 |
LIVE OAK LIMITED |
Forced |
47.49 |
2.99 |
|
LMEC_1_PL1X3 |
Los Medanos Energy Center AGGREGATE |
Planned/Forced |
561.29 |
306.29 |
|
LODI25_2_UNIT 1 |
LODI GAS TURBINE |
Planned |
25.30 |
25.30 |
|
LODIEC_2_PL1X2 |
Lodi Energy Center |
Forced |
302.58 |
15.78 |
|
MALAGA_1_PL1X2 |
Malaga Power Aggregate |
Forced |
96.00 |
3.99 |
|
MENBIO_6_RENEW1 |
CalRENEW - 1(A) |
Planned |
5.00 |
0.00 |
|
MERCFL_6_UNIT |
MERCED FALLS |
Planned/Forced |
3.50 |
3.50 |
|
MIRLOM_2_RTS032 |
SPVP032 |
Planned |
1.50 |
0.00 |
|
MIRLOM_2_RTS033 |
SPVP033 |
Planned |
1.00 |
0.00 |
|
MKTRCK_1_UNIT 1 |
MCKITTRICK LIMITED |
Forced |
47.49 |
2.09 |
|
MOSSLD_7_UNIT 7 |
MOSS LANDING UNIT 7 |
Forced |
755.00 |
15.00 |
|
MRLSDS_6_SOLAR1 |
Morelos Solar |
Forced |
15.00 |
2.50 |
|
MSTANG_2_SOLAR3 |
Mustang 3 |
Planned/Forced |
40.00 |
40.00 |
|
MTNPOS_1_UNIT |
MT.POSO COGENERATION CO. |
Forced |
46.64 |
6.64 |
|
NCPA_7_GP2UN3 |
NCPA GEO PLANT 2 UNIT 3 |
Planned |
42.42 |
42.42 |
|
OAK C_7_UNIT 1 |
OAKLAND STATION C GT UNIT 1 |
Forced |
55.00 |
0.00 |
|
OAK C_7_UNIT 2 |
OAKLAND STATION C GT UNIT 2 |
Planned |
55.00 |
0.00 |
|
OAK C_7_UNIT 3 |
OAKLAND STATION C GT UNIT 3 |
Planned/Forced |
55.00 |
55.00 |
|
OLDRIV_6_BIOGAS |
Bidart Old River 1 |
Forced |
2.00 |
1.07 |
|
ORLND_6_SOLAR1 |
Enerparc California 2 |
Forced |
1.52 |
0.00 |
|
OXMTN_6_LNDFIL |
Ox Mountain Landfill Generating Plant |
Planned/Forced |
10.62 |
1.58 |
|
PEABDY_2_LNDFL1 |
Potrero Hills Energy Producers |
Forced |
8.00 |
0.00 |
|
PINFLT_7_UNITS |
PINE FLAT HYDRO AGGREGATE |
Planned |
210.00 |
138.00 |
|
PITTSP_7_UNIT 7 |
PITTSBURG UNIT 7 |
Planned |
530.00 |
130.00 |
|
PLSNTG_7_LNCLND |
Lincoln Landfill Power Plant |
Forced |
4.98 |
2.48 |
|
PNCHEG_2_PL1X4 |
PANOCHE ENERGY CENTER (Aggregated) |
Forced |
401.00 |
0.00 |
|
PNCHPP_1_PL1X2 |
Midway Peaking Aggregate |
Planned |
119.91 |
119.91 |
|
PNOCHE_1_UNITA1 |
CalPeak Power Panoche Unit 1 |
Forced |
52.01 |
4.01 |
|
RICHMN_7_BAYENV |
BAY ENVIRONMENTAL (NOVE POWER) |
Forced |
2.50 |
1.10 |
|
RUSCTY_2_UNITS |
Russell City Energy Center |
Forced |
620.00 |
0.00 |
|
SANTFG_7_UNITS |
GEYSERS CALISTOGA AGGREGATE |
Forced |
92.10 |
26.10 |
|
SBERDO_2_RTS011 |
SPVP011 |
Planned |
3.50 |
0.00 |
|
SBERDO_2_RTS013 |
SPVP013 |
Planned |
3.50 |
0.00 |
|
SBERDO_2_RTS016 |
SPVP016 Redlands RT Solar |
Planned |
1.50 |
0.00 |
|
SCEHOV_2_HOOVER |
SCEHOV_2_HOOVER |
Planned |
525.00 |
238.00 |
|
SCHLTE_1_PL1X3 |
Tracy Combined Cycle Power Plant |
Forced |
332.28 |
11.43 |
|
SIERRA_1_UNITS |
HIGH SIERRA LIMITED |
Forced |
52.43 |
1.43 |
|
SLUISP_2_UNITS |
SAN LUIS (GIANELLI) PUMP-GEN (AGGREGATE) |
Planned/Forced |
374.43 |
134.43 |
|
SMUDGO_7_UNIT 1 |
SONOMA POWER PLANT |
Forced |
53.00 |
15.00 |
|
SNMALF_6_UNITS |
Sonoma County Landfill |
Planned |
7.50 |
4.00 |
|
SPIAND_1_ANDSN2 |
SPI Anderson 2 |
Forced |
27.15 |
22.14 |
|
STOILS_1_UNITS |
Chevron Richmond Refinery |
Planned |
113.90 |
63.90 |
|
SUNRIS_2_PL1X3 |
Sunrise Power Project AGGREGATE II |
Planned |
586.02 |
586.02 |
|
SUNSET_2_UNITS |
MIDWAY SUNSET COGENERATION PLANT |
Planned/Forced |
248.00 |
99.00 |
|
SUTTER_2_PL1X3 |
SUTTER POWER PLANT AGGREGATE |
Forced |
525.00 |
525.00 |
|
TRNQLT_2_SOLAR |
Tranquillity |
Planned |
200.00 |
200.00 |
|
TUPMAN_1_BIOGAS |
ABEC Bidart-Stockale #1 |
Forced |
0.60 |
0.60 |
|
USWND2_1_WIND1 |
Golden Hills A |
Forced |
42.96 |
5.56 |
|
USWND2_1_WIND2 |
Golden Hills B |
Forced |
42.96 |
3.86 |
|
USWNDR_2_SMUD |
SOLANO WIND FARM |
Forced |
102.18 |
0.00 |
|
USWNDR_2_SMUD2 |
Solano Wind Project Phase 3 |
Forced |
127.80 |
0.00 |
|
VACADX_1_UNITA1 |
CalPeak Power Vaca Dixon Unit 1 |
Forced |
50.61 |
2.61 |
|
VISTA_2_RTS028 |
SPVP028 |
Planned |
3.50 |
0.00 |
|
VLYHOM_7_SSJID |
Woodward Power Plant |
Forced |
3.00 |
0.00 |
|
WDFRDF_2_UNITS |
WEST FORD FLAT AGGREGATE |
Forced |
32.60 |
32.60 |
|
WISHON_6_UNITS |
Wishon/San Joaquin #1-A AGGREGATE |
Forced |
18.40 |
4.20 |
|
WNDMAS_2_UNIT 1 |
BUENA VISTA ENERGY, LLC |
Forced |
38.00 |
0.00 |
|
WOLFSK_1_UNITA1 |
Wolfskill Energy Center, Unit #1 |
Planned |
46.90 |
46.90 |
|