Resource ID |
Resource Name
|
Outage Type
|
Capacity (MW)
|
Curtailed (MW)
|
Zone Name
|
ALAMIT_7_UNIT 2 |
ALAMITOS GEN STA. UNIT 2 |
Planned |
175.00 |
175.00 |
SCE Gen |
ALTA3A_2_CPCE4 |
CPC East - Alta Wind 4 |
Forced |
102.00 |
0.00 |
SCE Gen |
ALTA3A_2_CPCE5 |
CPC East - Alta Wind 5 |
Forced |
168.00 |
0.00 |
SCE Gen |
ALTA3A_2_CPCE8 |
CPC East - Alta Wind 8 |
Forced |
150.00 |
9.00 |
SCE Gen |
ALTA4A_2_CPCW1 |
CPC West - Alta Wind 1 |
Forced |
150.00 |
0.00 |
SCE Gen |
ALTA4B_2_CPCW2 |
CPC West - Alta Wind II |
Forced |
150.00 |
0.00 |
SCE Gen |
ALTA4B_2_CPCW3 |
CPC West - Alta 3 |
Forced |
150.00 |
0.00 |
SCE Gen |
ALTA4B_2_CPCW6 |
CPC West - Alta Wind 6 |
Planned |
150.00 |
6.00 |
SCE Gen |
ALTA6B_2_WIND11 |
Alta Wind 11 |
Forced |
90.00 |
0.00 |
SCE Gen |
ALTA6E_2_WIND10 |
Alta Wind 10 |
Forced |
138.00 |
0.00 |
SCE Gen |
ALTWD_1_QF |
Altwind |
Planned |
47.00 |
0.00 |
SCE Gen |
ARBWD_6_QF |
Wind Resource II |
Forced |
19.95 |
3.37 |
SCE Gen |
ASTORA_2_SOLAR1 |
Astoria 1 |
Forced |
100.00 |
0.00 |
SCE Gen |
ASTORA_2_SOLAR2 |
Astoria 2 |
Planned/Forced |
75.00 |
19.69 |
SCE Gen |
BIGCRK_2_EXESWD |
BIG CREEK HYDRO PROJECT PSP |
Planned |
820.00 |
400.00 |
SCE Gen |
BIGSKY_2_SOLAR1 |
Antelope Big Sky Ranch |
Forced |
20.00 |
0.00 |
SCE Gen |
BIGSKY_2_SOLAR2 |
Big Sky Solar 4 |
Forced |
40.00 |
6.00 |
SCE Gen |
BIGSKY_2_SOLAR3 |
Big Sky Summer |
Forced |
20.00 |
2.00 |
SCE Gen |
BIGSKY_2_SOLAR4 |
Western Antelope Blue Sky Ranch B |
Planned/Forced |
20.00 |
15.00 |
SCE Gen |
BIGSKY_2_SOLAR5 |
Big Sky Solar 2 |
Planned/Forced |
5.00 |
0.00 |
SCE Gen |
BIGSKY_2_SOLAR6 |
Solverde 1 |
Forced |
85.00 |
85.00 |
SCE Gen |
BIOMAS_1_UNIT 1 |
WOODLAND BIOMASS |
Planned |
28.80 |
28.80 |
PGAE North |
BISHOP_1_ALAMO |
BISHOP CREEK PLANT 2 AND 6 |
Forced |
13.40 |
3.90 |
SCE Gen |
BISHOP_1_UNITS |
BISHOP CREEK PLANT 3 AND 4 |
Planned/Forced |
15.80 |
14.05 |
SCE Gen |
BLACK_7_UNIT 1 |
JAMES B. BLACK 1 |
Forced |
85.00 |
0.00 |
PGAE North |
BLAST_1_WIND |
Mountain View IV Wind |
Planned/Forced |
49.00 |
49.00 |
SCE Gen |
BLKCRK_2_SOLAR1 |
McCoy Station |
Forced |
250.00 |
0.00 |
SCE Gen |
BORDER_6_UNITA1 |
CalPeak Power Border Unit 1 |
Forced |
51.25 |
3.25 |
SDGE Gen |
BRDWAY_7_UNIT 3 |
BROADWAY UNIT 3 |
Forced |
65.00 |
0.00 |
SCE Gen |
BRODIE_2_WIND |
Coram Brodie Wind Project |
Forced |
102.00 |
0.00 |
SCE Gen |
BUCKWD_1_QF |
Buckwind Re-powering project |
Forced |
16.50 |
1.50 |
SCE Gen |
BUCKWD_7_WINTCV |
Wintec Energy, Ltd. |
Forced |
1.32 |
0.66 |
SCE Gen |
BUTTVL_7_UNIT 1 |
BUTT VALLEY HYDRO |
Planned |
39.50 |
39.50 |
PGAE North |
CAPWD_1_QF |
Edom Hills Wind Farm |
Planned |
19.55 |
2.05 |
SCE Gen |
CARBOU_7_PL4X5 |
CARIBOU PH 2 UNIT 4 & 5 AGGREGATE |
Forced |
120.00 |
2.00 |
PGAE North |
CENTER_6_PEAKER |
Center Peaker |
Planned |
47.00 |
47.00 |
SCE Gen |
CENTRY_6_PL1X4 |
CENTURY GENERATING PLANT (AGGREGATE) |
Planned |
41.40 |
14.40 |
SCE Gen |
CHEVMN_2_UNITS |
CHEVRON U.S.A. UNITS 1 & 2 AGGREGATE |
Forced |
124.87 |
124.87 |
SCE Gen |
CHINO_6_SMPPAP |
AltaGas Pomona Energy |
Forced |
44.00 |
44.00 |
SCE Gen |
CHINO_7_MILIKN |
MN Milliken Genco LLC |
Planned |
1.90 |
1.90 |
SCE Gen |
COLEMN_2_UNIT |
Coleman |
Forced |
13.00 |
7.00 |
PGAE North |
COLGAT_7_UNIT 1 |
Colgate Powerhouse Unit 1 |
Forced |
176.72 |
23.72 |
PGAE North |
COLGAT_7_UNIT 2 |
Colgate Powerhouse Unit 2 |
Planned/Forced |
175.67 |
175.67 |
PGAE North |
COLUSA_2_PL1X3 |
Colusa Generating Station |
Forced |
641.00 |
70.63 |
PGAE North |
CONTRL_1_LUNDY |
LUNDY |
Planned/Forced |
3.00 |
1.50 |
SCE Gen |
CONTRL_1_RUSHCK |
RUSH CREEK |
Planned |
11.94 |
5.50 |
SCE Gen |
COPMT2_2_SOLAR2 |
CMS2 |
Forced |
155.00 |
0.00 |
SCE Gen |
COPMT4_2_SOLAR4 |
Copper Mountain Solar 4 |
Forced |
92.00 |
0.00 |
SCE Gen |
CRELMN_6_RAMON1 |
Ramona 1 |
Forced |
2.00 |
0.00 |
SDGE Gen |
CRESTA_7_PL1X2 |
CRESTA PH UNIT 1 & 2 AGGREGATE |
Planned/Forced |
70.40 |
70.40 |
PGAE North |
CRSTWD_6_KUMYAY |
Kumeyaay Wind Farm |
Planned/Forced |
50.00 |
25.00 |
SDGE Gen |
DELAMO_2_SOLAR3 |
Golden Springs Building G |
Planned |
1.25 |
0.00 |
SCE Gen |
DELAMO_2_SOLAR4 |
Golden Springs Building F |
Planned |
1.30 |
0.00 |
SCE Gen |
DELAMO_2_SOLAR5 |
Golden Springs Building L |
Planned |
1.00 |
0.00 |
SCE Gen |
DELAMO_2_SOLAR6 |
Freeway Springs |
Planned |
2.00 |
0.00 |
SCE Gen |
DRACKR_2_SOLAR2 |
Dracker Solar Unit 2 |
Forced |
125.00 |
0.00 |
SCE Gen |
DRUM_7_UNIT 5 |
DRUM PH 2 UNIT 5 |
Planned |
50.00 |
50.00 |
PGAE North |
DSRTSL_2_SOLAR1 |
Desert Stateline |
Planned/Forced |
296.19 |
0.00 |
SCE Gen |
DVLCYN_1_UNITS |
DEVIL CANYON HYDRO UNITS 1-4 AGGREGATE |
Planned |
236.80 |
0.00 |
SCE Gen |
EASTWD_7_UNIT |
EASTWOOD PUMP-GEN |
Forced |
200.00 |
200.00 |
SCE Gen |
ELCAJN_6_UNITA1 |
Cuyamaca Peak Energy Plant |
Planned |
45.42 |
45.42 |
SDGE Gen |
ELDORO_7_UNIT 1 |
El Dorado Unit 1 |
Forced |
11.00 |
11.00 |
PGAE North |
ELDORO_7_UNIT 2 |
El Dorado Unit 2 |
Forced |
11.00 |
11.00 |
PGAE North |
ELECTR_7_PL1X3 |
ELECTRA PH UNIT 1 & 2 AGGREGATE |
Planned |
101.50 |
31.70 |
PGAE North |
ELNIDS_2_DODPEV |
Los Angeles Air Force Base |
Forced |
0.50 |
0.40 |
SCE Gen |
ELSEGN_2_UN1011 |
El Segundo Energy Center 5/6 |
Forced |
263.00 |
0.00 |
SCE Gen |
ELSEGN_2_UN2021 |
El Segundo Energy Center 7/8 |
Planned |
263.68 |
263.68 |
SCE Gen |
ESCNDO_6_PL1X2 |
MMC Escondido Aggregate |
Forced |
48.71 |
48.71 |
SDGE Gen |
ESCNDO_6_UNITB1 |
CalPeak Power Enterprise Unit 1 |
Planned |
48.04 |
48.04 |
SDGE Gen |
ESCO_6_GLMQF |
Goal Line Cogen |
Planned |
49.90 |
49.90 |
SDGE Gen |
ETIWND_2_FONTNA |
FONTANALYTLE CREEK POWERHOUSE P |
Planned |
2.56 |
1.81 |
SCE Gen |
ETIWND_2_SOLAR5 |
Dulles |
Forced |
2.00 |
0.00 |
SCE Gen |
ETIWND_2_UNIT1 |
New-Indy Ontario, LLC |
Planned/Forced |
33.60 |
25.60 |
SCE Gen |
ETIWND_6_GRPLND |
Grapeland Peaker |
Forced |
46.00 |
0.00 |
SCE Gen |
ETIWND_6_MWDETI |
ETIWANDA RECOVERY HYDRO |
Planned |
24.00 |
24.00 |
SCE Gen |
ETIWND_7_MIDVLY |
MN Mid Valley Genco LLC |
Planned |
2.10 |
0.80 |
SCE Gen |
GARNET_1_UNITS |
GARNET GREEN POWER PROJECT AGGREGATE |
Forced |
16.50 |
0.00 |
SCE Gen |
GARNET_1_WINDS |
Garnet Winds Aggregation |
Forced |
22.50 |
0.00 |
SCE Gen |
GARNET_2_HYDRO |
Whitewater Hydro |
Forced |
1.00 |
1.00 |
SCE Gen |
GARNET_2_WIND2 |
Karen Avenue Wind Farm |
Forced |
11.70 |
1.50 |
SCE Gen |
GARNET_2_WIND3 |
San Gorgonio East |
Planned |
12.60 |
0.00 |
SCE Gen |
GLNARM_7_UNIT 2 |
GLEN ARM UNIT 2 |
Forced |
22.30 |
22.30 |
SCE Gen |
GLNARM_7_UNIT 3 |
GLEN ARM UNIT 3 |
Forced |
44.83 |
0.00 |
SCE Gen |
GOLETA_6_EXGEN |
EXXON COMPANY USA |
Forced |
48.20 |
48.20 |
SCE Gen |
GRIFFI_2_LSPDYN |
Griffith Energy |
Forced |
570.00 |
370.00 |
SCE Gen |
GRNLF1_1_UNITS |
GREENLEAF #1 COGEN AGGREGATE |
Forced |
49.20 |
0.00 |
PGAE North |
HAASPH_7_PL1X2 |
HAAS PH UNIT 1 & 2 AGGREGATE |
Planned/Forced |
144.00 |
144.00 |
PGAE North |
HAASPH_7_PL1X2 |
HAAS PH UNIT 1 & 2 AGGREGATE |
Planned/Forced |
144.00 |
144.00 |
PGAE South |
HIDSRT_2_UNITS |
HIGH DESERT POWER PROJECT AGGREGATE |
Planned |
830.00 |
830.00 |
SCE Gen |
HUMBPP_1_UNITS3 |
Humboldt Bay Generating Station 3 |
Planned |
65.08 |
65.08 |
PGAE North |
INDIGO_1_UNIT 1 |
INDIGO PEAKER UNIT 1 |
Planned/Forced |
44.00 |
44.00 |
SCE Gen |
INDIGO_1_UNIT 2 |
INDIGO PEAKER UNIT 2 |
Planned/Forced |
44.53 |
44.53 |
SCE Gen |
INDIGO_1_UNIT 3 |
INDIGO PEAKER UNIT 3 |
Planned/Forced |
43.69 |
43.69 |
SCE Gen |
INLDEM_5_UNIT 1 |
Inland Empire Energy Center, Unit 1 |
Planned |
376.20 |
14.20 |
SCE Gen |
INLDEM_5_UNIT 2 |
Inland Empire Energy Center, Unit 2 |
Planned |
366.32 |
9.32 |
SCE Gen |
INTMNT_3_RIVERSIDE |
IPPDYN |
Forced |
137.00 |
1.00 |
SCE Gen |
JAWBNE_2_NSRWND |
North Sky River Wind Project |
Forced |
160.00 |
1.60 |
SCE Gen |
KERKH1_7_UNIT 1 |
KERKHOFF PH 1 UNIT #1 |
Planned/Forced |
13.00 |
13.00 |
PGAE North |
KERKH1_7_UNIT 3 |
KERKHOFF PH 1 UNIT #3 |
Planned/Forced |
12.80 |
12.80 |
PGAE North |
KERKH2_7_UNIT 1 |
KERKHOFF PH 2 UNIT #1 |
Planned |
153.90 |
153.90 |
PGAE North |
KERRGN_1_UNIT 1 |
KERN RIVER HYDRO UNITS 1-4 AGGREGATE |
Planned/Forced |
25.60 |
12.80 |
SCE Gen |
KILARC_2_UNIT 1 |
KILARC HYDRO |
Forced |
3.20 |
1.60 |
PGAE North |
LAKHDG_6_UNIT 1 |
Lake Hodges Pumped Storage-Unit1 |
Planned |
20.00 |
20.00 |
SDGE Gen |
LAKHDG_6_UNIT 2 |
Lake Hodges Pumped Storage-Unit2 |
Planned |
20.15 |
20.15 |
SDGE Gen |
LAMONT_1_SOLAR5 |
Redcrest Solar Farm |
Forced |
16.66 |
0.00 |
SCE Gen |
LARKSP_6_UNIT 1 |
LARKSPUR PEAKER UNIT 1 |
Forced |
46.10 |
2.10 |
SDGE Gen |
LARKSP_6_UNIT 2 |
LARKSPUR PEAKER UNIT 2 |
Forced |
47.98 |
4.98 |
SDGE Gen |
LAROA1_2_UNITA1 |
LR1 |
Forced |
180.00 |
15.00 |
SDGE Gen |
LAROA2_2_UNITA1 |
LR2 |
Forced |
322.00 |
17.00 |
SDGE Gen |
LASSEN_6_UNITS |
LASSEN AREA QF AGGREGATION |
Forced |
32.00 |
32.00 |
PGAE North |
LEBECS_2_UNITS |
Pastoria Energy Facility |
Planned |
799.47 |
0.00 |
SCE Gen |
MANZNA_2_WIND |
Manzana Wind |
Forced |
189.00 |
0.00 |
SCE Gen |
MDFKRL_2_PROJCT |
MIDDLE FORK AND RALSTON PSP |
Planned/Forced |
218.39 |
218.39 |
PGAE North |
MNDALY_7_UNIT 1 |
MANDALAY GEN STA. UNIT 1 |
Planned |
215.00 |
0.00 |
SCE Gen |
MOJAVW_2_SOLAR |
Mojave West |
Planned |
20.00 |
0.00 |
SCE Gen |
MONLTH_6_BOREL |
BOREL HYDRO UNITS 1-3 AGGREGATE |
Planned/Forced |
11.00 |
11.00 |
SCE Gen |
MRCHNT_2_PL1X3 |
Desert Star Energy Center |
Forced |
494.58 |
14.58 |
SCE Gen |
MSOLAR_2_SOLAR1 |
Mesquite Solar 1 |
Forced |
165.00 |
0.00 |
SCE Gen |
MSOLAR_2_SOLAR2 |
Mesquite Solar 2 |
Planned/Forced |
100.00 |
48.68 |
SDGE Gen |
MSOLAR_2_SOLAR3 |
Mesquite Solar 3, LLC |
Forced |
152.00 |
20.02 |
SDGE Gen |
MSSION_2_QF |
SMALL QF AGGREGATION - SAN DIEGO |
Forced |
50.00 |
0.00 |
SDGE Gen |
MTWIND_1_UNIT 1 |
Mountain View Power Project I |
Planned/Forced |
44.40 |
25.84 |
SCE Gen |
MTWIND_1_UNIT 2 |
Mountain View Power Project II |
Planned/Forced |
22.20 |
12.93 |
SCE Gen |
MTWIND_1_UNIT 3 |
Mountain View Power Project III |
Forced |
22.44 |
13.07 |
SCE Gen |
NAROW2_2_UNIT |
Narrows Powerhouse Unit 2 |
Forced |
55.00 |
42.90 |
PGAE North |
NGILAA_5_SDGDYN |
NGILAA_5_SDGDYN |
Planned |
57.00 |
57.00 |
SDGE Gen |
OCTILO_5_WIND |
Ocotillo Wind Energy Facility |
Forced |
265.00 |
23.00 |
SDGE Gen |
OGROVE_6_PL1X2 |
Orange Grove Energy Center |
Planned |
96.00 |
96.00 |
SDGE Gen |
OMAR_2_UNIT 1 |
KERN RIVER COGENERATION CO. UNIT 1 |
Forced |
78.00 |
2.20 |
SCE Gen |
OMAR_2_UNIT 2 |
KERN RIVER COGENERATION CO. UNIT 2 |
Forced |
78.11 |
0.31 |
SCE Gen |
OMAR_2_UNIT 3 |
KERN RIVER COGENERATION CO. UNIT 3 |
Forced |
81.41 |
2.31 |
SCE Gen |
OTMESA_2_PL1X3 |
OTAY MESA ENERGY CENTER |
Forced |
603.68 |
19.68 |
SDGE Gen |
PACLUM_6_UNIT |
PACIFIC LUMBER (HUMBOLDT) |
Forced |
28.80 |
9.80 |
PGAE North |
PADUA_2_ONTARO |
ONTARIO/SIERRA HYDRO PSP |
Planned |
1.92 |
1.17 |
SCE Gen |
PALOMR_2_PL1X3 |
Palomar Energy Center |
Planned |
575.00 |
300.00 |
SDGE Gen |
PANDOL_6_UNIT |
Covanta Delano, Inc. |
Planned |
49.00 |
49.00 |
SCE Gen |
PANSEA_1_PANARO |
Mesa Wind Project |
Planned |
30.00 |
21.55 |
SCE Gen |
PANSEA_1_PANARO |
Mesa Wind Project |
Planned |
30.00 |
21.55 |
SDGE Gen |
PIT1_7_UNIT 1 |
PIT PH 1 UNIT 1 |
Planned |
32.00 |
32.00 |
PGAE North |
PIT1_7_UNIT 2 |
PIT PH 1 UNIT 2 |
Planned |
32.00 |
32.00 |
PGAE North |
PIT4_7_PL1X2 |
PIT PH 4 UNITS 1 & 2 AGGREGATE |
Planned |
95.00 |
40.00 |
PGAE North |
PIT5_7_PL3X4 |
PIT PH 5 UNITS 3 & 4 AGGREGATE |
Planned |
82.00 |
82.00 |
PGAE North |
PIT7_7_UNIT 1 |
PIT PH 7 UNIT 1 |
Planned |
55.70 |
5.70 |
PGAE North |
PIT7_7_UNIT 2 |
PIT PH 7 UNIT 2 |
Forced |
54.60 |
4.60 |
PGAE North |
PLAINV_6_BSOLAR |
Western Antelope Blue Sky Ranch A |
Forced |
20.00 |
4.00 |
SCE Gen |
PLAINV_6_SOLAR3 |
Sierra Solar Greenworks LLC |
Forced |
20.00 |
0.00 |
SCE Gen |
PLAINV_6_SOLARC |
Central Antelope Dry Ranch C |
Forced |
20.00 |
0.00 |
SCE Gen |
POEPH_7_UNIT 2 |
POE HYDRO UNIT 2 |
Forced |
68.50 |
0.00 |
PGAE North |
PVERDE_5_SCEDYN |
PVERDE_5_SCEDYN |
Planned/Forced |
635.00 |
93.00 |
SCE Gen |
PWEST_1_UNIT |
PACIFIC WEST 1 WIND GENERATION |
Forced |
2.10 |
2.10 |
SCE Gen |
RAMON_2_SCEDYN |
RAMON_2_SCEDYN |
Planned |
359.60 |
173.60 |
SCE Gen |
RCKCRK_7_UNIT 1 |
ROCK CREEK HYDRO UNIT 1 |
Forced |
57.00 |
57.00 |
PGAE North |
RECTOR_2_KAWEAH |
KAWEAH PH 2 & 3 PSP AGGREGATE |
Forced |
6.55 |
0.00 |
SCE Gen |
RECTOR_2_KAWH 1 |
KAWEAH PH 1 UNIT 1 |
Forced |
2.25 |
0.00 |
SCE Gen |
RENWD_1_QF |
Renwind re-powering project |
Forced |
10.00 |
1.00 |
SCE Gen |
ROSMDW_2_WIND1 |
Pacific Wind - Phase 1 |
Planned |
140.00 |
6.00 |
SCE Gen |
RSMSLR_6_SOLAR1 |
Rosamond One |
Forced |
20.00 |
1.60 |
SCE Gen |
RTEDDY_2_SOLAR1 |
Rosamond West Solar 1 |
Forced |
55.00 |
23.30 |
SCE Gen |
RTEDDY_2_SOLAR2 |
Rosamond West Solar 2 |
Forced |
55.00 |
23.30 |
SCE Gen |
RTREE_2_WIND3 |
Rising Tree 3 |
Forced |
99.00 |
19.80 |
SCE Gen |
RVSIDE_6_RERCU1 |
Riverside Energy Res. Ctr Unit 1 |
Planned |
48.35 |
48.35 |
SCE Gen |
RVSIDE_6_RERCU2 |
Riverside Energy Res. Ctr Unit 2 |
Planned |
48.50 |
48.50 |
SCE Gen |
SANWD_1_QF |
San Gorgonio Farms Wind Farm |
Planned |
31.00 |
0.70 |
SCE Gen |
SAUGUS_2_TOLAND |
Toland Landfill gas to Energy Project |
Forced |
1.57 |
1.57 |
SCE Gen |
SAUGUS_7_LOPEZ |
MM Lopez Energy |
Planned |
6.10 |
4.09 |
SCE Gen |
SBERDO_2_PSP4 |
Mountainview Gen Sta. Unit 4 |
Planned |
525.00 |
525.00 |
SCE Gen |
SBERDO_2_SNTANA |
SANTA ANA PSP |
Planned |
6.95 |
6.65 |
SCE Gen |
SBERDO_6_MILLCK |
MILL CREEK PSP |
Planned |
3.93 |
2.43 |
SCE Gen |
SCEHOV_2_HOOVER |
SCEHOV_2_HOOVER |
Planned |
525.00 |
208.00 |
SCE Gen |
SLYCRK_1_UNIT 1 |
SLY CREEK HYDRO |
Forced |
13.00 |
0.65 |
PGAE North |
SNCLRA_2_UNIT1 |
New Indy Oxnard |
Forced |
27.80 |
16.80 |
SCE Gen |
SNDBAR_7_UNIT 1 |
SAND BAR HYDRO |
Planned |
18.60 |
18.60 |
PGAE North |
SPBURN_2_UNIT 1 |
Burney Biomass |
Planned |
22.00 |
0.00 |
PGAE North |
SPBURN_7_SNOWMT |
SPBURN_7_SNOWMT |
Planned |
3.00 |
0.00 |
PGAE North |
SPRGAP_1_UNIT 1 |
SPRING GAP HYDRO |
Forced |
7.00 |
7.00 |
PGAE North |
SPRGVL_2_TULE |
TULE RIVER HYDRO PLANT (PG&E) |
Planned |
6.40 |
6.40 |
SCE Gen |
SPRGVL_2_TULESC |
TULE RIVER HYDRO PLANT (SCE) |
Forced |
2.50 |
0.00 |
SCE Gen |
STANIS_7_UNIT 1 |
STANISLAUS HYDRO |
Planned |
91.00 |
91.00 |
PGAE North |
SUNSHN_2_LNDFL |
Sunshine Gas Producers |
Forced |
20.00 |
2.00 |
SCE Gen |
SYCAMR_2_UNIT 1 |
Sycamore Cogeneration Unit 1 |
Forced |
85.00 |
3.18 |
SCE Gen |
SYCAMR_2_UNIT 2 |
Sycamore Cogeneration Unit 2 |
Forced |
85.00 |
4.92 |
SCE Gen |
SYCAMR_2_UNIT 3 |
Sycamore Cogeneration Unit 3 |
Forced |
85.00 |
2.51 |
SCE Gen |
SYCAMR_2_UNIT 4 |
Sycamore Cogeneration Unit 4 |
Forced |
85.00 |
4.29 |
SCE Gen |
TEHAPI_2_WIND1 |
Wind Wall Monolith 1 |
Planned |
14.89 |
4.31 |
SCE Gen |
TEHAPI_2_WIND2 |
Wind Wall Monolith 2 |
Planned |
21.24 |
5.04 |
SCE Gen |
TENGEN_2_PL1X2 |
Berry Cogen 42 |
Planned |
40.20 |
22.70 |
SCE Gen |
TERMEX_2_PL1X3 |
TDM |
Forced |
625.00 |
8.00 |
SDGE Gen |
TIFFNY_1_DILLON |
TIFFNY_1_DILLON |
Forced |
45.00 |
26.20 |
SCE Gen |
ULTPCH_1_UNIT 1 |
OGDEN POWER PACIFIC (CHINESE STATION) |
Planned |
22.00 |
22.00 |
PGAE North |
VALLEY_7_BADLND |
VALLEY_7_BADLND |
Forced |
1.30 |
0.00 |
SCE Gen |
VERNON_6_GONZL1 |
H. Gonzales Unit #1 |
Forced |
5.75 |
5.75 |
SCE Gen |
VERNON_6_GONZL2 |
H. Gonzales Unit #2 |
Forced |
5.75 |
5.75 |
SCE Gen |
VESTAL_2_KERN |
KERN RIVER PH 3 UNITS 1 & 2 AGGREGATE |
Forced |
36.80 |
19.70 |
SCE Gen |
VICTOR_1_LVSLR2 |
Lone Valley Solar Park 2 |
Forced |
20.00 |
2.00 |
SCE Gen |
VINCNT_2_WESTWD |
Oasis Power Plant |
Planned |
60.00 |
7.00 |
SCE Gen |
VLCNTR_6_VCSLR |
Cole Grade |
Forced |
2.33 |
2.33 |
SDGE Gen |
VLCNTR_6_VCSLR1 |
Valley Center 1 |
Forced |
2.50 |
2.50 |
SDGE Gen |
VLCNTR_6_VCSLR2 |
Valley Center 2 |
Forced |
5.00 |
5.00 |
SDGE Gen |
WALCRK_2_CTG1 |
Walnut Creek Energy Park Unit 1 |
Planned |
96.43 |
16.43 |
SCE Gen |
WALCRK_2_CTG2 |
Walnut Creek Energy Park Unit 2 |
Planned |
96.91 |
16.91 |
SCE Gen |
WALCRK_2_CTG3 |
Walnut Creek Energy Park Unit 3 |
Planned |
96.65 |
16.65 |
SCE Gen |
WALCRK_2_CTG4 |
Walnut Creek Energy Park Unit 4 |
Planned |
96.49 |
16.49 |
SCE Gen |
WALCRK_2_CTG5 |
Walnut Creek Energy Park Unit 5 |
Planned |
96.65 |
16.65 |
SCE Gen |
WISE_1_UNIT 2 |
WISE HYDRO UNIT 2 |
Planned |
3.20 |
3.20 |
PGAE North |
WNDSTR_2_WIND |
Windstar |
Planned |
120.00 |
4.00 |
SCE Gen |
WSENGY_1_UNIT 1 |
WHEELABRATOR SHASTA UNITS 1-3 AGGREGATE |
Planned |
63.00 |
0.00 |
PGAE North |
YUBACT_1_SUNSWT |
YUBA CITY COGEN |
Planned |
49.97 |
49.97 |
PGAE North |
ADERA_1_SOLAR1 |
Adera Solar |
Forced |
20.00 |
0.00 |
|
ADLIN_1_UNITS |
GEYSERS AIDLIN AGGREGATE |
Forced |
22.00 |
7.00 |
|
ADMEST_6_SOLAR |
Adams East |
Forced |
19.00 |
1.50 |
|
ALMEGT_1_UNIT 1 |
ALAMEDA GT UNIT 1 |
Forced |
23.80 |
0.99 |
|
ARLINT_5_SCEDYN |
Arlington Valley CC |
Forced |
565.00 |
315.00 |
|
BCTSYS_5_PWXDYN |
BCTSYS_5_PWXDYN |
Forced |
428.00 |
128.00 |
|
BDGRCK_1_UNITS |
BADGER CREEK LIMITED |
Forced |
47.49 |
4.99 |
|
BEARDS_7_UNIT 1 |
Beardsley Hydro |
Planned |
11.50 |
11.50 |
|
BEARMT_1_UNIT |
Bear Mountain Limited |
Forced |
47.49 |
2.49 |
|
BELDEN_7_UNIT 1 |
BELDEN HYDRO |
Planned/Forced |
119.00 |
119.00 |
|
BLCKBT_2_STONEY |
BLACK BUTTE HYDRO |
Forced |
6.20 |
6.20 |
|
BLULKE_6_BLUELK |
Blue Lake Power |
Forced |
12.00 |
12.00 |
|
BNNIEN_7_ALTAPH |
ALTA POWER HOUSE |
Planned |
1.00 |
0.00 |
|
BRDSLD_2_HIWIND |
High Winds Energy Center |
Forced |
162.00 |
3.60 |
|
BRDSLD_2_MTZUM2 |
NextEra Energy Montezuma Wind II |
Forced |
78.20 |
0.00 |
|
BRDSLD_2_MTZUMA |
FPL Energy Montezuma Wind |
Forced |
36.80 |
2.30 |
|
BRDSLD_2_SHILO1 |
Shiloh I Wind Project |
Forced |
150.00 |
3.00 |
|
BRDSLD_2_SHILO2 |
SHILOH WIND PROJECT 2 |
Planned/Forced |
150.00 |
2.00 |
|
BRDSLD_2_SHLO3A |
Shiloh III Wind Project, LLC |
Forced |
102.50 |
6.50 |
|
BRDSLD_2_SHLO3B |
Shiloh IV Wind Project |
Forced |
100.00 |
92.00 |
|
BUCKCK_7_PL1X2 |
BUCKS CREEK AGGREGATE |
Planned |
59.00 |
25.00 |
|
CALFTN_2_SOLAR |
California Flats North |
Forced |
130.00 |
130.00 |
|
CALPIN_1_AGNEW |
Agnews Power Plant |
Forced |
28.00 |
7.30 |
|
CAMPFW_7_FARWST |
CAMP FAR WEST HYDRO |
Planned |
8.00 |
8.00 |
|
CASTVL_2_FCELL |
PGE CSUEB Hayward Fuel Cell |
Forced |
1.40 |
1.40 |
|
CHALK_1_UNIT |
CHALK CLIFF LIMITED |
Forced |
47.49 |
1.69 |
|
CHEVCD_6_UNIT |
CHEVRON USA (TAFT/CADET) |
Forced |
11.50 |
0.00 |
|
CHEVCO_6_UNIT 1 |
CHEVRON USA (COALINGA) |
Forced |
19.00 |
0.00 |
|
CHWCHL_1_BIOMAS |
Chow II Biomass to Energy |
Planned |
10.80 |
10.80 |
|
CLOVER_2_UNIT |
Clover Creek |
Forced |
0.99 |
0.99 |
|
CLRKRD_6_LIMESD |
Lime Saddle Hydro |
Forced |
2.00 |
2.00 |
|
CNTRVL_6_UNIT |
Centerville |
Forced |
6.40 |
6.40 |
|
COCOPP_2_CTG1 |
Marsh Landing 1 |
Forced |
204.20 |
3.60 |
|
COCOPP_2_CTG2 |
Marsh Landing 2 |
Forced |
202.70 |
3.00 |
|
COCOPP_2_CTG3 |
Marsh Landing 3 |
Forced |
208.96 |
9.66 |
|
COCOPP_2_CTG4 |
Marsh Landing 4 |
Forced |
204.29 |
3.09 |
|
COLVIL_7_PL1X2 |
COLLIERVILLE HYDRO UNIT 1 & 2 AGGREGATE |
Planned |
246.86 |
120.36 |
|
CONTAN_1_UNIT |
Graphic Packaging Cogen |
Planned |
27.70 |
0.00 |
|
COTTLE_2_FRNKNH |
Frankenheimer Power Plant |
Forced |
5.30 |
0.00 |
|
CRNEVL_6_SJQN 3 |
SAN JOAQUIN 3 |
Forced |
4.20 |
4.20 |
|
CSTRVL_7_PL1X2 |
Marina Land Fill Gas |
Planned |
4.53 |
2.13 |
|
DALYCT_1_FCELL |
PGE San Francisco State Fuel Cell |
Forced |
1.60 |
1.40 |
|
DELTA_2_PL1X4 |
DELTA ENERGY CENTER AGGREGATE |
Forced |
880.00 |
38.00 |
|
DINUBA_6_UNIT |
DINUBA GENERATION PROJECT |
Forced |
12.00 |
12.00 |
|
DISCOV_1_CHEVRN |
CHEVRON USA (EASTRIDGE) |
Forced |
56.20 |
34.20 |
|
DONNLS_7_UNIT |
Donnells Hydro |
Planned |
72.00 |
72.00 |
|
DOUBLC_1_UNITS |
DOUBLE "C" LIMITED |
Forced |
52.23 |
4.23 |
|
ELKCRK_6_STONYG |
STONEY GORGE HYDRO AGGREGATE |
Forced |
4.90 |
4.90 |
|
ELKHIL_2_PL1X3 |
ELK HILLS COMBINED CYCLE (AGGREGATE) |
Planned |
551.70 |
38.70 |
|
ELNIDP_6_BIOMAS |
El Nido Biomass to Energy |
Planned/Forced |
10.50 |
10.50 |
|
EXCHEC_7_UNIT 1 |
EXCHEQUER HYDRO |
Planned |
94.50 |
94.50 |
|
FRIANT_6_UNITS |
FRIANT DAM |
Forced |
25.00 |
0.00 |
|
FROGTN_7_UTICA |
FROGTN_7_UTICA |
Planned |
6.20 |
6.20 |
|
GATWAY_2_PL1X3 |
GATEWAY GENERATING STATION |
Planned/Forced |
562.50 |
562.50 |
|
GEYS11_7_UNIT11 |
GEYSERS UNIT 11 (HEALDSBURG) |
Forced |
74.40 |
4.40 |
|
GEYS12_7_UNIT12 |
GEYSERS UNIT 12 (HEALDSBURG) |
Planned |
57.00 |
5.00 |
|
GEYS13_7_UNIT13 |
GEYSERS UNIT 13 (HEALDSBURG) |
Planned |
95.00 |
36.00 |
|
GEYS14_7_UNIT14 |
GEYSERS UNIT 14 (HEALDSBURG) |
Planned |
70.00 |
11.00 |
|
GEYS16_7_UNIT16 |
GEYSERS UNIT 16 (HEALDSBURG) |
Forced |
85.00 |
42.00 |
|
GEYS17_7_UNIT17 |
GEYSERS UNIT 17 (HEALDSBURG) |
Forced |
60.00 |
3.00 |
|
GEYS18_7_UNIT18 |
GEYSERS UNIT 18 (HEALDSBURG) |
Forced |
72.00 |
35.00 |
|
GEYS20_7_UNIT20 |
GEYSERS UNIT 20 (HEALDSBURG) |
Forced |
62.00 |
23.00 |
|
GILROY_1_UNIT |
GILROY COGEN AGGREGATE |
Planned |
120.00 |
0.00 |
|
GRNVLY_7_SCLAND |
SANTA CRUZ LANDFILL GENERATING PLANT |
Planned |
3.04 |
0.00 |
|
GRSCRK_6_BGCKWW |
BIG CREEK WATER WORKS - CEDAR FLAT |
Forced |
5.00 |
5.00 |
|
GRZZLY_1_BERKLY |
PE - BERKELEY, INC. |
Planned |
32.50 |
32.50 |
|
GWFPWR_1_UNITS |
HANFORD PEAKER PLANT |
Forced |
98.46 |
1.11 |
|
GYS5X6_7_UNITS |
GEYSERS UNITS 5 & 6 AGGREGATE |
Forced |
85.00 |
0.00 |
|
GYS7X8_7_UNITS |
GEYSERS UNITS 7 & 8 AGGREGATE |
Forced |
82.00 |
4.00 |
|
GYSRVL_7_WSPRNG |
Sonoma CWA Warm Springs Hydro |
Forced |
3.75 |
2.58 |
|
HALSEY_6_UNIT |
HALSEY HYDRO |
Planned |
13.50 |
13.50 |
|
HATRDG_2_WIND |
Hatchet Ridge Wind Farm |
Forced |
102.00 |
22.00 |
|
HELMPG_7_UNIT 1 |
HELMS PUMP-GEN UNIT 1 |
Planned |
407.00 |
0.00 |
|
HELMPG_7_UNIT 2 |
HELMS PUMP-GEN UNIT 2 |
Planned |
407.00 |
0.00 |
|
HELMPG_7_UNIT 3 |
HELMS PUMP-GEN UNIT 3 |
Planned |
404.00 |
0.00 |
|
HENRTA_6_UNITA1 |
GWF HENRIETTA PEAKER PLANT UNIT 1 |
Forced |
49.98 |
1.63 |
|
HENRTA_6_UNITA2 |
GWF HENRIETTA PEAKER PLANT UNIT 2 |
Forced |
49.42 |
1.18 |
|
HMLTBR_6_UNITS |
HAMILTON BRANCH PH (AGGREGATE) |
Planned |
4.90 |
4.90 |
|
HURON_6_SOLAR |
Huron Solar Station |
Forced |
20.00 |
0.00 |
|
HYTTHM_2_UNITS |
HYATT-THERMALITO PUMP-GEN (AGGREGATE) |
Planned |
933.10 |
629.10 |
|
INTKEP_2_UNITS |
CCSF Hetch_Hetchy Hydro Aggregate |
Planned/Forced |
405.00 |
115.00 |
|
JAKVAL_6_UNITG1 |
BUENA VISTA |
Forced |
|
|
|
KELSO_2_UNITS |
Mariposa Energy |
Forced |
198.03 |
1.10 |
|
KERNFT_1_UNITS |
KERN FRONT LIMITED |
Forced |
52.40 |
4.40 |
|
KERNRG_1_UNITS |
South Belridge Cogen Facility |
Forced |
55.20 |
0.00 |
|
KINGCO_1_KINGBR |
Kingsburg Cogen |
Planned |
34.50 |
34.50 |
|
KNTSTH_6_SOLAR |
Kent South |
Planned/Forced |
20.00 |
0.00 |
|
KRNCNY_6_UNIT |
KERN CANYON |
Planned/Forced |
11.50 |
11.50 |
|
LAMONT_1_SOLAR1 |
Regulus Solar |
Forced |
60.00 |
15.00 |
|
LAMONT_1_SOLAR3 |
Woodmere Solar Farm |
Forced |
14.99 |
0.00 |
|
LAMONT_1_SOLAR4 |
Hayworth Solar Farm |
Forced |
26.66 |
0.00 |
|
LAPAC_6_UNIT |
LOUISIANA PACIFIC SAMOA |
Forced |
20.00 |
20.00 |
|
LAPLMA_2_UNIT 1 |
La Paloma Generating Plant Unit #1 |
Forced |
259.80 |
0.00 |
|
LAPLMA_2_UNIT 2 |
La Paloma Generating Plant Unit #2 |
Planned |
260.20 |
260.20 |
|
LAPLMA_2_UNIT 3 |
La Paloma Generating Plant Unit #3 |
Forced |
256.15 |
4.15 |
|
LAPLMA_2_UNIT 4 |
LA PALOMA GENERATING PLANT, UNIT #4 |
Forced |
259.54 |
9.54 |
|
LECEF_1_UNITS |
LOS ESTEROS ENERGY FACILITY AGGREGATE |
Forced |
306.00 |
3.20 |
|
LEPRFD_1_KANSAS |
Kansas |
Forced |
20.00 |
0.00 |
|
LIVOAK_1_UNIT 1 |
LIVE OAK LIMITED |
Forced |
47.49 |
4.09 |
|
LMEC_1_PL1X3 |
Los Medanos Energy Center AGGREGATE |
Planned/Forced |
561.29 |
297.29 |
|
LODIEC_2_PL1X2 |
Lodi Energy Center |
Forced |
302.58 |
13.98 |
|
MALAGA_1_PL1X2 |
Malaga Power Aggregate |
Planned |
96.00 |
96.00 |
|
METEC_2_PL1X3 |
Metcalf Energy Center |
Planned |
593.16 |
593.16 |
|
MKTRCK_1_UNIT 1 |
MCKITTRICK LIMITED |
Forced |
47.49 |
2.99 |
|
MOSSLD_2_PSP1 |
MOSS LANDING POWER BLOCK 1 |
Forced |
510.00 |
20.00 |
|
MOSSLD_2_PSP2 |
MOSS LANDING POWER BLOCK 2 |
Forced |
510.00 |
18.00 |
|
MOSSLD_7_UNIT 7 |
MOSS LANDING UNIT 7 |
Forced |
755.00 |
0.00 |
|
MTNPOS_1_UNIT |
MT.POSO COGENERATION CO. |
Forced |
46.64 |
4.64 |
|
MURRAY_6_UNIT |
Grossmont Hospital |
Forced |
4.12 |
0.00 |
|
NCPA_7_GP2UN3 |
NCPA GEO PLANT 2 UNIT 3 |
Planned |
42.42 |
42.42 |
|
NWCSTL_7_UNIT 1 |
NEWCASTLE HYDRO |
Planned |
12.00 |
12.00 |
|
OAK C_7_UNIT 1 |
OAKLAND STATION C GT UNIT 1 |
Forced |
55.00 |
1.50 |
|
OAK C_7_UNIT 3 |
OAKLAND STATION C GT UNIT 3 |
Forced |
55.00 |
1.00 |
|
OILFLD_7_QFUNTS |
Nacimiento Hydroelectric Plant |
Planned |
3.80 |
3.66 |
|
PARDEB_6_UNITS |
Pardee Power House |
Planned |
30.00 |
10.00 |
|
PGEB_2_PDRP01 |
PDR-B PGEB |
Forced |
0.90 |
0.90 |
|
PGEB_2_PDRP03 |
PDR-A PGEB |
Planned |
0.46 |
0.46 |
|
PGF1_2_PDRP02 |
PDR-D PGF1 LEDF |
Forced |
1.50 |
1.50 |
|
PGSA_2_PDRP02 |
PDR-D PGSA |
Forced |
1.60 |
1.60 |
|
PGSB_1_PDRP07 |
PDR-B PGSB |
Forced |
0.18 |
0.18 |
|
PINFLT_7_UNITS |
PINE FLAT HYDRO AGGREGATE |
Planned |
210.00 |
210.00 |
|
PITTSP_7_UNIT 5 |
PITTSBURG UNIT 5 |
Forced |
312.00 |
0.00 |
|
PITTSP_7_UNIT 7 |
PITTSBURG UNIT 7 |
Planned |
530.00 |
130.00 |
|
PNCHEG_2_PL1X4 |
PANOCHE ENERGY CENTER (Aggregated) |
Planned |
401.00 |
198.00 |
|
PNCHPP_1_PL1X2 |
Midway Peaking Aggregate |
Forced |
119.91 |
0.51 |
|
PNOCHE_1_UNITA1 |
CalPeak Power Panoche Unit 1 |
Forced |
52.01 |
4.01 |
|
RICHMN_7_BAYENV |
BAY ENVIRONMENTAL (NOVE POWER) |
Forced |
2.50 |
1.40 |
|
RUSCTY_2_UNITS |
Russell City Energy Center |
Forced |
620.00 |
0.00 |
|
SANTFG_7_UNITS |
GEYSERS CALISTOGA AGGREGATE |
Forced |
92.10 |
23.10 |
|
SCHD_1_PDRP01 |
PDR-F SCHD |
Forced |
1.08 |
1.08 |
|
SCHLTE_1_PL1X3 |
Tracy Combined Cycle Power Plant |
Planned |
332.28 |
332.28 |
|
SIERRA_1_UNITS |
HIGH SIERRA LIMITED |
Forced |
52.43 |
4.43 |
|
SLUISP_2_UNITS |
SAN LUIS (GIANELLI) PUMP-GEN (AGGREGATE) |
Planned/Forced |
374.43 |
80.43 |
|
SMUDGO_7_UNIT 1 |
SONOMA POWER PLANT |
Planned |
53.00 |
53.00 |
|
STOILS_1_UNITS |
Chevron Richmond Refinery |
Forced |
113.90 |
13.90 |
|
SUNRIS_2_PL1X3 |
Sunrise Power Project AGGREGATE II |
Forced |
586.02 |
21.02 |
|
SUNSET_2_UNITS |
MIDWAY SUNSET COGENERATION PLANT |
Forced |
248.00 |
12.00 |
|
SUTTER_2_PL1X3 |
SUTTER POWER PLANT AGGREGATE |
Forced |
525.00 |
525.00 |
|
SWIFT_1_NAS |
YERBA BUENA BATTERY |
Planned/Forced |
4.80 |
0.00 |
|
TANHIL_6_SOLART |
BERRY PETROLEUM COGEN 18 AGGREGATE |
Planned/Forced |
17.00 |
0.00 |
|
TORTLA_1_SOLAR |
Longboat Solar |
Forced |
20.00 |
0.00 |
|
TX-ELK_6_SOLAR1 |
Castor |
Forced |
1.50 |
0.00 |
|
UKIAH_7_LAKEMN |
UKIAH LAKE MENDOCINO HYDRO |
Forced |
3.50 |
3.50 |
|
UNCHEM_1_UNIT |
CONTRA COSTA CARBON PLANT |
Forced |
19.00 |
8.00 |
|
USWND2_1_WIND2 |
Golden Hills B |
Forced |
42.96 |
0.00 |
|
USWNDR_2_SMUD |
SOLANO WIND FARM |
Forced |
102.18 |
0.00 |
|
USWNDR_2_SMUD2 |
Solano Wind Project Phase 3 |
Forced |
127.80 |
0.00 |
|
USWPJR_2_UNITS |
Vasco Wind |
Forced |
78.20 |
0.00 |
|
VACADX_1_UNITA1 |
CalPeak Power Vaca Dixon Unit 1 |
Forced |
50.61 |
2.61 |
|
WESTVALL_7_UNIT 4 |
West Valley Unit 4 |
Forced |
38.00 |
38.00 |
|
WISE_1_UNIT 1 |
Wise Hydro Unit 1 |
Planned |
14.50 |
14.50 |
|
WISHON_6_UNITS |
Wishon/San Joaquin #1-A AGGREGATE |
Planned |
18.40 |
4.60 |
|
WNDMAS_2_UNIT 1 |
BUENA VISTA ENERGY, LLC |
Forced |
38.00 |
2.00 |
|
ZOND_6_UNIT |
ZOND WINDSYSTEMS INC. |
Planned |
17.10 |
17.10 |
|