Generator Interconnection: Cluster 14 Preliminary Project List Posted

MESSAGE

The California ISO has posted a spreadsheet containing a preliminary list of Interconnection Requests (IRs) being validated in Cluster 14 to the miscellaneous stakeholder meetings webpage at http://www.caiso.com/informed/Pages/MeetingsEvents/MiscellaneousStakeholderMeetings/Default.aspx.

 

The list of IRs is being provided to all stakeholders for their review in conjunction with the issue paper and draft final proposal for a revised study process and timeline for Cluster 14. Please note that this information is provided as general information of IRs being validated in the ISO Generator Interconnection Queue for Cluster 14. 

 

The information in the posted spreadsheet reflects project data prior to the completion of the Cluster 14 IR validation and scoping meeting processes and is a snapshot in time (as of May 20, 2021) that is subject to change. Megawatt values and Point of Interconnections contained in the spreadsheet reflect information provided in initial IR submittals that may be modified during IR validation or scoping meetings. IR withdrawals may also occur prior to the commencement of the Phase I Interconnection Study.


CONTACT INFORMATION

ISO Interconnection Resources at irinfo@caiso.com

Engage with us!
isoball twitterball RSSball Facebookball YouTube
Daily Briefing
Sign up
for
Daily Briefing
ISO Today
Download
ISO Today
Flex Alerts
Sign up
for
Flex Alerts

California Independent System Operator | P.O. Box 639014 | Folsom, CA 95630 | United States