AGUCAL_5_SOLAR1 |
Agua Caliente Solar |
Planned |
290.00 |
290.00 |
SDGE Gen |
ALAMIT_7_UNIT 2 |
ALAMITOS GEN STA. UNIT 2 |
Planned |
175.00 |
175.00 |
SCE Gen |
ALAMO_6_UNIT |
ALAMO POWER PLANT |
Forced |
17.00 |
17.00 |
SCE Gen |
ALHMBR_1_ALHSLR |
SG Alhambra |
Forced |
50.00 |
0.00 |
SDGE Gen |
ALTA3A_2_CPCE8 |
CPC East - Alta Wind 8 |
Planned |
150.00 |
0.00 |
SCE Gen |
ALTA4B_2_CPCW6 |
CPC West - Alta Wind 6 |
Planned |
150.00 |
0.00 |
SCE Gen |
ALTA6B_2_WIND11 |
Alta Wind 11 |
Forced |
90.00 |
0.00 |
SCE Gen |
ALTA6E_2_WIND10 |
Alta Wind 10 |
Forced |
138.00 |
0.00 |
SCE Gen |
ALTWD_1_QF |
Altwind |
Planned |
47.00 |
0.00 |
SCE Gen |
ANAHM_2_CANYN1 |
CANYON POWER PLANT UNIT 1 |
Forced |
49.40 |
0.00 |
SCE Gen |
ANAHM_2_CANYN2 |
CANYON POWER PLANT UNIT 2 |
Forced |
49.40 |
0.00 |
SCE Gen |
ANAHM_2_CANYN3 |
CANYON POWER PLANT UNIT 3 |
Forced |
49.40 |
0.00 |
SCE Gen |
ANAHM_2_CANYN4 |
CANYON POWER PLANT UNIT 4 |
Forced |
49.40 |
0.00 |
SCE Gen |
ANAHM_7_CT |
ANAHEIM COMBUSTION TURBINE |
Forced |
42.81 |
0.00 |
SCE Gen |
ARBWD_6_QF |
Wind Resource II |
Forced |
19.95 |
0.72 |
SCE Gen |
AVSOLR_2_SOLAR |
AV SOLAR RANCH 1 |
Planned |
241.50 |
35.10 |
SCE Gen |
BIGCRK_2_EXESWD |
BIG CREEK HYDRO PROJECT PSP |
Planned/Forced |
820.00 |
415.00 |
SCE Gen |
BISHOP_1_ALAMO |
BISHOP CREEK PLANT 2 AND 6 |
Forced |
13.40 |
8.40 |
SCE Gen |
BISHOP_1_UNITS |
BISHOP CREEK PLANT 3 AND 4 |
Planned/Forced |
15.80 |
10.80 |
SCE Gen |
BLAST_1_WIND |
Mountain View IV Wind |
Planned |
49.00 |
0.00 |
SCE Gen |
BLKCRK_2_SOLAR1 |
McCoy Station |
Planned/Forced |
250.00 |
11.00 |
SCE Gen |
BORDER_6_UNITA1 |
CalPeak Power Border Unit 1 |
Forced |
51.25 |
51.25 |
SDGE Gen |
BRDWAY_7_UNIT 3 |
BROADWAY UNIT 3 |
Forced |
65.00 |
65.00 |
SCE Gen |
BRODIE_2_WIND |
Coram Brodie Wind Project |
Planned/Forced |
102.00 |
24.00 |
SCE Gen |
BUCKWD_1_QF |
Buckwind Re-powering project |
Forced |
16.50 |
0.00 |
SCE Gen |
CARBOU_7_PL4X5 |
CARIBOU PH 2 UNIT 4 & 5 AGGREGATE |
Planned/Forced |
122.00 |
61.00 |
PGAE North |
CARBOU_7_UNIT 1 |
CARIBOU PH 1 UNIT 1 |
Planned |
24.00 |
24.00 |
PGAE North |
CCRITA_7_RPPCHF |
Rancho Penasquitos Hydro Facility |
Planned |
5.25 |
5.25 |
SDGE Gen |
CENTER_2_QF |
CENTER QFS |
Forced |
31.00 |
31.00 |
SCE Gen |
CHINO_7_MILIKN |
MN Milliken Genco LLC |
Planned |
1.90 |
1.90 |
SCE Gen |
COLGAT_7_UNIT 1 |
COLGATE HYDRO UNIT 1 |
Forced |
176.72 |
11.72 |
PGAE North |
COLGAT_7_UNIT 2 |
COLGATE HYDRO UNIT 2 |
Forced |
175.67 |
10.67 |
PGAE North |
COLUSA_2_PL1X3 |
Colusa Generating Station |
Forced |
641.00 |
33.90 |
PGAE North |
CROKET_7_UNIT |
CROCKETT COGEN |
Planned |
240.00 |
240.00 |
PGAE North |
CRSTWD_6_KUMYAY |
Kumeyaay Wind Farm |
Forced |
50.00 |
3.00 |
SDGE Gen |
CSLR4S_2_SOLAR |
Csolar IV South |
Forced |
130.00 |
25.84 |
SDGE Gen |
DSABLA_7_UNIT |
De Sabla Hydro |
Planned |
18.50 |
18.50 |
PGAE North |
DSRTSL_2_SOLAR1 |
Desert Stateline |
Planned |
299.99 |
112.99 |
SCE Gen |
DSRTSN_2_SOLAR1 |
Desert Sunlight 300 |
Planned |
300.00 |
300.00 |
SCE Gen |
DSRTSN_2_SOLAR2 |
Desert Sunlight 250 |
Planned |
250.00 |
250.00 |
SCE Gen |
DUTCH1_7_UNIT 1 |
DUTCH FLAT 1 PH |
Planned |
22.00 |
0.00 |
PGAE North |
DVLCYN_1_UNITS |
DEVIL CANYON HYDRO UNITS 1-4 AGGREGATE |
Planned |
236.80 |
0.00 |
SCE Gen |
ELECTR_7_PL1X3 |
ELECTRA PH UNIT 1 & 2 AGGREGATE |
Planned |
101.50 |
0.00 |
PGAE North |
ELSEGN_2_UN1011 |
El Segundo Energy Center 5/6 |
Forced |
263.00 |
0.00 |
SCE Gen |
ELSEGN_2_UN2021 |
El Segundo Energy Center 7/8 |
Forced |
263.68 |
0.00 |
SCE Gen |
ENCINA_7_EA5 |
ENCINA UNIT 5 |
Planned |
330.00 |
330.00 |
SDGE Gen |
ESCNDO_6_UNITB1 |
CalPeak Power Enterprise Unit 1 |
Forced |
48.04 |
0.04 |
SDGE Gen |
ETIWND_2_FONTNA |
FONTANALYTLE CREEK POWERHOUSE P |
Planned |
2.56 |
1.96 |
SCE Gen |
ETIWND_6_MWDETI |
ETIWANDA RECOVERY HYDRO |
Planned |
24.00 |
24.00 |
SCE Gen |
ETIWND_7_MIDVLY |
MN Mid Valley Genco LLC |
Planned |
2.10 |
0.30 |
SCE Gen |
FAIRHV_6_UNIT |
FAIRHAVEN POWER CO. |
Planned/Forced |
19.90 |
19.90 |
PGAE North |
FMEADO_6_HELLHL |
FMEADO_6_HELLHL |
Planned |
0.60 |
0.60 |
PGAE North |
GARNET_1_SOLAR2 |
Garnet Solar Power Generation Station 1 |
Forced |
4.00 |
0.50 |
SCE Gen |
GARNET_1_UNITS |
GARNET GREEN POWER PROJECT AGGREGATE |
Forced |
16.50 |
0.00 |
SCE Gen |
GARNET_1_WINDS |
Garnet Winds Aggregation |
Forced |
22.50 |
0.00 |
SCE Gen |
GARNET_2_WIND1 |
Phoenix |
Forced |
11.20 |
11.20 |
SCE Gen |
GARNET_2_WIND2 |
Karen Avenue Wind Farm |
Forced |
11.70 |
4.50 |
SCE Gen |
GARNET_2_WIND3 |
San Gorgonio East |
Planned |
12.60 |
0.00 |
SCE Gen |
GLNARM_7_UNIT 2 |
GLEN ARM UNIT 2 |
Forced |
22.30 |
22.30 |
SCE Gen |
GOLETA_6_EXGEN |
EXXON COMPANY USA |
Forced |
48.20 |
48.20 |
SCE Gen |
GRNLF1_1_UNITS |
GREENLEAF #1 COGEN AGGREGATE |
Planned |
49.20 |
49.20 |
PGAE North |
HAASPH_7_PL1X2 |
HAAS PH UNIT 1 & 2 AGGREGATE |
Forced |
144.00 |
72.00 |
PGAE North |
HARBGN_7_UNITS |
HARBOR COGEN COMBINED CYCLE |
Planned |
109.01 |
109.01 |
SCE Gen |
HIDSRT_2_UNITS |
HIGH DESERT POWER PROJECT AGGREGATE |
Forced |
830.00 |
118.00 |
SCE Gen |
HINSON_6_CARBGN |
BP WILMINGTON CALCINER |
Forced |
30.00 |
30.00 |
SCE Gen |
HUMBPP_6_UNITS |
Humboldt Bay Generating Station 1 |
Planned |
97.62 |
16.27 |
PGAE North |
INDIGO_1_UNIT 3 |
INDIGO PEAKER UNIT 3 |
Forced |
43.69 |
9.44 |
SCE Gen |
IVANPA_1_UNIT2 |
Ivanpah 2 |
Forced |
133.00 |
133.00 |
SCE Gen |
IVWEST_2_SOLAR1 |
Imperial Valley West ( Q # 608) |
Forced |
150.00 |
150.00 |
SDGE Gen |
JAWBNE_2_NSRWND |
North Sky River Wind Project |
Forced |
160.00 |
6.40 |
SCE Gen |
KERRGN_1_UNIT 1 |
KERN RIVER HYDRO UNITS 1-4 AGGREGATE |
Forced |
25.60 |
5.89 |
SCE Gen |
KNGBRD_2_SOLAR1 |
Kingbird Solar A |
Planned |
20.00 |
0.00 |
SCE Gen |
LARKSP_6_UNIT 1 |
LARKSPUR PEAKER UNIT 1 |
Forced |
46.10 |
0.10 |
SDGE Gen |
LARKSP_6_UNIT 2 |
LARKSPUR PEAKER UNIT 2 |
Forced |
47.98 |
2.98 |
SDGE Gen |
LAROA1_2_UNITA1 |
LR1 |
Forced |
180.00 |
15.00 |
SDGE Gen |
LAROA2_2_UNITA1 |
LR2 |
Forced |
322.00 |
7.00 |
SDGE Gen |
LEBECS_2_UNITS |
Pastoria Energy Facility |
Forced |
799.47 |
30.47 |
SCE Gen |
MANZNA_2_WIND |
Manzana Wind |
Planned/Forced |
189.00 |
0.00 |
SCE Gen |
MONLTH_6_BOREL |
BOREL HYDRO UNITS 1-3 AGGREGATE |
Forced |
11.00 |
11.00 |
SCE Gen |
MOORPK_6_QF |
MOORPARK QFS |
Forced |
34.80 |
0.00 |
SCE Gen |
MOORPK_7_UNITA1 |
WEME- Simi Valley Landfill |
Planned |
2.49 |
1.09 |
SCE Gen |
MRCHNT_2_PL1X3 |
Desert Star Energy Center |
Planned |
494.58 |
494.58 |
SCE Gen |
MSOLAR_2_SOLAR1 |
Mesquite Solar 1 |
Forced |
165.00 |
0.00 |
SCE Gen |
MTWIND_1_UNIT 1 |
Mountain View Power Project I |
Planned/Forced |
44.40 |
0.00 |
SCE Gen |
MTWIND_1_UNIT 2 |
Mountain View Power Project II |
Planned/Forced |
22.20 |
0.00 |
SCE Gen |
MTWIND_1_UNIT 3 |
Mountain View Power Project III |
Forced |
22.44 |
0.00 |
SCE Gen |
NGILAA_5_SDGDYN |
NGILAA_5_SDGDYN |
Forced |
57.00 |
3.00 |
SDGE Gen |
NZWIND_6_WDSTR4 |
Windstream 6042 |
Forced |
6.77 |
1.04 |
SCE Gen |
OMAR_2_UNIT 2 |
KERN RIVER COGENERATION CO. UNIT 2 |
Forced |
78.11 |
3.51 |
SCE Gen |
OMAR_2_UNIT 3 |
KERN RIVER COGENERATION CO. UNIT 3 |
Forced |
81.41 |
5.51 |
SCE Gen |
OTMESA_2_PL1X3 |
OTAY MESA ENERGY CENTER |
Planned |
603.68 |
603.68 |
SDGE Gen |
PACLUM_6_UNIT |
PACIFIC LUMBER (HUMBOLDT) |
Forced |
28.80 |
13.80 |
PGAE North |
PADUA_2_ONTARO |
ONTARIO/SIERRA HYDRO PSP |
Planned |
1.92 |
1.42 |
SCE Gen |
PANDOL_6_UNIT |
Covanta Delano, Inc. |
Planned |
49.00 |
49.00 |
SCE Gen |
PANSEA_1_PANARO |
Mesa Wind Project |
Planned/Forced |
30.00 |
22.39 |
SCE Gen |
PIT5_7_PL3X4 |
PIT PH 5 UNITS 3 & 4 AGGREGATE |
Forced |
82.00 |
41.00 |
PGAE North |
PIT7_7_UNIT 1 |
PIT PH 7 UNIT 1 |
Planned |
55.70 |
55.70 |
PGAE North |
PLAINV_6_SOLARC |
Central Antelope Dry Ranch C |
Planned/Forced |
20.00 |
1.00 |
SCE Gen |
POTTER_6_UNITS |
Potter Valley |
Planned |
10.10 |
10.10 |
PGAE North |
PRIMM_2_SOLAR1 |
Silver State South |
Planned |
250.00 |
60.00 |
SCE Gen |
PWEST_1_UNIT |
PACIFIC WEST 1 WIND GENERATION |
Forced |
2.10 |
2.10 |
SCE Gen |
RAMON_2_SCEDYN |
RAMON_2_SCEDYN |
Planned |
359.60 |
93.60 |
SCE Gen |
RENWD_1_QF |
Renwind re-powering project |
Forced |
10.00 |
0.00 |
SCE Gen |
ROSMDW_2_WIND1 |
Pacific Wind - Phase 1 |
Planned |
140.00 |
4.00 |
SCE Gen |
SALTSP_7_UNITS |
SALT SPRINGS HYDRO AGGREGATE |
Planned |
46.00 |
46.00 |
PGAE North |
SANWD_1_QF |
San Gorgonio Farms Wind Farm |
Planned |
31.00 |
1.70 |
SCE Gen |
SAUGUS_6_PTCHGN |
COUNTY OF LOS ANGELES -- PITCHLE |
Planned |
29.80 |
29.80 |
SCE Gen |
SAUGUS_7_CHIQCN |
Chiquita Canyon Landfill Fac |
Forced |
8.00 |
8.00 |
SCE Gen |
SAUGUS_7_LOPEZ |
MM Lopez Energy |
Planned |
6.10 |
3.60 |
SCE Gen |
SBERDO_2_PSP3 |
Mountainview Gen Sta. Unit 3 |
Planned |
525.00 |
525.00 |
SCE Gen |
SBERDO_2_PSP4 |
Mountainview Gen Sta. Unit 4 |
Planned |
525.00 |
525.00 |
SCE Gen |
SBERDO_2_SNTANA |
SANTA ANA PSP |
Planned |
6.95 |
5.45 |
SCE Gen |
SBERDO_6_MILLCK |
MILL CREEK PSP |
Planned |
3.93 |
0.00 |
SCE Gen |
SNORA_2_SNRSLR |
SG Sorrento |
Forced |
50.00 |
0.00 |
SDGE Gen |
SPAULD_6_UNIT12 |
SPAULDING HYDRO PH 1 & 2 AGGREGATE |
Planned |
11.40 |
11.40 |
PGAE North |
STNRES_1_UNIT |
Covanta Stanislaus |
Planned |
19.90 |
19.90 |
PGAE North |
SYCAMR_2_UNIT 1 |
Sycamore Cogeneration Unit 1 |
Planned/Forced |
85.00 |
8.10 |
SCE Gen |
SYCAMR_2_UNIT 2 |
Sycamore Cogeneration Unit 2 |
Forced |
85.00 |
10.60 |
SCE Gen |
SYCAMR_2_UNIT 3 |
Sycamore Cogeneration Unit 3 |
Forced |
85.00 |
8.83 |
SCE Gen |
SYCAMR_2_UNIT 4 |
Sycamore Cogeneration Unit 4 |
Forced |
85.00 |
10.02 |
SCE Gen |
TERMEX_2_PL1X3 |
TDM |
Forced |
625.00 |
14.00 |
SDGE Gen |
TIFFNY_1_DILLON |
TIFFNY_1_DILLON |
Forced |
45.00 |
2.00 |
SCE Gen |
TIGRCK_7_UNITS |
TIGER CREEK HYDRO AGGREGATE |
Planned |
62.00 |
62.00 |
PGAE North |
TOADTW_6_UNIT |
TOAD TOWN |
Planned |
1.50 |
1.50 |
PGAE North |
VALLEY_7_BADLND |
VALLEY_7_BADLND |
Forced |
1.30 |
0.30 |
SCE Gen |
VALLEY_7_UNITA1 |
WM Energy, El Sobrante Landfill |
Forced |
3.74 |
1.99 |
SCE Gen |
VERNON_6_GONZL1 |
H. Gonzales Unit #1 |
Planned |
5.75 |
5.75 |
SCE Gen |
VERNON_6_GONZL2 |
H. Gonzales Unit #2 |
Planned |
5.75 |
5.75 |
SCE Gen |
VESTAL_2_KERN |
KERN RIVER PH 3 UNITS 1 & 2 AGGREGATE |
Planned |
36.80 |
0.00 |
SCE Gen |
VICTOR_1_LVSLR2 |
Lone Valley Solar Park 2 |
Forced |
20.00 |
2.00 |
SCE Gen |
VINCNT_2_WESTWD |
Oasis Power Plant |
Planned |
60.00 |
7.00 |
SCE Gen |
WALCRK_2_CTG1 |
Walnut Creek Energy Park Unit 1 |
Planned |
96.43 |
0.00 |
SCE Gen |
WALCRK_2_CTG2 |
Walnut Creek Energy Park Unit 2 |
Planned |
96.91 |
0.00 |
SCE Gen |
WALCRK_2_CTG3 |
Walnut Creek Energy Park Unit 3 |
Forced |
96.65 |
0.00 |
SCE Gen |
WALCRK_2_CTG4 |
Walnut Creek Energy Park Unit 4 |
Forced |
96.49 |
0.00 |
SCE Gen |
WALCRK_2_CTG5 |
Walnut Creek Energy Park Unit 5 |
Forced |
96.65 |
0.00 |
SCE Gen |
WALNUT_6_HILLGEN |
L.A. COUNTY SANITATION DISTRICT |
Forced |
53.22 |
53.22 |
SCE Gen |
WALNUT_7_WCOVST |
WALNUT_7_WCOVST |
Planned |
6.50 |
6.50 |
SCE Gen |
WHTWTR_1_WINDA1 |
Whitewater Hill Wind Project |
Forced |
61.50 |
16.50 |
SCE Gen |
WNDSTR_2_WIND |
Windstar |
Planned |
120.00 |
0.00 |
SCE Gen |
7STDRD_1_SOLAR1 |
Shafter Solar |
Forced |
20.00 |
2.00 |
|
ADLIN_1_UNITS |
GEYSERS AIDLIN AGGREGATE |
Planned |
22.00 |
7.00 |
|
AGRICO_7_UNIT |
Fresno Cogen |
Planned |
50.60 |
50.60 |
|
BALCHS_7_UNIT 3 |
BALCH 2 PH UNIT 3 |
Planned |
54.60 |
54.60 |
|
BCTSYS_5_PWXDYN |
BCTSYS_5_PWXDYN |
Forced |
428.00 |
148.00 |
|
BDGRCK_1_UNITS |
BADGER CREEK LIMITED |
Forced |
47.49 |
3.49 |
|
BEARMT_1_UNIT |
Bear Mountain Limited |
Forced |
47.49 |
1.49 |
|
BELDEN_7_UNIT 1 |
BELDEN HYDRO |
Planned/Forced |
119.00 |
119.00 |
|
BNNIEN_7_ALTAPH |
ALTA POWER HOUSE |
Planned |
1.00 |
0.00 |
|
BRDSLD_2_HIWIND |
High Winds Energy Center |
Forced |
162.00 |
12.60 |
|
BRDSLD_2_SHILO1 |
Shiloh I Wind Project |
Forced |
150.00 |
6.00 |
|
BRDSLD_2_SHILO2 |
SHILOH WIND PROJECT 2 |
Planned |
150.00 |
0.00 |
|
BRDSLD_2_SHLO3A |
Shiloh III Wind Project, LLC |
Forced |
102.50 |
4.50 |
|
BRDSLD_2_SHLO3B |
Shiloh IV Wind Project |
Forced |
100.00 |
1.60 |
|
BUCKCK_7_OAKFLT |
Oak Flat |
Planned/Forced |
1.30 |
1.30 |
|
BUCKCK_7_PL1X2 |
BUCKS CREEK AGGREGATE |
Planned/Forced |
59.00 |
10.00 |
|
CALPIN_1_AGNEW |
Agnews Power Plant |
Planned |
28.00 |
28.00 |
|
CASTVL_2_FCELL |
PGE CSUEB Hayward Fuel Cell |
Forced |
1.40 |
1.40 |
|
CHALK_1_UNIT |
CHALK CLIFF LIMITED |
Forced |
47.49 |
2.59 |
|
CHWCHL_1_BIOMAS |
Chow II Biomass to Energy |
Planned |
10.80 |
1.30 |
|
CNTRVL_6_UNIT |
Centerville |
Forced |
6.40 |
6.40 |
|
COCOPP_2_CTG1 |
Marsh Landing 1 |
Planned/Forced |
204.20 |
6.67 |
|
COCOPP_2_CTG2 |
Marsh Landing 2 |
Planned/Forced |
202.70 |
6.00 |
|
COCOPP_2_CTG3 |
Marsh Landing 3 |
Planned/Forced |
208.96 |
12.68 |
|
COCOPP_2_CTG4 |
Marsh Landing 4 |
Forced |
204.29 |
6.17 |
|
COLPIN_6_COLLNS |
COLLINS PINE |
Forced |
13.80 |
13.80 |
|
CSTRVL_7_PL1X2 |
Marina Land Fill Gas |
Planned/Forced |
4.53 |
3.53 |
|
DALYCT_1_FCELL |
PGE San Francisco State Fuel Cell |
Forced |
1.60 |
1.40 |
|
DELTA_2_PL1X4 |
DELTA ENERGY CENTER AGGREGATE |
Forced |
880.00 |
41.00 |
|
DINUBA_6_UNIT |
DINUBA GENERATION PROJECT |
Forced |
12.00 |
12.00 |
|
DOUBLC_1_UNITS |
DOUBLE "C" LIMITED |
Forced |
52.23 |
2.13 |
|
DRACKR_2_SOLAR1 |
Dracker Solar Unit 1 |
Planned/Forced |
110.00 |
22.22 |
|
DUANE_1_PL1X3 |
DONALD VON RAESFELD POWER PROJECT |
Planned |
147.80 |
147.80 |
|
ELKCRK_6_STONYG |
STONEY GORGE HYDRO AGGREGATE |
Forced |
4.90 |
4.90 |
|
ELKHIL_2_PL1X3 |
ELK HILLS COMBINED CYCLE (AGGREGATE) |
Planned/Forced |
551.70 |
20.70 |
|
ELNIDP_6_BIOMAS |
El Nido Biomass to Energy |
Planned |
10.50 |
0.10 |
|
ELNIDS_2_DODPEV |
Los Angeles Air Force Base |
Forced |
0.50 |
0.40 |
|
ETIWND_2_UNIT1 |
New-Indy Ontario, LLC |
Forced |
33.60 |
25.60 |
|
EXCHEC_7_UNIT 1 |
EXCHEQUER HYDRO |
Forced |
94.50 |
21.50 |
|
FLOWD2_2_FPLWND |
DIABLO WINDS |
Forced |
18.60 |
0.00 |
|
GATWAY_2_PL1X3 |
GATEWAY GENERATING STATION |
Planned |
562.50 |
562.50 |
|
GEYS11_7_UNIT11 |
GEYSERS UNIT 11 (HEALDSBURG) |
Planned |
74.40 |
4.40 |
|
GEYS12_7_UNIT12 |
GEYSERS UNIT 12 (HEALDSBURG) |
Planned/Forced |
57.00 |
57.00 |
|
GEYS13_7_UNIT13 |
GEYSERS UNIT 13 (HEALDSBURG) |
Planned |
95.00 |
6.00 |
|
GEYS14_7_UNIT14 |
GEYSERS UNIT 14 (HEALDSBURG) |
Forced |
70.00 |
5.00 |
|
GEYS16_7_UNIT16 |
GEYSERS UNIT 16 (HEALDSBURG) |
Forced |
85.00 |
85.00 |
|
GEYS17_7_UNIT17 |
GEYSERS UNIT 17 (HEALDSBURG) |
Planned |
60.00 |
0.00 |
|
GEYS18_7_UNIT18 |
GEYSERS UNIT 18 (HEALDSBURG) |
Forced |
72.00 |
72.00 |
|
GEYS20_7_UNIT20 |
GEYSERS UNIT 20 (HEALDSBURG) |
Forced |
62.00 |
62.00 |
|
GILRPP_1_PL1X2 |
GILROY ENERGY CENTER UNITS 1&2 AGGREGATE |
Planned |
95.40 |
95.40 |
|
GONZLS_6_UNIT |
Johnson Canyon Landfill |
Planned |
1.42 |
0.00 |
|
GRIFFI_2_LSPDYN |
Griffith Energy |
Forced |
570.00 |
320.00 |
|
GRSCRK_6_BGCKWW |
BIG CREEK WATER WORKS - CEDAR FLAT |
Forced |
5.00 |
3.00 |
|
GWFPWR_1_UNITS |
HANFORD PEAKER PLANT |
Forced |
98.46 |
2.73 |
|
GYS5X6_7_UNITS |
GEYSERS UNITS 5 & 6 AGGREGATE |
Planned |
85.00 |
0.00 |
|
GYS7X8_7_UNITS |
GEYSERS UNITS 7 & 8 AGGREGATE |
Planned |
82.00 |
3.00 |
|
GYSRVL_7_WSPRNG |
Sonoma CWA Warm Springs Hydro |
Forced |
3.75 |
2.62 |
|
HATRDG_2_WIND |
Hatchet Ridge Wind Farm |
Forced |
102.00 |
0.80 |
|
HELMPG_7_UNIT 1 |
HELMS PUMP-GEN UNIT 1 |
Planned |
407.00 |
0.00 |
|
HELMPG_7_UNIT 2 |
HELMS PUMP-GEN UNIT 2 |
Forced |
407.00 |
0.00 |
|
HENRTA_6_UNITA1 |
GWF HENRIETTA PEAKER PLANT UNIT 1 |
Forced |
49.98 |
2.44 |
|
HENRTA_6_UNITA2 |
GWF HENRIETTA PEAKER PLANT UNIT 2 |
Forced |
49.42 |
1.98 |
|
HMLTBR_6_UNITS |
HAMILTON BRANCH PH (AGGREGATE) |
Planned |
4.90 |
2.30 |
|
HYTTHM_2_UNITS |
HYATT-THERMALITO PUMP-GEN (AGGREGATE) |
Planned/Forced |
933.10 |
343.10 |
|
INTKEP_2_UNITS |
CCSF Hetch_Hetchy Hydro Aggregate |
Forced |
405.00 |
27.00 |
|
INTMNT_3_ANAHEIM |
Intermountain Power Project |
Forced |
236.00 |
120.00 |
|
INTMNT_3_PASADENA |
Intermountain Power Project |
Forced |
107.00 |
54.00 |
|
INTMNT_3_RIVERSIDE |
IPPDYN |
Forced |
137.00 |
70.00 |
|
JAKVAL_6_UNITG1 |
BUENA VISTA |
Forced |
17.84 |
0.00 |
|
KELSO_2_UNITS |
Mariposa Energy |
Forced |
198.03 |
2.03 |
|
KERNFT_1_UNITS |
KERN FRONT LIMITED |
Forced |
52.40 |
1.80 |
|
KNGBRD_2_SOLAR2 |
Kingbird Solar B |
Planned/Forced |
20.00 |
2.00 |
|
KRNCNY_6_UNIT |
KERN CANYON |
Planned |
11.50 |
1.00 |
|
LAPAC_6_UNIT |
LOUISIANA PACIFIC SAMOA |
Forced |
20.00 |
20.00 |
|
LAPLMA_2_UNIT 1 |
La Paloma Generating Plant Unit #1 |
Forced |
259.80 |
6.80 |
|
LAPLMA_2_UNIT 2 |
La Paloma Generating Plant Unit #2 |
Forced |
260.20 |
260.20 |
|
LAPLMA_2_UNIT 3 |
La Paloma Generating Plant Unit #3 |
Forced |
256.15 |
0.15 |
|
LAPLMA_2_UNIT 4 |
LA PALOMA GENERATING PLANT, UNIT #4 |
Planned |
259.54 |
259.54 |
|
LASSEN_6_AGV1 |
AGV 1 |
Planned |
1.80 |
1.80 |
|
LECEF_1_UNITS |
LOS ESTEROS ENERGY FACILITY AGGREGATE |
Forced |
294.00 |
0.00 |
|
LHILLS_6_SOLAR1 |
Lost Hills Solar |
Forced |
20.00 |
20.00 |
|
LITLRK_6_SOLAR4 |
Little Rock Pham Solar |
Forced |
3.00 |
0.00 |
|
LIVEOK_6_SOLAR |
Harris |
Forced |
1.25 |
0.00 |
|
LIVOAK_1_UNIT 1 |
LIVE OAK LIMITED |
Forced |
47.49 |
1.99 |
|
LMEC_1_PL1X3 |
Los Medanos Energy Center AGGREGATE |
Forced |
561.29 |
0.00 |
|
LODI25_2_UNIT 1 |
LODI GAS TURBINE |
Planned |
25.30 |
25.30 |
|
LODIEC_2_PL1X2 |
Lodi Energy Center |
Forced |
302.58 |
17.48 |
|
MALAGA_1_PL1X2 |
Malaga Power Aggregate |
Forced |
96.00 |
3.99 |
|
METEC_2_PL1X3 |
Metcalf Energy Center |
Forced |
593.16 |
30.16 |
|
MKTRCK_1_UNIT 1 |
MCKITTRICK LIMITED |
Forced |
47.49 |
2.49 |
|
MONLTH_6_BATTRY |
Tehachapi Storage Project |
Forced |
8.00 |
0.00 |
|
MOSSLD_7_UNIT 7 |
MOSS LANDING UNIT 7 |
Forced |
755.00 |
15.00 |
|
MRLSDS_6_SOLAR1 |
Morelos Solar |
Forced |
15.00 |
2.50 |
|
MSTANG_2_SOLAR3 |
Mustang 3 |
Forced |
40.00 |
0.00 |
|
MSTANG_2_SOLAR4 |
Mustang 4 |
Planned/Forced |
30.00 |
30.00 |
|
MTNPOS_1_UNIT |
MT.POSO COGENERATION CO. |
Forced |
46.64 |
11.64 |
|
NCPA_7_GP2UN3 |
NCPA GEO PLANT 2 UNIT 3 |
Planned |
42.42 |
42.42 |
|
NCPA_7_GP2UN4 |
NCPA GEO PLANT 2 UNIT 4 |
Planned |
52.73 |
52.73 |
|
OAK C_7_UNIT 1 |
OAKLAND STATION C GT UNIT 1 |
Forced |
55.00 |
0.00 |
|
OAK C_7_UNIT 3 |
OAKLAND STATION C GT UNIT 3 |
Forced |
55.00 |
0.00 |
|
OASIS_6_SOLAR2 |
Oasis Solar |
Forced |
20.00 |
1.50 |
|
OLDRIV_6_BIOGAS |
Bidart Old River 1 |
Forced |
2.00 |
1.01 |
|
OXMTN_6_LNDFIL |
Ox Mountain Landfill Generating Plant |
Planned |
10.62 |
0.00 |
|
PINFLT_7_UNITS |
PINE FLAT HYDRO AGGREGATE |
Planned |
210.00 |
133.50 |
|
PITTSP_7_UNIT 7 |
PITTSBURG UNIT 7 |
Planned |
530.00 |
130.00 |
|
PNCHEG_2_PL1X4 |
PANOCHE ENERGY CENTER (Aggregated) |
Planned |
401.00 |
95.00 |
|
PNCHPP_1_PL1X2 |
Midway Peaking Aggregate |
Forced |
119.91 |
3.35 |
|
PNOCHE_1_UNITA1 |
CalPeak Power Panoche Unit 1 |
Forced |
52.01 |
4.01 |
|
PVERDE_5_SCEDYN |
PVERDE_5_SCEDYN |
Planned |
635.00 |
211.00 |
|
RICHMN_7_BAYENV |
BAY ENVIRONMENTAL (NOVE POWER) |
Forced |
2.50 |
2.00 |
|
RUSCTY_2_UNITS |
Russell City Energy Center |
Forced |
620.00 |
0.00 |
|
SANLOB_1_LNDFIL |
Cold Canyon |
Forced |
1.50 |
1.50 |
|
SANTFG_7_UNITS |
GEYSERS CALISTOGA AGGREGATE |
Planned |
92.10 |
23.10 |
|
SCEHOV_2_HOOVER |
SCEHOV_2_HOOVER |
Planned |
525.00 |
205.00 |
|
SCHLTE_1_PL1X3 |
Tracy Combined Cycle Power Plant |
Forced |
332.28 |
11.93 |
|
SIERRA_1_UNITS |
HIGH SIERRA LIMITED |
Forced |
52.43 |
2.33 |
|
SLUISP_2_UNITS |
SAN LUIS (GIANELLI) PUMP-GEN (AGGREGATE) |
Planned/Forced |
374.43 |
118.43 |
|
SMUDGO_7_UNIT 1 |
SONOMA POWER PLANT |
Forced |
53.00 |
15.00 |
|
SNCLRA_2_UNIT1 |
New Indy Oxnard |
Forced |
27.80 |
16.80 |
|
SNMALF_6_UNITS |
Sonoma County Landfill |
Planned |
7.50 |
3.50 |
|
SPIAND_1_ANDSN2 |
SPI Anderson 2 |
Forced |
27.15 |
27.15 |
|
SPICER_1_UNITS |
SPICER HYDRO UNITS 1-3 AGGREGATE |
Planned |
6.00 |
2.80 |
|
SUNRIS_2_PL1X3 |
Sunrise Power Project AGGREGATE II |
Forced |
586.02 |
20.02 |
|
SUNSET_2_UNITS |
MIDWAY SUNSET COGENERATION PLANT |
Forced |
248.00 |
18.00 |
|
SUNSHN_2_LNDFL |
Sunshine Gas Producers |
Forced |
20.00 |
6.00 |
|
SUTTER_2_PL1X3 |
SUTTER POWER PLANT AGGREGATE |
Forced |
525.00 |
525.00 |
|
TRNQLT_2_SOLAR |
Tranquillity |
Planned |
200.00 |
200.00 |
|
TUPMAN_1_BIOGAS |
ABEC Bidart-Stockale #1 |
Forced |
0.60 |
0.60 |
|
USWND2_1_WIND1 |
Golden Hills A |
Planned |
42.96 |
0.00 |
|
USWND2_1_WIND2 |
Golden Hills B |
Forced |
42.96 |
0.06 |
|
USWNDR_2_SMUD |
SOLANO WIND FARM |
Forced |
102.18 |
3.00 |
|
USWNDR_2_SMUD2 |
Solano Wind Project Phase 3 |
Forced |
127.80 |
0.00 |
|
VACADX_1_UNITA1 |
CalPeak Power Vaca Dixon Unit 1 |
Forced |
50.61 |
2.61 |
|
WDFRDF_2_UNITS |
WEST FORD FLAT AGGREGATE |
Forced |
32.60 |
32.60 |
|
WESTPT_2_UNIT |
West Point Hydro Plant |
Planned |
14.00 |
14.00 |
|
WNDMAS_2_UNIT 1 |
BUENA VISTA ENERGY, LLC |
Forced |
38.00 |
0.00 |
|