The ISO has revised the operating procedures referenced below.
1210 Day-Ahead Market, version 18.1, effective Jan. 17, 2019.
Section A.3.1.7.1, Step 1 and 2, updates for ETCC (Existing Transmission Contract Calculator) tool replacement.
8110B Interchange Scheduling Limits, version 10.6, effective Jan. 17, 2019.
Table 1: Updated value for ADLANTOVICTVL-SP_ITC.
Minor format changes.
ISO Operating Procedures - http://www.caiso.com/rules/Pages/OperatingProcedures/Default.aspx