ACACIA_6_SOLAR |
West Antelope Solar |
Forced |
20.00 |
0.00 |
SCE Gen |
ADLIN_1_UNITS |
GEYSERS AIDLIN AGGREGATE |
Forced |
22.00 |
8.00 |
PGAE Gen |
ADOBEE_1_SOLAR |
Adobe Solar |
Forced |
20.00 |
0.00 |
PGAE Gen |
ALAMIT_2_PL1X3 |
Alamitos Energy Center Unit 7 |
Forced |
677.00 |
0.00 |
SCE Gen |
ALAMIT_7_UNIT 1 |
ALAMITOS GEN STA. UNIT 1 |
Planned |
174.56 |
174.56 |
SCE Gen |
ALAMIT_7_UNIT 2 |
ALAMITOS GEN STA. UNIT 2 |
Planned |
175.00 |
175.00 |
SCE Gen |
ALAMIT_7_UNIT 3 |
ALAMITOS GEN STA. UNIT 3 |
Planned |
332.18 |
0.00 |
SCE Gen |
ALAMIT_7_UNIT 4 |
ALAMITOS GEN STA. UNIT 4 |
Planned/Forced |
335.67 |
335.67 |
SCE Gen |
ALAMIT_7_UNIT 5 |
ALAMITOS GEN STA. UNIT 5 |
Planned |
497.97 |
0.00 |
SCE Gen |
ALAMIT_7_UNIT 6 |
ALAMITOS GEN STA. UNIT 6 |
Planned |
495.00 |
495.00 |
SCE Gen |
ALMEGT_1_UNIT 1 |
ALAMEDA GT UNIT 1 |
Forced |
25.00 |
2.00 |
PGAE South |
ALMEGT_1_UNIT 2 |
ALAMEDA GT UNIT 2 |
Forced |
25.00 |
2.00 |
PGAE South |
ALTA4B_2_CPCW6 |
Mustang Hills |
Planned |
150.00 |
6.00 |
SCE Gen |
ANAHM_7_CT |
ANAHEIM COMBUSTION TURBINE |
Forced |
42.81 |
42.81 |
SCE Gen |
ASTORA_2_SOLAR1 |
Astoria 1 |
Forced |
100.00 |
0.00 |
SCE Gen |
AVSOLR_2_SOLAR |
AV SOLAR RANCH 1 |
Forced |
241.50 |
0.00 |
SCE Gen |
BARRE_6_PEAKER |
Barre Peaker |
Forced |
47.00 |
47.00 |
SCE Gen |
BCTSYS_5_PWXDYN |
BCTSYS_5_PWXDYN |
Forced |
428.00 |
428.00 |
PGAE Gen |
BGSKYN_2_AS2SR1 |
Antelope Solar 2 |
Forced |
105.00 |
3.00 |
SCE Gen |
BGSKYN_2_ASPSR2 |
Antelope Solar 2 San Pablo |
Forced |
100.00 |
0.00 |
SCE Gen |
BGSKYN_2_BS3SR3 |
Big Sky Solar 3 |
Forced |
20.00 |
2.50 |
SCE Gen |
BIGCRK_2_EXESWD |
BIG CREEK HYDRO PROJECT PSP |
Planned/Forced |
820.00 |
120.00 |
SCE Gen |
BIGSKY_2_BSKSR6 |
Big Sky Solar 6 |
Forced |
20.00 |
0.00 |
SCE Gen |
BIGSKY_2_BSKSR7 |
Big Sky Solar 7 |
Forced |
20.00 |
0.00 |
SCE Gen |
BIGSKY_2_BSKSR8 |
Big Sky Solar 8 |
Forced |
20.00 |
0.00 |
SCE Gen |
BIGSKY_2_SOLAR2 |
Big Sky Solar 4 |
Forced |
40.00 |
0.00 |
SCE Gen |
BIGSKY_2_SOLAR3 |
Big Sky Summer |
Forced |
20.00 |
0.00 |
SCE Gen |
BIGSKY_2_SOLAR4 |
Western Antelope Blue Sky Ranch B |
Forced |
20.00 |
0.00 |
SCE Gen |
BIGSKY_2_SOLAR5 |
Big Sky Solar 2 |
Forced |
5.00 |
0.00 |
SCE Gen |
BIGSKY_2_SOLAR6 |
Solverde 1 |
Forced |
85.00 |
0.00 |
SCE Gen |
BIGSKY_2_SOLAR7 |
Big Sky Solar 1 |
Forced |
50.00 |
0.00 |
SCE Gen |
BKRFLD_2_SOLAR1 |
Bakersfield 111 |
Forced |
1.38 |
0.00 |
PGAE Gen |
BLACK_7_UNIT 1 |
JAMES B. BLACK 1 |
Forced |
85.00 |
3.00 |
PGAE North |
BLAST_1_WIND |
Mountain View IV Wind |
Planned |
49.00 |
2.00 |
SCE Gen |
BLULKE_6_BLUELK |
Blue Lake Power |
Forced |
12.00 |
12.00 |
PGAE Gen |
BORDER_6_UNITA1 |
CalPeak Power Border Unit 1 |
Forced |
51.25 |
3.25 |
SDGE Gen |
BRDSLD_2_HIWIND |
High Winds Energy Center |
Forced |
162.00 |
16.20 |
PGAE Gen |
BUCKCK_2_HYDRO |
Lassen Station Hydro |
Forced |
0.99 |
0.99 |
PGAE Gen |
BUCKWD_1_QF |
Buckwind Re-powering project |
Forced |
16.50 |
0.00 |
SCE Gen |
BUCKWD_7_WINTCV |
Wintec Energy, Ltd. |
Forced |
1.32 |
0.66 |
SCE Gen |
BURNYF_2_UNIT 1 |
Burney Forest Power |
Forced |
31.00 |
31.00 |
PGAE Gen |
CAMCHE_1_PL1X3 |
CAMANCHE UNITS 1, 2 & 3 AGGREGATE |
Forced |
9.99 |
7.99 |
PGAE Gen |
CARLS1_2_CARCT1 |
Carlsbad 1 |
Forced |
422.00 |
0.00 |
SDGE Gen |
CARLS2_1_CARCT1 |
Carlsbad 2 |
Forced |
105.50 |
0.00 |
SDGE Gen |
CASTVL_2_FCELL |
PGE CSUEB Hayward Fuel Cell |
Forced |
1.40 |
1.40 |
PGAE Gen |
CENTER_2_RHONDO |
MWD Rio Hondo Hydroelectric Recovery Pla |
Forced |
1.91 |
1.91 |
SCE Gen |
CENTER_6_PEAKER |
Center Peaker |
Forced |
47.11 |
47.11 |
SCE Gen |
CHINO_7_MILIKN |
MN Milliken Genco LLC |
Planned |
1.90 |
1.90 |
SCE Gen |
CHWCHL_1_BIOMAS |
Chow II Biomass to Energy |
Forced |
10.80 |
0.00 |
PGAE South |
COCOPP_2_CTG4 |
Marsh Landing 4 |
Forced |
204.29 |
204.29 |
PGAE South |
COCOSB_6_SOLAR |
Oakley Solar Project |
Forced |
1.50 |
0.00 |
PGAE Gen |
COLGAT_7_UNIT 1 |
Colgate Powerhouse Unit 1 |
Planned |
176.72 |
24.72 |
PGAE North |
COLGAT_7_UNIT 2 |
Colgate Powerhouse Unit 2 |
Planned |
175.67 |
23.67 |
PGAE North |
COLUSA_2_PL1X3 |
Colusa Generating Station |
Forced |
641.00 |
16.00 |
PGAE North |
CONTRL_1_RUSHCK |
RUSH CREEK |
Planned |
11.94 |
11.94 |
SCE Gen |
COVERD_2_MCKHY1 |
Montgomery Creek Hydro |
Forced |
2.80 |
1.80 |
PGAE Gen |
CRNEVL_6_SJQN 2 |
SAN JOAQUIN 2 |
Planned |
3.20 |
3.20 |
PGAE Gen |
CRNEVL_6_SJQN 3 |
SAN JOAQUIN 3 |
Forced |
4.20 |
4.20 |
PGAE Gen |
CSTRVL_7_PL1X2 |
Marina Land Fill Gas |
Planned |
4.53 |
0.53 |
PGAE South |
CUYAMS_6_CUYSR1 |
Cuyama Solar |
Forced |
40.00 |
0.00 |
PGAE Gen |
DAVIS_1_SOLAR1 |
Grasslands 3 |
Forced |
1.00 |
0.00 |
PGAE Gen |
DAVIS_1_SOLAR2 |
Grasslands 4 |
Forced |
1.00 |
0.00 |
PGAE Gen |
DELAMO_2_SOLRC1 |
Golden Springs Building C1 |
Forced |
1.16 |
0.00 |
SCE Gen |
DELAMO_2_SOLRD |
Golden Solar Building D |
Forced |
1.25 |
0.00 |
SCE Gen |
DELTA_2_PL1X4 |
DELTA ENERGY CENTER AGGREGATE |
Forced |
880.00 |
15.00 |
PGAE Gen |
DUANE_1_PL1X3 |
DONALD VON RAESFELD POWER PROJECT |
Forced |
147.80 |
54.80 |
PGAE South |
ELCABO_5_ECWSCEDYN |
El Cabo Wind |
Forced |
298.00 |
0.00 |
APS Gen |
ELCABO_5_ECWSCEDYN |
El Cabo Wind |
Forced |
298.00 |
0.00 |
SCE Gen |
ELCAJN_6_EB1BT1 |
Eastern BESS 1 |
Forced |
7.50 |
7.50 |
SDGE Gen |
ELKCRK_6_STONYG |
STONEY GORGE HYDRO AGGREGATE |
Forced |
4.90 |
4.90 |
PGAE Gen |
ELKHIL_2_PL1X3 |
ELK HILLS COMBINED CYCLE (AGGREGATE) |
Forced |
551.70 |
23.70 |
PGAE Gen |
ELSEGN_2_UN1011 |
El Segundo Energy Center 5/6 |
Forced |
263.00 |
0.00 |
SCE Gen |
ELSEGN_2_UN2021 |
El Segundo Energy Center 7/8 |
Forced |
263.68 |
0.00 |
SCE Gen |
ENWIND_2_WIND1 |
Cameron Ridge |
Forced |
47.10 |
0.00 |
SCE Gen |
ENWIND_2_WIND2 |
Ridgetop I |
Forced |
38.24 |
0.00 |
SCE Gen |
ESCNDO_6_EB1BT1 |
Escondido BESS 1 |
Forced |
10.00 |
10.00 |
SDGE Gen |
ESCNDO_6_EB2BT2 |
Escondido BESS 2 |
Forced |
10.00 |
10.00 |
SDGE Gen |
ESCNDO_6_EB3BT3 |
Escondido BESS 3 |
Forced |
10.00 |
10.00 |
SDGE Gen |
ESCNDO_6_UNITB1 |
CalPeak Power Enterprise Unit 1 |
Forced |
48.04 |
0.00 |
SDGE Gen |
ESQUON_6_LNDFIL |
Neal Road Landfill Generating Facility |
Forced |
2.10 |
1.10 |
PGAE Gen |
ETIWND_2_FONTNA |
FONTANALYTLE CREEK POWERHOUSE P |
Planned |
2.56 |
1.16 |
SCE Gen |
ETIWND_2_UNIT1 |
ETIWND_2_UNIT1 |
Planned |
33.60 |
32.60 |
SCE Gen |
FLOWD_2_RT2WD2 |
Ridgetop 2 |
Forced |
27.39 |
0.00 |
SCE Gen |
FORKBU_6_UNIT |
HYPOWER, INC. (FORKS OF BUTTE) |
Forced |
14.30 |
10.80 |
PGAE Gen |
GALE_1_SR3SR3 |
Sunray 3 |
Forced |
13.80 |
0.00 |
SCE Gen |
GARNET_1_SOLAR2 |
Garnet Solar Power Generation Station 1 |
Forced |
4.00 |
0.00 |
SCE Gen |
GARNET_1_UNITS |
GARNET GREEN POWER PROJECT AGGREGATE |
Forced |
16.50 |
7.59 |
SCE Gen |
GARNET_1_WINDS |
Garnet Winds Aggregation |
Forced |
22.50 |
0.00 |
SCE Gen |
GARNET_2_DIFWD1 |
Difwind |
Forced |
7.88 |
7.88 |
SCE Gen |
GARNET_2_HYDRO |
Whitewater Hydro |
Forced |
1.00 |
1.00 |
SCE Gen |
GARNET_2_WIND2 |
Karen Avenue Wind Farm |
Planned |
11.70 |
0.00 |
SCE Gen |
GARNET_2_WPMWD6 |
WINTEC PALM |
Forced |
5.93 |
5.93 |
SCE Gen |
GEYS11_7_UNIT11 |
GEYSERS UNIT 11 (HEALDSBURG) |
Forced |
74.40 |
0.00 |
PGAE Gen |
GEYS12_7_UNIT12 |
GEYSERS UNIT 12 (HEALDSBURG) |
Forced |
57.00 |
8.00 |
PGAE Gen |
GEYS13_7_UNIT13 |
GEYSERS UNIT 13 (HEALDSBURG) |
Forced |
95.00 |
95.00 |
PGAE Gen |
GEYS14_7_UNIT14 |
GEYSERS UNIT 14 (HEALDSBURG) |
Forced |
70.00 |
6.00 |
PGAE Gen |
GEYS16_7_UNIT16 |
GEYSERS UNIT 16 (HEALDSBURG) |
Forced |
85.00 |
28.00 |
PGAE Gen |
GEYS17_7_UNIT17 |
GEYSERS UNIT 17 (HEALDSBURG) |
Forced |
60.00 |
0.00 |
PGAE Gen |
GEYS18_7_UNIT18 |
GEYSERS UNIT 18 (HEALDSBURG) |
Forced |
72.00 |
72.00 |
PGAE Gen |
GEYS20_7_UNIT20 |
GEYSERS UNIT 20 (HEALDSBURG) |
Forced |
62.00 |
62.00 |
PGAE Gen |
GIFFEN_6_SOLAR |
Giffen Solar Station |
Forced |
10.00 |
0.00 |
PGAE South |
GLDTWN_6_COLUM3 |
Columbia 3 |
Forced |
10.00 |
0.00 |
SCE Gen |
GLNARM_2_UNIT 5 |
Glenarm Turbine 5 |
Forced |
65.81 |
0.00 |
SCE Gen |
GLNARM_7_UNIT 1 |
GLEN ARM UNIT 1 |
Forced |
22.07 |
0.00 |
SCE Gen |
GLNARM_7_UNIT 2 |
GLEN ARM UNIT 2 |
Forced |
22.30 |
0.00 |
SCE Gen |
GLNARM_7_UNIT 3 |
GLEN ARM UNIT 3 |
Forced |
44.83 |
0.00 |
SCE Gen |
GLNARM_7_UNIT 4 |
GLEN ARM UNIT 4 |
Forced |
42.42 |
0.00 |
SCE Gen |
GOLETA_6_EXGEN |
EXXON COMPANY USA |
Forced |
48.20 |
48.20 |
SCE Gen |
GRIDLY_6_SOLAR |
GRIDLEY MAIN TWO |
Forced |
2.50 |
2.50 |
PGAE Gen |
GRSCRK_6_BGCKWW |
BIG CREEK WATER WORKS - CEDAR FLAT |
Forced |
5.00 |
5.00 |
PGAE Gen |
GWFPWR_1_UNITS |
Hanford Peaker Plant |
Forced |
98.46 |
0.00 |
PGAE Gen |
GYS5X6_7_UNITS |
GEYSERS UNITS 5 & 6 AGGREGATE |
Forced |
85.00 |
85.00 |
PGAE Gen |
GYS7X8_7_UNITS |
GEYSERS UNITS 7 & 8 AGGREGATE |
Forced |
82.00 |
0.00 |
PGAE Gen |
HATLOS_6_LSCRK |
Lost Creek 1 & 2 Hydro Conversion |
Forced |
1.70 |
0.67 |
PGAE Gen |
HAYPRS_6_QFUNTS |
HAYPRESS HYDRO QF UNITS |
Forced |
14.80 |
14.80 |
PGAE North |
HELMPG_7_UNIT 2 |
HELMS PUMP-GEN UNIT 2 |
Planned/Forced |
407.00 |
407.00 |
PGAE South |
HIDSRT_2_UNITS |
HIGH DESERT POWER PROJECT AGGREGATE |
Forced |
830.00 |
21.00 |
SCE Gen |
HMLTBR_6_UNITS |
HAMILTON BRANCH PH (AGGREGATE) |
Forced |
4.90 |
4.90 |
PGAE Gen |
HNTGBH_7_UNIT 1 |
HUNTINGTON BEACH GEN STA. UNIT 1 |
Planned |
225.75 |
225.75 |
SCE Gen |
HYTTHM_2_UNITS |
HYATT-THERMALITO PUMP-GEN (AGGREGATE) |
Planned/Forced |
933.10 |
555.10 |
PGAE Gen |
INTKEP_2_UNITS |
CCSF Hetch_Hetchy Hydro Aggregate |
Planned |
405.00 |
293.00 |
PGAE Gen |
IVSLR2_2_SM2SR1 |
Silver Ridge Mount Signal 2 |
Forced |
150.00 |
0.00 |
SDGE Gen |
JAWBNE_2_SRWND |
Sky River |
Planned |
77.00 |
77.00 |
SCE Gen |
KANSAS_6_SOLAR |
RE Kansas South |
Forced |
20.00 |
0.00 |
PGAE South |
KEKAWK_6_UNIT |
STS HYDROPOWER LTD. (KEKAWAKA) |
Forced |
5.50 |
5.50 |
PGAE Gen |
KELSO_2_UNITS |
Mariposa Energy |
Forced |
198.03 |
10.03 |
PGAE Gen |
KELYRG_6_UNIT |
KELLY RIDGE HYDRO |
Planned |
11.00 |
11.00 |
PGAE North |
KERNRG_1_UNITS |
South Belridge Cogen Facility |
Forced |
55.20 |
0.00 |
PGAE South |
KERRGN_1_UNIT 1 |
KERN RIVER HYDRO UNITS 1-4 AGGREGATE |
Planned |
25.60 |
7.60 |
SCE Gen |
KNGBRG_1_KBSLR1 |
Kingsburg1 |
Forced |
1.50 |
0.00 |
PGAE South |
KNGBRG_1_KBSLR2 |
Kingsburg2 |
Forced |
1.50 |
0.00 |
PGAE South |
LAPLMA_2_UNIT 1 |
La Paloma Generating Plant Unit #1 |
Forced |
259.80 |
0.00 |
PGAE Gen |
LAPLMA_2_UNIT 2 |
La Paloma Generating Plant Unit #2 |
Forced |
260.20 |
1.20 |
PGAE Gen |
LAPLMA_2_UNIT 4 |
LA PALOMA GENERATING PLANT, UNIT #4 |
Forced |
253.29 |
5.29 |
PGAE Gen |
LAROA2_2_UNITA1 |
LR2 |
Forced |
322.00 |
4.00 |
SDGE Gen |
LEPRFD_1_KANSAS |
Kansas |
Forced |
20.00 |
0.00 |
PGAE Gen |
LITLRK_6_SOLAR1 |
Lancaster Little Rock C |
Forced |
5.00 |
0.00 |
SCE Gen |
LITLRK_6_SOLAR2 |
Palmdale 18 |
Forced |
2.00 |
0.00 |
SCE Gen |
LMEC_1_PL1X3 |
Los Medanos Energy Center AGGREGATE |
Forced |
580.00 |
0.00 |
PGAE Gen |
LODI25_2_UNIT 1 |
LODI GAS TURBINE |
Forced |
25.00 |
2.00 |
PGAE Gen |
LODIEC_2_PL1X2 |
Lodi Energy Center |
Forced |
302.58 |
16.58 |
PGAE Gen |
MAGUND_1_BKISR1 |
Bakersfield Industrial 1 |
Forced |
1.00 |
0.00 |
PGAE Gen |
MAGUND_1_BKSSR2 |
Bakersfield Solar 1 |
Forced |
5.25 |
0.00 |
PGAE Gen |
MALCHQ_7_UNIT 1 |
MALACHA HYDRO L.P. |
Planned/Forced |
32.50 |
32.50 |
PGAE Gen |
MALIN_5_GCPDDYN |
Grant County Hydro Facilities |
Forced |
125.00 |
0.00 |
PGAE Gen |
MANTEC_1_ML1SR1 |
Manteca Land 1 |
Forced |
1.00 |
0.00 |
PGAE Gen |
METEC_2_PL1X3 |
Metcalf Energy Center |
Forced |
593.16 |
4.16 |
PGAE Gen |
MIDWD_6_WNDLND |
Windland Refresh 1 |
Forced |
7.45 |
0.00 |
SCE Gen |
MIRLOM_2_MLBBTA |
Mira Loma BESS A |
Planned |
10.00 |
0.00 |
SCE Gen |
MIRLOM_2_MLBBTB |
Mira Loma BESS B |
Planned |
10.00 |
0.00 |
SCE Gen |
MIRLOM_2_TEMESC |
MWD Temescal Hydroelectric Recovery Plan |
Planned |
2.85 |
2.85 |
SCE Gen |
MOJAVW_2_SOLAR |
Mojave West |
Forced |
20.00 |
0.00 |
SCE Gen |
MONLTH_6_BOREL |
BOREL HYDRO UNITS 1-3 AGGREGATE |
Forced |
11.00 |
11.00 |
SCE Gen |
MONLTS_2_MONWD4 |
Monolith 4 |
Planned/Forced |
4.75 |
3.05 |
SCE Gen |
MORWD_6_QF |
Morwind |
Forced |
38.16 |
0.00 |
SCE Gen |
MOSSLD_2_PSP1 |
MOSS LANDING POWER BLOCK 1 |
Forced |
510.00 |
0.00 |
PGAE South |
MOSSLD_2_PSP2 |
MOSS LANDING POWER BLOCK 2 |
Forced |
510.00 |
0.00 |
PGAE South |
MRCHNT_2_PL1X3 |
Desert Star Energy Center |
Forced |
494.58 |
4.58 |
SDGE Gen |
MTWIND_1_UNIT 1 |
Mountain View Power Project I |
Planned |
44.40 |
6.00 |
SCE Gen |
MTWIND_1_UNIT 2 |
Mountain View Power Project II |
Planned |
22.20 |
0.60 |
SCE Gen |
MTWIND_1_UNIT 3 |
Mountain View Power Project III |
Forced |
22.44 |
10.56 |
SCE Gen |
NAROW2_2_UNIT |
Narrows Powerhouse Unit 2 |
Planned |
55.00 |
38.00 |
PGAE North |
NCPA_7_GP1UN1 |
NCPA GEO PLANT 1 UNIT 1 |
Forced |
38.85 |
38.85 |
PGAE Gen |
NCPA_7_GP1UN2 |
NCPA GEO PLANT 1 UNIT 2 |
Forced |
34.00 |
34.00 |
PGAE Gen |
NCPA_7_GP2UN3 |
NCPA GEO PLANT 2 UNIT 3 |
Forced |
42.42 |
42.42 |
PGAE Gen |
NEENCH_6_SOLAR |
Alpine Solar |
Forced |
66.00 |
0.00 |
SCE Gen |
OAK C_7_UNIT 1 |
OAKLAND STATION C GT UNIT 1 |
Forced |
55.00 |
1.50 |
PGAE South |
OAK C_7_UNIT 3 |
OAKLAND STATION C GT UNIT 3 |
Forced |
55.00 |
1.00 |
PGAE South |
OAKWD_6_QF |
Oak Creek |
Forced |
27.87 |
0.00 |
SCE Gen |
OILFLD_7_QFUNTS |
Nacimiento Hydroelectric Plant |
Planned |
3.80 |
3.58 |
PGAE South |
OLINDA_2_COYCRK |
MWD Coyote Creek Hydroelectric Recovery |
Forced |
3.13 |
3.13 |
SCE Gen |
OLINDA_2_LNDFL2 |
Brea Power II |
Forced |
28.10 |
2.60 |
SCE Gen |
OTMESA_2_PL1X3 |
OTAY MESA ENERGY CENTER |
Forced |
603.68 |
3.68 |
SDGE Gen |
PACLUM_6_UNIT |
Humboldt Redwood |
Forced |
28.80 |
6.80 |
PGAE North |
PADUA_2_ONTARO |
ONTARIO/SIERRA HYDRO PSP |
Planned |
1.92 |
0.92 |
SCE Gen |
PANSEA_1_PANARO |
Mesa Wind Project |
Planned |
30.00 |
21.81 |
SCE Gen |
PARDEB_6_UNITS |
Pardee Power House |
Planned/Forced |
30.00 |
30.00 |
PGAE Gen |
PEORIA_1_SOLAR |
Sonora 1 |
Forced |
1.50 |
0.00 |
PGAE Gen |
PINFLT_7_UNITS |
PINE FLAT HYDRO AGGREGATE |
Planned |
210.00 |
210.00 |
PGAE Gen |
PIOPIC_2_CTG1 |
Pio Pico Unit 1 |
Forced |
111.30 |
1.88 |
SDGE Gen |
PIOPIC_2_CTG2 |
Pio Pico Unit 2 |
Forced |
112.70 |
0.42 |
SDGE Gen |
PIOPIC_2_CTG3 |
Pio Pico Unit 3 |
Forced |
112.00 |
0.20 |
SDGE Gen |
PIT7_7_UNIT 2 |
PIT PH 7 UNIT 2 |
Planned |
54.60 |
54.60 |
PGAE North |
PLAINV_6_BSOLAR |
Western Antelope Blue Sky Ranch A |
Forced |
20.00 |
4.00 |
SCE Gen |
PLMSSR_6_HISIER |
High Sierra Cogeneration Aggregate |
Forced |
6.00 |
2.99 |
PGAE Gen |
PMDLET_6_SOLAR1 |
SEPV Palmdale East, LLC |
Forced |
10.00 |
1.00 |
SCE Gen |
PNCHEG_2_PL1X4 |
PANOCHE ENERGY CENTER (Aggregated) |
Forced |
401.00 |
95.00 |
PGAE Gen |
PNOCHE_1_PL1X2 |
Panoche Peaker |
Forced |
49.97 |
4.97 |
PGAE South |
PNOCHE_1_UNITA1 |
CalPeak Power Panoche Unit 1 |
Forced |
52.01 |
4.01 |
PGAE Gen |
POEPH_7_UNIT 1 |
POE HYDRO UNIT 1 |
Planned |
69.00 |
69.00 |
PGAE North |
POEPH_7_UNIT 2 |
POE HYDRO UNIT 2 |
Planned |
68.50 |
68.50 |
PGAE North |
POTTER_6_UNITS |
Potter Valley |
Forced |
10.10 |
10.10 |
PGAE North |
PVERDE_5_SCEDYN |
PVERDE_5_SCEDYN |
Forced |
635.00 |
0.00 |
SCE Gen |
RAMON_2_SCEDYN |
RAMON_2_SCEDYN |
Forced |
359.60 |
282.60 |
SCE Gen |
RECTOR_2_CREST |
Rector Aggregate Solar Resources |
Forced |
14.00 |
0.00 |
SCE Gen |
RECTOR_2_KAWH 1 |
KAWEAH PH 1 UNIT 1 |
Forced |
2.25 |
2.25 |
SCE Gen |
REDOND_7_UNIT 8 |
REDONDO GEN STA. UNIT 8 |
Forced |
495.90 |
127.47 |
SCE Gen |
RICHMN_7_BAYENV |
BAY ENVIRONMENTAL (NOVE POWER) |
Forced |
2.50 |
1.70 |
PGAE Gen |
RIOBRV_6_UNIT 1 |
RIO BRAVO HYDRO |
Forced |
14.00 |
14.00 |
PGAE Gen |
ROSMDW_2_WIND1 |
Pacific Wind - Phase 1 |
Planned |
140.00 |
2.00 |
SCE Gen |
RVSIDE_6_RERCU1 |
Riverside Energy Res. Ctr Unit 1 |
Planned |
48.35 |
48.35 |
SCE Gen |
RVSIDE_6_SOLAR1 |
Tequesquite Landfill Solar Project |
Forced |
7.50 |
0.75 |
SCE Gen |
SANDLT_2_SUNITS |
Mojave Solar |
Planned |
275.00 |
137.50 |
SCE Gen |
SANTFG_7_UNITS |
GEYSERS CALISTOGA AGGREGATE |
Forced |
92.10 |
92.10 |
PGAE Gen |
SANWD_1_QF |
San Gorgonio Farms Wind Farm |
Planned |
31.00 |
3.20 |
SCE Gen |
SBERDO_2_PSP3 |
Mountainview Gen Sta. Unit 3 |
Forced |
555.00 |
0.00 |
SCE Gen |
SBERDO_2_PSP4 |
Mountainview Gen Sta. Unit 4 |
Forced |
555.00 |
0.00 |
SCE Gen |
SBERDO_2_SNTANA |
SANTA ANA PSP |
Planned/Forced |
6.95 |
6.95 |
SCE Gen |
SBERDO_6_MILLCK |
MILL CREEK PSP |
Planned |
3.93 |
1.03 |
SCE Gen |
SCEHOV_2_HOOVER |
SCEHOV_2_HOOVER |
Forced |
287.01 |
130.01 |
SCE Gen |
SLST13_2_SOLAR1 |
Quinto Solar PV Project |
Forced |
107.60 |
6.60 |
PGAE Gen |
SLSTR1_2_SOLAR1 |
Solar Star 1 |
Forced |
310.00 |
0.00 |
SCE Gen |
SLUISP_2_UNITS |
SAN LUIS (GIANELLI) PUMP-GEN (AGGREGATE) |
Planned |
374.43 |
80.43 |
PGAE Gen |
SMUDGO_7_UNIT 1 |
SONOMA POWER PLANT |
Forced |
53.00 |
53.00 |
PGAE Gen |
SMYRNA_1_DL1SR1 |
Delano Land 1 |
Forced |
1.00 |
0.00 |
PGAE Gen |
SNCLRA_2_UNIT1 |
New Indy Oxnard |
Planned |
27.80 |
16.80 |
SCE Gen |
SPBURN_2_UNIT 1 |
Burney Biomass |
Forced |
22.00 |
17.00 |
PGAE North |
SPIFBD_1_PL1X2 |
SIERRA PACIFIC IND. (SONORA) |
Forced |
7.50 |
0.00 |
PGAE Gen |
SPOINT_2_MEADDYN |
SPOINT_2_MEADDYN |
Forced |
325.00 |
325.00 |
SCE Gen |
SPOINT_2_PARKERDYN |
Southpoint Energy Center |
Planned |
200.00 |
200.00 |
SCE Gen |
SPRGVL_2_TULE |
TULE RIVER HYDRO PLANT (PG&E) |
Forced |
6.40 |
6.40 |
SCE Gen |
SPRGVL_2_TULESC |
TULE RIVER HYDRO PLANT (SCE) |
Forced |
2.50 |
2.50 |
SCE Gen |
SUMWHT_6_SWSSR1 |
Summer Wheat Solar Farm |
Forced |
18.50 |
0.90 |
PGAE Gen |
SUNRIS_2_PL1X3 |
Sunrise Power Project AGGREGATE II |
Forced |
586.02 |
9.02 |
PGAE Gen |
SUNSET_2_UNITS |
MIDWAY SUNSET COGENERATION PLANT |
Forced |
248.00 |
12.00 |
PGAE South |
SUNSLR_1_SSVSR1 |
Sunshine Valley Solar 1 |
Forced |
100.00 |
0.00 |
VEA Gen |
SUTTER_2_TESLADYN |
Sutter Energy Center Dynamic 2 |
Forced |
270.00 |
270.00 |
PGAE Gen |
SUTTER_2_WASNDYN |
Sutter Energy Center Dynamic |
Forced |
270.00 |
270.00 |
PGAE Gen |
SWIFT_1_NAS |
YERBA BUENA BATTERY |
Forced |
4.80 |
4.80 |
PGAE South |
SYCAMR_2_UNIT 1 |
Sycamore Cogeneration Unit 1 |
Planned/Forced |
80.00 |
0.00 |
SCE Gen |
SYCAMR_2_UNIT 2 |
Sycamore Cogeneration Unit 2 |
Forced |
80.00 |
2.00 |
SCE Gen |
SYCAMR_2_UNIT 3 |
Sycamore Cogeneration Unit 3 |
Forced |
80.00 |
2.50 |
SCE Gen |
SYCAMR_2_UNIT 4 |
Sycamore Cogeneration Unit 4 |
Forced |
80.00 |
4.00 |
SCE Gen |
TENGEN_2_PL1X2 |
Berry Cogen 42 |
Forced |
40.20 |
0.00 |
SCE Gen |
TIFFNY_1_DILLON |
TIFFNY_1_DILLON |
Forced |
45.00 |
0.00 |
SCE Gen |
TRNQLT_2_SOLAR |
Tranquillity |
Forced |
200.00 |
0.00 |
PGAE Gen |
TWISSL_6_SOLAR |
Nickel 1 ("NLH1") |
Forced |
1.50 |
0.00 |
PGAE Gen |
TWISSL_6_SOLAR1 |
Coronal Lost Hills |
Forced |
20.00 |
0.00 |
PGAE Gen |
TXMCKT_6_UNIT |
McKittrick Cogen |
Forced |
11.20 |
11.20 |
PGAE South |
UNCHEM_1_UNIT |
CONTRA COSTA CARBON PLANT |
Forced |
19.00 |
8.00 |
PGAE Gen |
USWND2_1_WIND3 |
Golden Hills C |
Forced |
46.00 |
4.60 |
PGAE Gen |
VACADX_1_NAS |
VACA-DIXON BATTERY |
Forced |
1.85 |
1.85 |
PGAE North |
VACADX_1_SOLAR |
Vaca-Dixon Solar Station |
Forced |
2.50 |
0.50 |
PGAE North |
VACADX_1_UNITA1 |
CalPeak Power Vaca Dixon Unit 1 |
Forced |
50.61 |
2.61 |
PGAE Gen |
VALLEY_5_PERRIS |
MWD Perris Hydroelectric Recovery Plant |
Forced |
7.94 |
0.00 |
SCE Gen |
VALLEY_5_REDMTN |
MWD Red Mountain Hydroelectric Recovery |
Planned |
5.90 |
2.90 |
SCE Gen |
VALTNE_2_AVASR1 |
Valentine Solar |
Forced |
100.00 |
100.00 |
SCE Gen |
VENWD_1_WIND1 |
Windpark Unlimited 1 |
Forced |
9.43 |
9.43 |
SCE Gen |
VENWD_1_WIND2 |
Windpark Unlimited 2 |
Forced |
16.05 |
16.05 |
SCE Gen |
VENWD_1_WIND3 |
Painted Hills Windpark |
Forced |
19.04 |
19.04 |
SCE Gen |
VERNON_6_GONZL1 |
H. Gonzales Unit #1 |
Forced |
5.75 |
5.75 |
SCE Gen |
VILLPK_2_VALLYV |
MWD Valley View Hydroelectric Recovery P |
Forced |
4.10 |
4.10 |
SCE Gen |
VINCNT_2_WESTWD |
Oasis Power Plant |
Forced |
59.00 |
59.00 |
SCE Gen |
VOLTA_2_UNIT 2 |
Volta Hydro Unit 2 |
Forced |
1.00 |
1.00 |
PGAE North |
VOLTA_7_QFUNTS |
VOLTA_7_QFUNTS |
Forced |
1.30 |
1.30 |
PGAE North |
VSTAES_6_VESBT1 |
Vista Energy Storage |
Forced |
40.00 |
2.00 |
SDGE Gen |
WALCRK_2_CTG1 |
Walnut Creek Energy Park Unit 1 |
Forced |
96.43 |
0.00 |
SCE Gen |
WALCRK_2_CTG2 |
Walnut Creek Energy Park Unit 2 |
Forced |
96.91 |
0.00 |
SCE Gen |
WALCRK_2_CTG3 |
Walnut Creek Energy Park Unit 3 |
Forced |
96.65 |
0.00 |
SCE Gen |
WALCRK_2_CTG4 |
Walnut Creek Energy Park Unit 4 |
Forced |
96.49 |
0.00 |
SCE Gen |
WALCRK_2_CTG5 |
Walnut Creek Energy Park Unit 5 |
Forced |
96.65 |
0.00 |
SCE Gen |
WARNE_2_UNIT |
WARNE HYDRO AGGREGATE |
Planned |
76.00 |
76.00 |
SCE Gen |
WFRESN_1_SOLAR |
Joya Del Sol |
Forced |
1.50 |
0.00 |
PGAE Gen |
WISE_1_UNIT 2 |
WISE HYDRO UNIT 2 |
Forced |
3.20 |
3.20 |
PGAE North |
WNDMAS_2_UNIT 1 |
BUENA VISTA ENERGY, LLC |
Forced |
38.00 |
1.00 |
PGAE Gen |
WRGHTP_7_AMENGY |
SMALL QF AGGREGATION - LOS BANOS |
Forced |
2.50 |
1.50 |
PGAE Gen |
ZOND_6_UNIT |
ZOND WINDSYSTEMS INC. |
Forced |
17.10 |
17.10 |
PGAE Gen |