Skip Ribbon Commands
Skip to main content
Sign In

 

  • Interconnection requirements review
    To maintain system reliability on an ongoing basis, changes are required to the ISO interconnection requirements to accommodate increasing amounts of variable generation. This initiative proposes modifications to the operating power factor, voltage control, disturbance ride through, and generation management parameters for asynchronous generators, such as wind and solar resources. These requirements will be incorporated in interconnection agreements, if approved by the Federal Energy Regulatory Commission (FERC), and will make the technical requirements for these variable generation technologies more consistent with those of conventional generators.
    • Interconnection requirements review - papers and proposals
    • Interconnection requirements review - tariff
    • ISO comments on FERC renewable notice of inquiry
    • Response to stakeholder comments
    • Comments on straw proposal
    • Comments on draft straw proposal
    • Comments on meeting presentation 19-Feb-2010
    • Comments on draft tariff language