ISO Logo
 
Market Notice
May 9, 2017

REQUESTED ACTION

Mark Your Calendar

CATEGORIES

Information Technology

Market Operations

Market Rules and Design

Market Simulation

Market Results Interface – Settlements (MRI-S) Metering Customer Partnership Group Call 5/11/17


SUMMARY

Today the ISO published a first draft of the Cutover Plan from Operational Meter Analysis and Reporting (OMAR) Online to the Market Results Interface – Settlements (MRI-S) Metering application.


MESSAGE

The ISO published today a first draft of the OMAR Online plan to cut-over the MRI-S meeting application, as referenced in the May 2, 2017 market notice. This plan specifies preparedness steps and addresses general timing aspects of the cut-over. The Draft OMAR Decommissioning External Cutover Plan is available on the ISO website at: http://www.caiso.com/Documents/OMARDecommissioningExternalCutoverPlan.pdf.

 

Call Details

Date: Thursday, May 11, 2017

Time: 10:00 a.m. to 11:00 a.m. (Pacific Time)

Add to calendar

 

Web Conference Details

Web Address (URL): http://ems7.intellor.com/login/711993

Audio connection instructions will be available after connecting to the web conference.

 

Telephone-Only Participation

Please only use this dial-in method if unable to participate by web to ensure the ability to participate in Q&A

Call-in: 877-369-5230, Access Code: 0480443#

 

Technical Support

Contact AT&T Connect Support at 1-888-796-6118


CONTACT INFORMATION

Michael Lucas at 916-351-2470 or mlucas@caiso.com

Engage with us!
isoball twitterball RSSball Facebookball YouTube
Daily Briefing
Sign up
for
Daily Briefing
ISO Today
Download
ISO Today
Flex Alerts
Sign up
for
Flex Alerts

California Independent System Operator | P.O. Box 639014 | Folsom, CA 95630 | United States