ISO Logo
 
Market Notice
July 6, 2017

REQUESTED ACTION

Information Only

CATEGORIES

Information Technology

Market Operations

Market Rules and Design

Market Simulation

Market Results Interface - Settlements (MRI-S) Metering Enhancements Production Released

SUMMARY

The California ISO has released the Market Results Interface - Settlements (MRI S) Metering Enhancements into both the market simulation and the production environments.

MESSAGE

The ISO released enhancements to the MRI-S Metering application into both the market simulation and the production environments today, July 6, 2017.  The dual-pronged release is in anticipation of the September 1, 2017 decommissioning of Operational Meter Analysis and Reporting (OMAR).

 

For entities that are already positioned to cut-over from OMAR to MRI-S, this production launch allows them the opportunity to proceed.  For entities that desire to continue their testing for a cut-over closer to the September 1, 2017 OMAR decommissioning, the market simulation release grants them the ability to test against now-current production code but within a non-production environment.

 

Finally, the production release also allows Access Identity Management (AIM) user access administrators the ability to provision third-party read-only access for both the market simulation and the production environments.


CONTACT INFORMATION

Michael Lucas at 916-351-2470 or mlucas@caiso.com

Engage with us!
isoball twitterball RSSball Facebookball YouTube
Daily Briefing
Sign up
for
Daily Briefing
ISO Today
Download
ISO Today
Flex Alerts
Sign up
for
Flex Alerts

California Independent System Operator | P.O. Box 639014 | Folsom, CA 95630 | United States