| Resource ID |
Resource Name
|
Outage Type
|
Capacity (MW)
|
Curtailed (MW)
|
Zone Name
|
| AGRICO_6_PL3N5 |
Fresno Peaker |
Planned |
22.69 |
22.69 |
PGAE South |
| AGRICO_7_UNIT |
Fresno Cogen |
Planned |
50.60 |
50.60 |
PGAE South |
| ALAMIT_7_UNIT 3 |
ALAMITOS GEN STA. UNIT 3 |
Forced |
332.18 |
7.18 |
SCE Gen |
| ALAMIT_7_UNIT 4 |
ALAMITOS GEN STA. UNIT 4 |
Planned |
335.67 |
335.67 |
SCE Gen |
| ALTA3A_2_CPCE4 |
Alta Wind 4 |
Forced |
102.00 |
3.00 |
SCE Gen |
| ALTA3A_2_CPCE5 |
Alta Wind 5 |
Forced |
168.00 |
30.00 |
SCE Gen |
| ALTA3A_2_CPCE8 |
Alta Wind 8 |
Forced |
150.00 |
30.00 |
SCE Gen |
| ALTA4A_2_CPCW1 |
Alta Wind 1 |
Forced |
150.00 |
0.00 |
SCE Gen |
| ALTA4B_2_CPCW2 |
Alta Wind 2 |
Forced |
150.00 |
3.00 |
SCE Gen |
| ALTA4B_2_CPCW3 |
Alta Wind 3 |
Forced |
150.00 |
0.00 |
SCE Gen |
| ALTA4B_2_CPCW6 |
Mustang Hills |
Planned |
150.00 |
0.00 |
SCE Gen |
| ALTA6B_2_WIND11 |
Alta Wind 11 |
Forced |
90.00 |
1.70 |
SCE Gen |
| ALTA6E_2_WIND10 |
Alta Wind 10 |
Forced |
138.00 |
33.00 |
SCE Gen |
| ANAHM_2_CANYN1 |
CANYON POWER PLANT UNIT 1 |
Forced |
49.40 |
49.40 |
SCE Gen |
| ARCOGN_2_UNITS |
WATSON COGENERATION |
Planned |
416.60 |
0.00 |
SCE Gen |
| ASTORA_2_SOLAR2 |
Astoria 2 |
Planned |
75.00 |
0.00 |
SCE Gen |
| ATWELL_1_SOLAR |
Atwell Island PV Solar Generating Faci. |
Planned |
20.00 |
20.00 |
PGAE South |
| BALCHS_7_UNIT 2 |
BALCH 2 PH UNIT 2 |
Planned |
52.50 |
52.50 |
PGAE South |
| BDGRCK_1_UNITS |
BADGER CREEK LIMITED |
Forced |
48.08 |
5.08 |
PGAE South |
| BEJNLS_5_BV2SCEDYN |
Broadview 2 |
Forced |
167.00 |
0.00 |
SCE Gen |
| BEKWJS_5_BV1SCEDYN |
Broadview 1 |
Forced |
130.00 |
0.00 |
SCE Gen |
| BIGCRK_2_EXESWD |
BIG CREEK HYDRO PROJECT PSP |
Planned |
820.00 |
94.00 |
SCE Gen |
| BIGSKY_2_SOLAR1 |
Antelope Big Sky Ranch |
Forced |
20.00 |
0.00 |
SCE Gen |
| BIGSKY_2_SOLAR2 |
Big Sky Solar 4 |
Forced |
40.00 |
0.00 |
SCE Gen |
| BIGSKY_2_SOLAR3 |
Big Sky Summer |
Forced |
20.00 |
0.00 |
SCE Gen |
| BIGSKY_2_SOLAR4 |
Western Antelope Blue Sky Ranch B |
Forced |
20.00 |
0.00 |
SCE Gen |
| BIGSKY_2_SOLAR5 |
Big Sky Solar 2 |
Forced |
5.00 |
0.00 |
SCE Gen |
| BIGSKY_2_SOLAR7 |
Big Sky Solar 1 |
Forced |
50.00 |
0.00 |
SCE Gen |
| BISHOP_1_ALAMO |
BISHOP CREEK PLANT 2 AND 6 |
Planned |
13.40 |
4.40 |
SCE Gen |
| BISHOP_1_UNITS |
BISHOP CREEK PLANT 3 AND 4 |
Planned/Forced |
15.80 |
7.80 |
SCE Gen |
| BLACK_7_UNIT 1 |
JAMES B. BLACK 1 |
Forced |
85.00 |
4.00 |
PGAE North |
| BLACK_7_UNIT 2 |
JAMES B. BLACK 2 |
Forced |
84.10 |
24.10 |
PGAE North |
| BLAST_1_WIND |
Mountain View IV Wind |
Planned |
49.00 |
0.00 |
SCE Gen |
| BLYTHE_1_SOLAR2 |
Blythe Green 1 |
Forced |
20.00 |
5.00 |
SCE Gen |
| BORDER_6_UNITA1 |
CalPeak Power Border Unit 1 |
Forced |
51.25 |
3.25 |
SDGE Gen |
| BRDWAY_7_UNIT 3 |
BROADWAY UNIT 3 |
Forced |
65.00 |
65.00 |
SCE Gen |
| BRODIE_2_WIND |
Coram Brodie Wind Project |
Forced |
102.00 |
9.00 |
SCE Gen |
| BUCKWD_1_QF |
Buckwind Re-powering project |
Forced |
16.50 |
0.00 |
SCE Gen |
| CAMLOT_2_SOLAR1 |
Camelot |
Forced |
45.00 |
1.67 |
SCE Gen |
| CAMLOT_2_SOLAR2 |
Columbia Two |
Forced |
15.00 |
1.67 |
SCE Gen |
| CAPWD_1_QF |
Edom Hills Wind Farm |
Forced |
19.55 |
2.55 |
SCE Gen |
| CARBOU_7_PL4X5 |
CARIBOU PH 2 UNIT 4 & 5 AGGREGATE |
Planned |
120.00 |
120.00 |
PGAE North |
| CENTER_6_PEAKER |
Center Peaker |
Forced |
47.00 |
0.00 |
SCE Gen |
| CHILLS_1_SYCENG |
Sycamore Energy 1 |
Planned/Forced |
1.50 |
0.89 |
SDGE Gen |
| CHINO_6_CIMGEN |
O.L.S. ENERGY COMPANY -- CHINO |
Planned |
27.75 |
27.75 |
SCE Gen |
| CHINO_6_SMPPAP |
AltaGas Pomona Energy |
Planned |
44.00 |
44.00 |
SCE Gen |
| CHINO_7_MILIKN |
MN Milliken Genco LLC |
Planned |
1.90 |
1.90 |
SCE Gen |
| CHWCHL_1_BIOMAS |
Chow II Biomass to Energy |
Planned |
10.80 |
0.40 |
PGAE South |
| CNTNLA_2_SOLAR1 |
Centinela Solar Energy I |
Planned |
125.00 |
0.00 |
SDGE Gen |
| CNTNLA_2_SOLAR2 |
Centinels Solar Energy 2 |
Planned |
45.60 |
0.00 |
SDGE Gen |
| COCOPP_2_CTG1 |
Marsh Landing 1 |
Forced |
204.20 |
6.67 |
PGAE South |
| COCOPP_2_CTG2 |
Marsh Landing 2 |
Forced |
202.70 |
6.00 |
PGAE South |
| COCOPP_2_CTG3 |
Marsh Landing 3 |
Forced |
208.96 |
12.68 |
PGAE South |
| COCOPP_2_CTG4 |
Marsh Landing 4 |
Forced |
204.29 |
6.17 |
PGAE South |
| COLGAT_7_UNIT 1 |
Colgate Powerhouse Unit 1 |
Forced |
176.72 |
16.72 |
PGAE North |
| COLGAT_7_UNIT 2 |
Colgate Powerhouse Unit 2 |
Forced |
175.67 |
15.67 |
PGAE North |
| COLUSA_2_PL1X3 |
Colusa Generating Station |
Forced |
641.00 |
18.14 |
PGAE North |
| CONTRL_1_POOLE |
POOLE HYDRO PLANT 1 |
Planned |
10.90 |
10.90 |
SCE Gen |
| CRELMN_6_RAMON2 |
Ramona 2 |
Forced |
5.00 |
1.00 |
SDGE Gen |
| CRSTWD_6_KUMYAY |
Kumeyaay Wind Farm |
Planned/Forced |
50.00 |
25.00 |
SDGE Gen |
| CSLR4S_2_SOLAR |
Csolar IV South |
Planned |
130.00 |
0.00 |
SDGE Gen |
| CSTRVL_7_PL1X2 |
Marina Land Fill Gas |
Planned |
4.53 |
4.53 |
PGAE South |
| DEERCR_6_UNIT 1 |
DEER CREEK |
Forced |
7.00 |
7.00 |
PGAE North |
| DELSUR_6_SOLAR1 |
Summer Solar North |
Forced |
6.50 |
2.00 |
SCE Gen |
| DINUBA_6_UNIT |
DINUBA GENERATION PROJECT |
Forced |
12.00 |
0.00 |
PGAE South |
| DIVSON_6_NSQF |
DIVISION NAVAL STATION COGEN |
Planned |
47.00 |
47.00 |
SDGE Gen |
| DOUBLC_1_UNITS |
DOUBLE "C" LIMITED |
Planned/Forced |
52.23 |
0.83 |
PGAE South |
| DRUM_7_PL1X2 |
Drum PH 1 Units 1 & 2 Aggregate |
Planned/Forced |
26.00 |
13.00 |
PGAE North |
| DRUM_7_PL3X4 |
Drum PH 1 Units 3 & 4 Aggregate |
Forced |
28.90 |
0.00 |
PGAE North |
| DSABLA_7_UNIT |
De Sabla Hydro |
Planned |
18.50 |
18.50 |
PGAE North |
| DSRTSL_2_SOLAR1 |
Desert Stateline |
Forced |
296.19 |
0.00 |
SCE Gen |
| DUANE_1_PL1X3 |
DONALD VON RAESFELD POWER PROJECT |
Planned |
147.80 |
73.90 |
PGAE South |
| EEKTMN_6_SOLAR1 |
EE K Solar 1 |
Forced |
20.00 |
1.00 |
PGAE South |
| ELNIDP_6_BIOMAS |
El Nido Biomass to Energy |
Planned |
10.50 |
0.00 |
PGAE South |
| ELNIDS_2_DODPEV |
Los Angeles Air Force Base |
Forced |
0.50 |
0.20 |
SCE Gen |
| ELSEGN_2_UN1011 |
El Segundo Energy Center 5/6 |
Forced |
263.00 |
0.00 |
SCE Gen |
| ELSEGN_2_UN2021 |
El Segundo Energy Center 7/8 |
Forced |
263.68 |
0.68 |
SCE Gen |
| ENCINA_7_EA5 |
ENCINA UNIT 5 |
Forced |
330.00 |
135.00 |
SDGE Gen |
| ESCNDO_6_UNITB1 |
CalPeak Power Enterprise Unit 1 |
Forced |
48.04 |
0.04 |
SDGE Gen |
| ETIWND_2_FONTNA |
FONTANALYTLE CREEK POWERHOUSE P |
Planned |
2.56 |
0.00 |
SCE Gen |
| ETIWND_2_RTS015 |
SPVP015 |
Forced |
3.00 |
1.50 |
SCE Gen |
| ETIWND_2_RTS018 |
SPVP018 Fontana RT Solar |
Forced |
1.50 |
0.50 |
SCE Gen |
| ETIWND_2_UNIT1 |
New-Indy Ontario, LLC |
Planned |
33.60 |
28.60 |
SCE Gen |
| ETIWND_6_GRPLND |
Grapeland Peaker |
Forced |
46.00 |
0.00 |
SCE Gen |
| ETIWND_6_MWDETI |
ETIWANDA RECOVERY HYDRO |
Planned/Forced |
24.00 |
24.00 |
SCE Gen |
| ETIWND_7_MIDVLY |
MN Mid Valley Genco LLC |
Planned |
2.10 |
2.10 |
SCE Gen |
| FMEADO_7_UNIT |
FRENCH MEADOWS HYDRO |
Forced |
18.00 |
2.00 |
PGAE North |
| GARNET_1_UNITS |
GARNET GREEN POWER PROJECT AGGREGATE |
Forced |
16.50 |
0.00 |
SCE Gen |
| GARNET_1_WINDS |
Garnet Winds Aggregation |
Forced |
22.50 |
0.00 |
SCE Gen |
| GARNET_2_WIND1 |
Phoenix |
Forced |
11.20 |
11.20 |
SCE Gen |
| GARNET_2_WIND2 |
Karen Avenue Wind Farm |
Forced |
11.70 |
3.00 |
SCE Gen |
| GATES_2_SOLAR |
Gates Solar Station |
Planned |
20.00 |
0.00 |
PGAE South |
| GATWAY_2_PL1X3 |
GATEWAY GENERATING STATION |
Forced |
562.50 |
2.32 |
PGAE South |
| GILROY_1_UNIT |
GILROY COGEN AGGREGATE |
Planned |
120.00 |
0.00 |
PGAE South |
| GLNARM_2_UNIT 5 |
Glenarm Turbine 5 |
Forced |
68.00 |
13.00 |
SCE Gen |
| GLNARM_7_UNIT 2 |
GLEN ARM UNIT 2 |
Forced |
22.30 |
22.30 |
SCE Gen |
| GOLETA_6_EXGEN |
EXXON COMPANY USA |
Forced |
48.20 |
48.20 |
SCE Gen |
| GRIFFI_2_LSPDYN |
Griffith Energy |
Forced |
570.00 |
320.00 |
SCE Gen |
| GRNLF1_1_UNITS |
Greenleaf 1 |
Planned |
49.20 |
49.20 |
PGAE North |
| GRNLF2_1_UNIT |
GREENLEAF II COGEN |
Planned |
63.75 |
63.75 |
PGAE North |
| HELMPG_7_UNIT 1 |
HELMS PUMP-GEN UNIT 1 |
Forced |
407.00 |
0.00 |
PGAE South |
| HENRTA_6_UNITA1 |
GWF HENRIETTA PEAKER PLANT UNIT 1 |
Forced |
49.98 |
1.35 |
PGAE South |
| HENRTA_6_UNITA2 |
GWF HENRIETTA PEAKER PLANT UNIT 2 |
Forced |
49.42 |
0.90 |
PGAE South |
| HIDSRT_2_UNITS |
HIGH DESERT POWER PROJECT AGGREGATE |
Forced |
830.00 |
75.00 |
SCE Gen |
| HUMBPP_1_UNITS3 |
Humboldt Bay Generating Station 3 |
Planned |
65.08 |
32.54 |
PGAE North |
| HUMBPP_6_UNITS |
Humboldt Bay Generating Station 1 |
Planned |
97.62 |
0.00 |
PGAE North |
| INDIGO_1_UNIT 1 |
INDIGO PEAKER UNIT 1 |
Planned |
44.00 |
4.00 |
SCE Gen |
| INDIGO_1_UNIT 2 |
INDIGO PEAKER UNIT 2 |
Planned |
44.53 |
44.53 |
SCE Gen |
| INDIGO_1_UNIT 3 |
INDIGO PEAKER UNIT 3 |
Planned |
43.69 |
6.07 |
SCE Gen |
| INLDEM_5_UNIT 1 |
Inland Empire Energy Center, Unit 1 |
Planned |
376.20 |
0.00 |
SCE Gen |
| INSKIP_2_UNIT |
INSKIP HYDRO |
Planned/Forced |
8.00 |
6.79 |
PGAE North |
| INTMNT_3_ANAHEIM |
Intermountain Power Project |
Forced |
236.00 |
118.00 |
SCE Gen |
| INTMNT_3_PASADENA |
Intermountain Power Project |
Forced |
107.00 |
53.00 |
SCE Gen |
| INTMNT_3_RIVERSIDE |
IPPDYN |
Forced |
137.00 |
69.00 |
SCE Gen |
| IVANPA_1_UNIT1 |
Ivanpah 1 |
Forced |
123.20 |
33.20 |
SCE Gen |
| IVANPA_1_UNIT2 |
Ivanpah 2 |
Forced |
133.00 |
38.00 |
SCE Gen |
| IVANPA_1_UNIT3 |
Ivanpah 3 |
Forced |
133.00 |
8.00 |
SCE Gen |
| IVSLRP_2_SOLAR1 |
Silver Ridge Mount Signal |
Planned/Forced |
200.00 |
0.00 |
SDGE Gen |
| JAWBNE_2_NSRWND |
North Sky River Wind Project |
Forced |
160.00 |
1.60 |
SCE Gen |
| KEARNY_7_KY2 |
KEARNY GT2 AGGREGATE |
Planned |
59.00 |
14.00 |
SDGE Gen |
| KELYRG_6_UNIT |
KELLY RIDGE HYDRO |
Forced |
11.00 |
11.00 |
PGAE North |
| KERNFT_1_UNITS |
KERN FRONT LIMITED |
Forced |
52.40 |
1.80 |
PGAE South |
| KILARC_2_UNIT 1 |
KILARC HYDRO |
Forced |
3.20 |
1.83 |
PGAE North |
| KINGRV_7_UNIT 1 |
KINGS RIVER HYDRO UNIT 1 |
Planned |
51.20 |
51.20 |
PGAE South |
| KRNCNY_6_UNIT |
KERN CANYON |
Planned/Forced |
11.50 |
11.50 |
PGAE South |
| LAGBEL_2_STG1 |
Bell Bandini Commerce Refuse |
Planned |
10.05 |
10.05 |
SCE Gen |
| LARKSP_6_UNIT 1 |
LARKSPUR PEAKER UNIT 1 |
Forced |
46.10 |
2.10 |
SDGE Gen |
| LARKSP_6_UNIT 2 |
LARKSPUR PEAKER UNIT 2 |
Forced |
47.98 |
4.98 |
SDGE Gen |
| LAROA1_2_UNITA1 |
LR1 |
Planned |
180.00 |
180.00 |
SDGE Gen |
| LAROA2_2_UNITA1 |
LR2 |
Forced |
322.00 |
7.00 |
SDGE Gen |
| LEBECS_2_UNITS |
Pastoria Energy Facility |
Planned |
799.47 |
799.47 |
SCE Gen |
| LECEF_1_UNITS |
LOS ESTEROS ENERGY FACILITY AGGREGATE |
Forced |
309.84 |
4.04 |
PGAE South |
| LIVOAK_1_UNIT 1 |
LIVE OAK LIMITED |
Planned/Forced |
49.70 |
6.70 |
PGAE South |
| MANZNA_2_WIND |
Manzana Wind |
Forced |
189.00 |
1.50 |
SCE Gen |
| MDFKRL_2_PROJCT |
MIDDLE FORK AND RALSTON PSP |
Forced |
218.39 |
88.39 |
PGAE North |
| MIDWD_2_WIND2 |
Coram Energy |
Forced |
3.00 |
0.00 |
SCE Gen |
| MIRLOM_2_MLBBTA |
Mira Loma BESS A |
Forced |
10.00 |
0.00 |
SCE Gen |
| MIRLOM_2_MLBBTB |
Mira Loma BESS B |
Forced |
10.00 |
0.00 |
SCE Gen |
| MKTRCK_1_UNIT 1 |
MCKITTRICK LIMITED |
Forced |
47.49 |
4.29 |
PGAE South |
| MNDALY_6_MCGRTH |
McGrath Beach Peaker |
Planned |
47.20 |
47.20 |
SCE Gen |
| MNDALY_7_UNIT 1 |
MANDALAY GEN STA. UNIT 1 |
Planned |
215.00 |
215.00 |
SCE Gen |
| MNDALY_7_UNIT 2 |
MANDALAY GEN STA. UNIT 2 |
Planned |
215.29 |
215.29 |
SCE Gen |
| MNDALY_7_UNIT 3 |
MANDALAY GEN STA. UNIT 3 |
Planned |
130.00 |
130.00 |
SCE Gen |
| MOJAVE_1_SIPHON |
MOJAVE SIPHON POWER PLANT |
Forced |
12.58 |
0.00 |
SCE Gen |
| MONLTH_6_BATTRY |
Tehachapi Storage Project |
Planned |
7.99 |
7.99 |
SCE Gen |
| MONLTH_6_BOREL |
BOREL HYDRO UNITS 1-3 AGGREGATE |
Planned/Forced |
11.00 |
11.00 |
SCE Gen |
| MOORPK_6_QF |
MOORPARK QFS |
Planned |
28.59 |
28.59 |
SCE Gen |
| MOSSLD_2_PSP1 |
MOSS LANDING POWER BLOCK 1 |
Planned/Forced |
510.00 |
20.00 |
PGAE South |
| MOSSLD_2_PSP2 |
MOSS LANDING POWER BLOCK 2 |
Planned |
510.00 |
510.00 |
PGAE South |
| MRCHNT_2_PL1X3 |
Desert Star Energy Center |
Forced |
494.58 |
14.58 |
SCE Gen |
| MRGT_6_MEF2 |
Miramar Energy Facility II |
Planned |
47.90 |
47.90 |
SDGE Gen |
| MRGT_6_MMAREF |
Miramar Energy Facility |
Planned |
48.00 |
48.00 |
SDGE Gen |
| MSOLAR_2_SOLAR1 |
Mesquite Solar 1 |
Forced |
165.00 |
0.00 |
SCE Gen |
| MSOLAR_2_SOLAR2 |
Mesquite Solar 2 |
Forced |
100.81 |
0.00 |
SDGE Gen |
| MSOLAR_2_SOLAR3 |
Mesquite Solar 3, LLC |
Forced |
152.00 |
0.00 |
SDGE Gen |
| MTNPOS_1_UNIT |
MT.POSO COGENERATION CO. |
Planned/Forced |
46.64 |
6.64 |
PGAE South |
| MTWIND_1_UNIT 1 |
Mountain View Power Project I |
Planned/Forced |
44.40 |
13.20 |
SCE Gen |
| MTWIND_1_UNIT 2 |
Mountain View Power Project II |
Forced |
22.20 |
4.80 |
SCE Gen |
| MTWIND_1_UNIT 3 |
Mountain View Power Project III |
Forced |
22.44 |
9.64 |
SCE Gen |
| NAROW2_2_UNIT |
Narrows Powerhouse Unit 2 |
Forced |
55.00 |
2.00 |
PGAE North |
| NGILAA_5_SDGDYN |
NGILAA_5_SDGDYN |
Forced |
57.00 |
3.00 |
SDGE Gen |
| OAK C_7_UNIT 1 |
OAKLAND STATION C GT UNIT 1 |
Forced |
55.00 |
28.00 |
PGAE South |
| OAK C_7_UNIT 3 |
OAKLAND STATION C GT UNIT 3 |
Forced |
55.00 |
1.00 |
PGAE South |
| OILFLD_7_QFUNTS |
Nacimiento Hydroelectric Plant |
Planned |
3.80 |
0.02 |
PGAE South |
| OMAR_2_UNIT 1 |
KERN RIVER COGENERATION CO. UNIT 1 |
Forced |
78.00 |
4.90 |
PGAE South |
| OMAR_2_UNIT 1 |
KERN RIVER COGENERATION CO. UNIT 1 |
Forced |
78.00 |
4.90 |
SCE Gen |
| OMAR_2_UNIT 2 |
KERN RIVER COGENERATION CO. UNIT 2 |
Forced |
78.11 |
3.11 |
PGAE South |
| OMAR_2_UNIT 2 |
KERN RIVER COGENERATION CO. UNIT 2 |
Forced |
78.11 |
3.11 |
SCE Gen |
| OMAR_2_UNIT 3 |
KERN RIVER COGENERATION CO. UNIT 3 |
Forced |
81.41 |
3.01 |
PGAE South |
| OMAR_2_UNIT 3 |
KERN RIVER COGENERATION CO. UNIT 3 |
Forced |
81.41 |
3.01 |
SCE Gen |
| ORMOND_7_UNIT 1 |
ORMOND BEACH GEN STA. UNIT 1 |
Planned/Forced |
741.27 |
741.27 |
SCE Gen |
| OTAY_6_PL1X2 |
Chula Vista Energy Center, LLC |
Planned |
35.50 |
35.50 |
SDGE Gen |
| OTMESA_2_PL1X3 |
OTAY MESA ENERGY CENTER |
Forced |
603.68 |
13.68 |
SDGE Gen |
| OXBOW_6_DRUM |
OXBOW HYDRO |
Forced |
6.00 |
6.00 |
PGAE North |
| OXMTN_6_LNDFIL |
Ox Mountain Landfill Generating Plant |
Planned |
10.62 |
1.58 |
PGAE South |
| PACLUM_6_UNIT |
PACIFIC LUMBER (HUMBOLDT) |
Forced |
28.80 |
24.80 |
PGAE North |
| PADUA_2_ONTARO |
ONTARIO/SIERRA HYDRO PSP |
Planned |
1.92 |
0.00 |
SCE Gen |
| PIOPIC_2_CTG2 |
Pio Pico Unit 2 |
Forced |
106.00 |
106.00 |
SDGE Gen |
| PIOPIC_2_CTG3 |
Pio Pico Unit 3 |
Forced |
106.00 |
106.00 |
SDGE Gen |
| PIT3_7_PL1X3 |
PIT PH 3 UNITS 1, 2 & 3 AGGREGATE |
Planned/Forced |
70.60 |
46.60 |
PGAE North |
| PIT4_7_PL1X2 |
PIT PH 4 UNITS 1 & 2 AGGREGATE |
Planned |
95.00 |
41.00 |
PGAE North |
| PIT5_7_PL1X2 |
PIT PH 5 UNITS 1 & 2 AGGREGATE |
Forced |
82.00 |
82.00 |
PGAE North |
| PIT5_7_PL3X4 |
PIT PH 5 UNITS 3 & 4 AGGREGATE |
Forced |
82.00 |
82.00 |
PGAE North |
| PIT6_7_UNIT 1 |
PIT PH 6 UNIT 1 |
Forced |
39.00 |
3.00 |
PGAE North |
| PIT6_7_UNIT 2 |
PIT PH 6 UNIT 2 |
Forced |
40.00 |
4.00 |
PGAE North |
| PIT7_7_UNIT 1 |
PIT PH 7 UNIT 1 |
Forced |
55.70 |
4.70 |
PGAE North |
| PIT7_7_UNIT 2 |
PIT PH 7 UNIT 2 |
Planned/Forced |
54.60 |
3.60 |
PGAE North |
| POTTER_6_UNITS |
Potter Valley |
Forced |
10.10 |
4.00 |
PGAE North |
| PVERDE_5_SCEDYN |
PVERDE_5_SCEDYN |
Planned |
635.00 |
215.00 |
SCE Gen |
| PWEST_1_UNIT |
PACIFIC WEST 1 WIND GENERATION |
Forced |
2.10 |
2.10 |
SCE Gen |
| RAMON_2_SCEDYN |
RAMON_2_SCEDYN |
Planned |
359.60 |
98.60 |
SCE Gen |
| RCKCRK_7_UNIT 1 |
ROCK CREEK HYDRO UNIT 1 |
Planned |
57.00 |
0.00 |
PGAE North |
| RDWAY_1_CREST |
CREST Contracts |
Forced |
6.50 |
0.00 |
SCE Gen |
| REDOND_7_UNIT 7 |
REDONDO GEN STA. UNIT 7 |
Planned/Forced |
505.96 |
505.96 |
SCE Gen |
| RENWD_1_QF |
Renwind re-powering project |
Forced |
10.00 |
0.00 |
SCE Gen |
| ROSMDW_2_WIND1 |
Pacific Wind - Phase 1 |
Forced |
140.00 |
2.00 |
SCE Gen |
| ROSMND_6_SOLAR |
Lancaster B |
Planned/Forced |
3.00 |
0.00 |
SCE Gen |
| RUSCTY_2_UNITS |
Russell City Energy Center |
Forced |
620.00 |
0.00 |
PGAE South |
| SAMPSN_6_KELCO1 |
KELCO QUALIFYING FACILITY |
Forced |
25.00 |
15.70 |
SDGE Gen |
| SANWD_1_QF |
San Gorgonio Farms Wind Farm |
Forced |
31.00 |
0.20 |
SCE Gen |
| SBERDO_2_PSP3 |
Mountainview Gen Sta. Unit 3 |
Forced |
525.00 |
0.00 |
SCE Gen |
| SBERDO_2_PSP4 |
Mountainview Gen Sta. Unit 4 |
Planned/Forced |
525.00 |
525.00 |
SCE Gen |
| SBERDO_2_SNTANA |
SANTA ANA PSP |
Planned |
6.95 |
0.00 |
SCE Gen |
| SBERDO_6_MILLCK |
MILL CREEK PSP |
Planned |
3.93 |
0.00 |
SCE Gen |
| SCEHOV_2_HOOVER |
SCEHOV_2_HOOVER |
Planned |
525.00 |
228.00 |
SCE Gen |
| SENTNL_2_CTG1 |
Sentinel Unit 1 |
Forced |
92.09 |
92.09 |
SCE Gen |
| SLYCRK_1_UNIT 1 |
SLY CREEK HYDRO |
Forced |
13.00 |
2.00 |
PGAE North |
| SPAULD_6_UNIT12 |
SPAULDING HYDRO PH 1 & 2 AGGREGATE |
Forced |
11.40 |
2.10 |
PGAE North |
| SPI LI_2_UNIT 1 |
Lincoln Biomass |
Planned |
17.20 |
17.20 |
PGAE North |
| SPRGAP_1_UNIT 1 |
SPRING GAP HYDRO |
Forced |
7.00 |
0.00 |
PGAE North |
| SPRGVL_2_TULE |
TULE RIVER HYDRO PLANT (PG&E) |
Planned |
6.40 |
6.40 |
SCE Gen |
| SUNSET_2_UNITS |
MIDWAY SUNSET COGENERATION PLANT |
Forced |
248.00 |
17.00 |
PGAE South |
| SUNSHN_2_LNDFL |
Sunshine Gas Producers |
Forced |
20.00 |
6.00 |
SCE Gen |
| SWIFT_1_NAS |
YERBA BUENA BATTERY |
Forced |
4.80 |
2.80 |
PGAE South |
| SYCAMR_2_UNIT 1 |
Sycamore Cogeneration Unit 1 |
Planned |
85.00 |
2.73 |
SCE Gen |
| SYCAMR_2_UNIT 2 |
Sycamore Cogeneration Unit 2 |
Planned |
85.00 |
5.83 |
SCE Gen |
| SYCAMR_2_UNIT 3 |
Sycamore Cogeneration Unit 3 |
Planned |
85.00 |
2.58 |
SCE Gen |
| SYCAMR_2_UNIT 4 |
Sycamore Cogeneration Unit 4 |
Planned |
85.00 |
5.21 |
SCE Gen |
| TEHAPI_2_WIND1 |
Wind Wall Monolith 1 |
Planned |
14.89 |
4.31 |
SCE Gen |
| TEHAPI_2_WIND2 |
Wind Wall Monolith 2 |
Planned |
21.24 |
5.04 |
SCE Gen |
| TENGEN_2_PL1X2 |
Berry Cogen 42 |
Forced |
40.20 |
0.00 |
SCE Gen |
| TERMEX_2_PL1X3 |
TDM |
Planned |
625.00 |
625.00 |
SDGE Gen |
| TIFFNY_1_DILLON |
TIFFNY_1_DILLON |
Forced |
45.00 |
19.30 |
SCE Gen |
| TIGRCK_7_UNITS |
TIGER CREEK HYDRO AGGREGATE |
Planned/Forced |
62.00 |
62.00 |
PGAE North |
| TOADTW_6_UNIT |
TOAD TOWN |
Planned |
1.50 |
1.50 |
PGAE North |
| VALLEY_5_SOLAR2 |
AP North Lake Solar |
Forced |
20.00 |
0.00 |
SCE Gen |
| VALLEY_7_BADLND |
VALLEY_7_BADLND |
Forced |
1.30 |
0.00 |
SCE Gen |
| VERNON_6_GONZL1 |
H. Gonzales Unit #1 |
Forced |
5.75 |
5.75 |
SCE Gen |
| VERNON_6_GONZL2 |
H. Gonzales Unit #2 |
Forced |
5.75 |
5.75 |
SCE Gen |
| VESTAL_2_KERN |
KERN RIVER PH 3 UNITS 1 & 2 AGGREGATE |
Forced |
36.80 |
17.10 |
SCE Gen |
| VICTOR_1_LVSLR1 |
Lone Valley Solar Park 1 |
Forced |
10.00 |
2.00 |
SCE Gen |
| VINCNT_2_WESTWD |
Oasis Power Plant |
Forced |
60.00 |
3.00 |
SCE Gen |
| WADHAM_6_UNIT |
Wadham Energy LP |
Planned |
32.00 |
0.00 |
PGAE North |
| WALCRK_2_CTG1 |
Walnut Creek Energy Park Unit 1 |
Planned/Forced |
96.43 |
96.43 |
SCE Gen |
| WALCRK_2_CTG2 |
Walnut Creek Energy Park Unit 2 |
Planned |
96.91 |
0.00 |
SCE Gen |
| WALCRK_2_CTG3 |
Walnut Creek Energy Park Unit 3 |
Planned |
96.65 |
0.00 |
SCE Gen |
| WALCRK_2_CTG4 |
Walnut Creek Energy Park Unit 4 |
Planned |
96.49 |
0.00 |
SCE Gen |
| WALCRK_2_CTG5 |
Walnut Creek Energy Park Unit 5 |
Planned |
96.65 |
0.00 |
SCE Gen |
| WALNUT_7_WCOVST |
MM West Covina - ST Unit |
Planned |
6.50 |
6.50 |
SCE Gen |
| WDLEAF_7_UNIT 1 |
WOODLEAF HYDRO |
Forced |
60.00 |
20.00 |
PGAE North |
| WHTWTR_1_WINDA1 |
Whitewater Hill Wind Project |
Forced |
61.50 |
11.50 |
SCE Gen |
| WNDSTR_2_WIND |
Windstar |
Planned |
120.00 |
4.00 |
SCE Gen |
| ADERA_1_SOLAR1 |
Adera Solar |
Forced |
20.00 |
20.00 |
|
| ADLIN_1_UNITS |
GEYSERS AIDLIN AGGREGATE |
Forced |
22.00 |
8.00 |
|
| ARLINT_5_SCEDYN |
Arlington Valley CC |
Forced |
565.00 |
315.00 |
|
| AVENAL_6_SUNCTY |
Sun City Solar Project |
Forced |
20.00 |
0.00 |
|
| BCTSYS_5_PWXDYN |
BCTSYS_5_PWXDYN |
Forced |
428.00 |
148.00 |
|
| BEARMT_1_UNIT |
Bear Mountain Limited |
Forced |
49.21 |
4.21 |
|
| BELDEN_7_UNIT 1 |
BELDEN HYDRO |
Planned/Forced |
119.00 |
119.00 |
|
| BLULKE_6_BLUELK |
Blue Lake Power |
Forced |
12.00 |
12.00 |
|
| BNNIEN_7_ALTAPH |
ALTA POWER HOUSE |
Planned |
1.00 |
0.70 |
|
| BRDSLD_2_HIWIND |
High Winds Energy Center |
Forced |
162.00 |
7.20 |
|
| BRDSLD_2_MTZUM2 |
NextEra Energy Montezuma Wind II |
Forced |
78.20 |
0.00 |
|
| BRDSLD_2_MTZUMA |
FPL Energy Montezuma Wind |
Forced |
36.80 |
0.00 |
|
| BRDSLD_2_SHILO1 |
Shiloh I Wind Project |
Forced |
150.00 |
6.00 |
|
| BRDSLD_2_SHILO2 |
SHILOH WIND PROJECT 2 |
Planned |
150.00 |
6.00 |
|
| BRDSLD_2_SHLO3A |
Shiloh III Wind Project, LLC |
Forced |
102.50 |
6.50 |
|
| BRDSLD_2_SHLO3B |
Shiloh IV Wind Project |
Forced |
100.00 |
0.00 |
|
| BUCKCK_7_OAKFLT |
Oak Flat |
Forced |
1.30 |
1.30 |
|
| BURNYF_2_UNIT 1 |
Burney Forest Power |
Planned |
35.70 |
35.70 |
|
| CASTVL_2_FCELL |
PGE CSUEB Hayward Fuel Cell |
Forced |
1.40 |
1.40 |
|
| CHALK_1_UNIT |
CHALK CLIFF LIMITED |
Forced |
48.67 |
6.67 |
|
| CNTRVL_6_UNIT |
Centerville |
Forced |
6.40 |
6.40 |
|
| COGNAT_1_UNIT |
Stockton Biomas |
Planned/Forced |
48.00 |
48.00 |
|
| CONTAN_1_UNIT |
Graphic Packaging Cogen |
Planned |
27.70 |
27.70 |
|
| CRNEVL_6_SJQN 3 |
SAN JOAQUIN 3 |
Forced |
4.20 |
4.20 |
|
| DALYCT_1_FCELL |
PGE San Francisco State Fuel Cell |
Forced |
1.60 |
1.40 |
|
| DELTA_2_PL1X4 |
DELTA ENERGY CENTER AGGREGATE |
Forced |
880.00 |
880.00 |
|
| DONNLS_7_UNIT |
Donnells Hydro |
Forced |
72.00 |
0.00 |
|
| ELKHIL_2_PL1X3 |
ELK HILLS COMBINED CYCLE (AGGREGATE) |
Planned |
551.70 |
25.70 |
|
| GEYS11_7_UNIT11 |
GEYSERS UNIT 11 (HEALDSBURG) |
Forced |
74.40 |
0.40 |
|
| GEYS12_7_UNIT12 |
GEYSERS UNIT 12 (HEALDSBURG) |
Forced |
57.00 |
6.00 |
|
| GEYS13_7_UNIT13 |
GEYSERS UNIT 13 (HEALDSBURG) |
Forced |
95.00 |
39.00 |
|
| GEYS14_7_UNIT14 |
GEYSERS UNIT 14 (HEALDSBURG) |
Forced |
70.00 |
20.00 |
|
| GEYS16_7_UNIT16 |
GEYSERS UNIT 16 (HEALDSBURG) |
Forced |
85.00 |
42.00 |
|
| GEYS17_7_UNIT17 |
GEYSERS UNIT 17 (HEALDSBURG) |
Forced |
60.00 |
0.00 |
|
| GEYS18_7_UNIT18 |
GEYSERS UNIT 18 (HEALDSBURG) |
Forced |
72.00 |
34.00 |
|
| GEYS20_7_UNIT20 |
GEYSERS UNIT 20 (HEALDSBURG) |
Forced |
62.00 |
25.00 |
|
| GWFPWR_1_UNITS |
HANFORD PEAKER PLANT |
Forced |
98.46 |
0.55 |
|
| GYS5X6_7_UNITS |
GEYSERS UNITS 5 & 6 AGGREGATE |
Forced |
85.00 |
0.00 |
|
| GYS7X8_7_UNITS |
GEYSERS UNITS 7 & 8 AGGREGATE |
Planned/Forced |
82.00 |
82.00 |
|
| HATRDG_2_WIND |
Hatchet Ridge Wind Farm |
Forced |
102.00 |
3.10 |
|
| HMLTBR_6_UNITS |
HAMILTON BRANCH PH (AGGREGATE) |
Planned |
4.90 |
2.30 |
|
| HYTTHM_2_UNITS |
HYATT-THERMALITO PUMP-GEN (AGGREGATE) |
Planned/Forced |
933.10 |
933.10 |
|
| INTKEP_2_UNITS |
CCSF Hetch_Hetchy Hydro Aggregate |
Forced |
405.00 |
13.00 |
|
| KELSO_2_UNITS |
Mariposa Energy |
Forced |
198.03 |
1.76 |
|
| LAPAC_6_UNIT |
LOUISIANA PACIFIC SAMOA |
Forced |
20.00 |
20.00 |
|
| LAPLMA_2_UNIT 1 |
La Paloma Generating Plant Unit #1 |
Forced |
259.80 |
6.80 |
|
| LAPLMA_2_UNIT 2 |
La Paloma Generating Plant Unit #2 |
Planned |
260.20 |
260.20 |
|
| LAPLMA_2_UNIT 3 |
La Paloma Generating Plant Unit #3 |
Forced |
256.15 |
15.15 |
|
| LAPLMA_2_UNIT 4 |
LA PALOMA GENERATING PLANT, UNIT #4 |
Forced |
259.54 |
8.54 |
|
| LMEC_1_PL1X3 |
Los Medanos Energy Center AGGREGATE |
Planned |
561.29 |
0.00 |
|
| LODIEC_2_PL1X2 |
Lodi Energy Center |
Forced |
302.58 |
16.68 |
|
| MALAGA_1_PL1X2 |
Malaga Power Aggregate |
Forced |
96.00 |
8.00 |
|
| MALCHQ_7_UNIT 1 |
MALACHA HYDRO L.P. |
Forced |
32.50 |
0.00 |
|
| METEC_2_PL1X3 |
Metcalf Energy Center |
Planned/Forced |
593.16 |
10.00 |
|
| MSTANG_2_SOLAR3 |
Mustang 3 |
Forced |
40.00 |
0.68 |
|
| NCPA_7_GP2UN3 |
NCPA GEO PLANT 2 UNIT 3 |
Forced |
42.42 |
42.42 |
|
| OLIVEP_1_BATTRY |
White River 2 BESS |
Forced |
2.00 |
2.00 |
|
| PHOENX_1_UNIT |
PHOENIX PH |
Forced |
2.00 |
0.00 |
|
| PINFLT_7_UNITS |
PINE FLAT HYDRO AGGREGATE |
Planned |
210.00 |
0.00 |
|
| PLMSSR_6_HISIER |
High Sierra Cogeneration Aggregate |
Planned |
6.00 |
2.99 |
|
| PLSNTG_7_LNCLND |
Lincoln Landfill Power Plant |
Forced |
4.98 |
1.68 |
|
| PNCHEG_2_PL1X4 |
PANOCHE ENERGY CENTER (Aggregated) |
Forced |
401.00 |
0.00 |
|
| PNCHPP_1_PL1X2 |
Midway Peaking Aggregate |
Forced |
119.91 |
0.00 |
|
| PNOCHE_1_UNITA1 |
CalPeak Power Panoche Unit 1 |
Forced |
52.01 |
4.01 |
|
| REEDLY_6_SOLAR |
Terzian |
Planned |
1.23 |
1.23 |
|
| RICHMN_7_BAYENV |
BAY ENVIRONMENTAL (NOVE POWER) |
Forced |
2.50 |
2.00 |
|
| SANTFG_7_UNITS |
GEYSERS CALISTOGA AGGREGATE |
Forced |
92.10 |
33.10 |
|
| SCHLTE_1_PL1X3 |
Tracy Combined Cycle Power Plant |
Forced |
332.28 |
8.31 |
|
| SIERRA_1_UNITS |
HIGH SIERRA LIMITED |
Forced |
52.43 |
0.93 |
|
| SLUISP_2_UNITS |
SAN LUIS (GIANELLI) PUMP-GEN (AGGREGATE) |
Planned/Forced |
374.43 |
72.43 |
|
| SMUDGO_7_UNIT 1 |
SONOMA POWER PLANT |
Forced |
53.00 |
0.00 |
|
| SOUTH_2_UNIT |
SOUTH HYDRO |
Planned |
7.10 |
7.10 |
|
| SPIAND_1_ANDSN2 |
SPI Anderson 2 |
Planned |
27.15 |
27.15 |
|
| STOILS_1_UNITS |
Chevron Richmond Refinery |
Planned |
113.90 |
113.90 |
|
| SUNRIS_2_PL1X3 |
Sunrise Power Project AGGREGATE II |
Forced |
586.02 |
15.02 |
|
| SUTTER_2_PL1X3 |
SUTTER POWER PLANT AGGREGATE |
Forced |
525.00 |
525.00 |
|
| TRNQLT_2_SOLAR |
Tranquillity |
Forced |
200.00 |
2.00 |
|
| UKIAH_7_LAKEMN |
UKIAH LAKE MENDOCINO HYDRO |
Forced |
3.50 |
2.50 |
|
| UNCHEM_1_UNIT |
CONTRA COSTA CARBON PLANT |
Forced |
19.00 |
8.00 |
|
| UNVRSY_1_UNIT 1 |
Berry Cogen 38 - Unit 1 |
Planned |
38.00 |
38.00 |
|
| USWND2_1_WIND1 |
Golden Hills A |
Planned |
42.96 |
1.79 |
|
| USWND2_1_WIND2 |
Golden Hills B |
Forced |
42.96 |
0.00 |
|
| USWNDR_2_SMUD |
SOLANO WIND FARM |
Forced |
102.18 |
0.00 |
|
| USWNDR_2_SMUD2 |
Solano Wind Project Phase 3 |
Forced |
127.80 |
0.00 |
|
| USWPJR_2_UNITS |
Vasco Wind |
Forced |
78.20 |
0.00 |
|
| VACADX_1_UNITA1 |
CalPeak Power Vaca Dixon Unit 1 |
Forced |
50.61 |
2.61 |
|
| VEDDER_1_SEKERN |
TEXACO EXPLORATION & PROD (SE KERN RIVER |
Forced |
39.70 |
36.70 |
|
| VOLTA_6_BAILCK |
Bailey Creek Ranch |
Planned |
0.63 |
0.57 |
|
| WESTPT_2_UNIT |
West Point Hydro Plant |
Planned |
14.00 |
14.00 |
|
| WISE_1_UNIT 1 |
Wise Hydro Unit 1 |
Forced |
14.50 |
0.00 |
|
| WISHON_6_UNITS |
Wishon/San Joaquin #1-A AGGREGATE |
Forced |
18.40 |
0.39 |
|
| WNDMAS_2_UNIT 1 |
BUENA VISTA ENERGY, LLC |
Forced |
38.00 |
2.00 |
|
| WOODWR_1_HYDRO |
Quinten Luallen |
Forced |
7.30 |
7.30 |
|
| WRGHTP_7_AMENGY |
SMALL QF AGGREGATION - LOS BANOS |
Forced |
2.50 |
2.50 |
|
| ZOND_6_UNIT |
ZOND WINDSYSTEMS INC. |
Forced |
17.10 |
17.10 |
|