ADLIN_1_UNITS |
GEYSERS AIDLIN AGGREGATE |
Forced |
22.00 |
10.00 |
PGAE Gen |
ALAMIT_2_PL1X3 |
Alamitos Energy Center Unit 7 |
Forced |
674.70 |
10.70 |
SCE Gen |
ALAMIT_7_UNIT 3 |
ALAMITOS GEN STA. UNIT 3 |
Forced |
321.40 |
6.40 |
SCE Gen |
ALAMIT_7_UNIT 4 |
ALAMITOS GEN STA. UNIT 4 |
Forced |
335.67 |
315.66 |
SCE Gen |
ALAMIT_7_UNIT 5 |
ALAMITOS GEN STA. UNIT 5 |
Forced |
480.00 |
14.00 |
SCE Gen |
ALMEGT_1_UNIT 1 |
ALAMEDA GT UNIT 1 |
Forced |
25.00 |
3.00 |
PGAE South |
ALMEGT_1_UNIT 2 |
ALAMEDA GT UNIT 2 |
Forced |
25.00 |
3.00 |
PGAE South |
ALTA3A_2_CPCE4 |
Alta Wind 4 |
Forced |
102.00 |
9.00 |
SCE Gen |
ALTA3A_2_CPCE5 |
Alta Wind 5 |
Forced |
168.00 |
9.00 |
SCE Gen |
ALTA3A_2_CPCE8 |
Alta Wind 8 |
Forced |
150.00 |
6.00 |
SCE Gen |
ALTA4A_2_CPCW1 |
Alta Wind 1 |
Forced |
150.00 |
3.00 |
SCE Gen |
ALTA4B_2_CPCW2 |
Alta Wind 2 |
Forced |
150.00 |
6.00 |
SCE Gen |
ALTA4B_2_CPCW3 |
Alta Wind 3 |
Forced |
150.00 |
3.00 |
SCE Gen |
ALTA6B_2_WIND11 |
Alta Wind 11 |
Forced |
90.00 |
11.40 |
SCE Gen |
ALTA6E_2_WIND10 |
Alta Wind 10 |
Forced |
138.00 |
15.50 |
SCE Gen |
ANZA_6_SOLAR1 |
Seville Solar One |
Forced |
20.00 |
0.00 |
SDGE Gen |
BASICE_2_UNITS |
King City Cogen |
Forced |
120.00 |
1.00 |
PGAE Gen |
BCTSYS_5_PWXDYN |
BCTSYS_5_PWXDYN |
Forced |
428.00 |
428.00 |
PGAE Gen |
BDGRCK_1_UNITS |
BADGER CREEK LIMITED |
Forced |
48.08 |
6.08 |
PGAE South |
BEARMT_1_UNIT |
Bear Mountain Limited |
Forced |
49.21 |
5.21 |
PGAE Gen |
BELDEN_7_UNIT 1 |
BELDEN HYDRO |
Forced |
119.00 |
72.43 |
PGAE Gen |
BGSKYN_2_AS2SR1 |
Antelope Solar 2 |
Forced |
105.00 |
0.00 |
SCE Gen |
BGSKYN_2_ASPSR2 |
Antelope Solar 2 San Pablo |
Forced |
100.00 |
0.00 |
SCE Gen |
BGSKYN_2_BS3SR3 |
Big Sky Solar 3 |
Forced |
20.00 |
0.00 |
SCE Gen |
BIGCRK_2_EXESWD |
BIG CREEK HYDRO PROJECT PSP |
Forced |
820.00 |
387.00 |
SCE Gen |
BIGSKY_2_BSKSR6 |
Big Sky Solar 6 |
Forced |
20.00 |
0.00 |
SCE Gen |
BIGSKY_2_BSKSR7 |
Big Sky Solar 7 |
Forced |
20.00 |
0.00 |
SCE Gen |
BIGSKY_2_BSKSR8 |
Big Sky Solar 8 |
Forced |
20.00 |
0.00 |
SCE Gen |
BIGSKY_2_SOLAR2 |
Big Sky Solar 4 |
Forced |
40.00 |
0.00 |
SCE Gen |
BIGSKY_2_SOLAR3 |
Big Sky Summer |
Forced |
20.00 |
0.00 |
SCE Gen |
BIGSKY_2_SOLAR4 |
Western Antelope Blue Sky Ranch B |
Forced |
20.00 |
0.00 |
SCE Gen |
BIGSKY_2_SOLAR5 |
Big Sky Solar 2 |
Forced |
5.00 |
0.00 |
SCE Gen |
BIGSKY_2_SOLAR6 |
Solverde 1 |
Forced |
85.00 |
0.00 |
SCE Gen |
BIGSKY_2_SOLAR7 |
Big Sky Solar 1 |
Forced |
50.00 |
0.00 |
SCE Gen |
BIOMAS_1_UNIT 1 |
WOODLAND BIOMASS |
Forced |
25.50 |
25.50 |
PGAE North |
BISHOP_1_ALAMO |
BISHOP CREEK PLANT 2 AND 6 |
Forced |
13.40 |
5.40 |
SCE Gen |
BISHOP_1_UNITS |
BISHOP CREEK PLANT 3 AND 4 |
Forced |
15.80 |
4.80 |
SCE Gen |
BLACK_7_UNIT 1 |
JAMES B. BLACK 1 |
Forced |
85.00 |
0.00 |
PGAE North |
BLACK_7_UNIT 2 |
JAMES B. BLACK 2 |
Forced |
84.10 |
0.00 |
PGAE North |
BLYTHE_1_SOLAR1 |
Blythe Solar 1 Project |
Forced |
21.00 |
3.00 |
SCE Gen |
BRDSLD_2_HIWIND |
High Winds Energy Center |
Forced |
162.00 |
16.20 |
PGAE Gen |
BRDSLD_2_MTZUM2 |
NextEra Energy Montezuma Wind II |
Forced |
78.20 |
0.00 |
PGAE Gen |
BRDSLD_2_MTZUMA |
FPL Energy Montezuma Wind |
Forced |
36.80 |
0.30 |
PGAE Gen |
BRDSLD_2_SHILO1 |
Shiloh I Wind Project |
Forced |
150.00 |
0.00 |
PGAE Gen |
BRDSLD_2_SHILO2 |
SHILOH WIND PROJECT 2 |
Forced |
150.00 |
0.00 |
PGAE Gen |
BRDSLD_2_SHLO3A |
Shiloh III Wind Project, LLC |
Forced |
102.50 |
0.00 |
PGAE Gen |
BRDSLD_2_SHLO3B |
Shiloh IV Wind Project |
Forced |
100.00 |
0.00 |
PGAE Gen |
BRODIE_2_WIND |
Coram Brodie Wind Project |
Forced |
102.00 |
3.00 |
SCE Gen |
BUCKBL_2_PL1X3 |
Blythe Energy Center |
Forced |
493.63 |
0.00 |
SCE Gen |
BUCKCK_7_OAKFLT |
Oak Flat |
Forced |
1.30 |
1.30 |
PGAE Gen |
BUCKCK_7_PL1X2 |
BUCKS CREEK AGGREGATE |
Planned/Forced |
57.25 |
57.25 |
PGAE Gen |
BUCKWD_1_QF |
Buckwind Re-powering project |
Forced |
16.50 |
6.00 |
SCE Gen |
CALGEN_1_UNITS |
Coso Navy 1 |
Forced |
80.00 |
29.00 |
SCE Gen |
CALPIN_1_AGNEW |
Agnews Power Plant |
Forced |
28.56 |
0.80 |
PGAE Gen |
CAMCHE_1_PL1X3 |
CAMANCHE UNITS 1, 2 & 3 AGGREGATE |
Forced |
9.99 |
9.09 |
PGAE Gen |
CARBOU_7_PL2X3 |
CARIBOU PH 1 UNIT 2 & 3 AGGREGATE |
Forced |
49.00 |
49.00 |
PGAE North |
CARBOU_7_PL4X5 |
CARIBOU PH 2 UNIT 4 & 5 AGGREGATE |
Forced |
120.00 |
22.00 |
PGAE North |
CARBOU_7_UNIT 1 |
CARIBOU PH 1 UNIT 1 |
Planned/Forced |
24.00 |
24.00 |
PGAE North |
CARLS1_2_CARCT1 |
Carlsbad 1 |
Planned/Forced |
422.00 |
5.01 |
SDGE Gen |
CARLS2_1_CARCT1 |
Carlsbad 2 |
Planned/Forced |
105.50 |
2.36 |
SDGE Gen |
CAVLSR_2_BSOLAR |
California Valley Solar Ranch-Phase B |
Forced |
40.00 |
0.00 |
PGAE Gen |
CAVLSR_2_RSOLAR |
California Valley Solar Ranch-Phase A |
Forced |
210.00 |
0.00 |
PGAE Gen |
CENTER_2_RHONDO |
MWD Rio Hondo Hydroelectric Recovery Pla |
Forced |
1.91 |
1.91 |
SCE Gen |
CENTER_6_PEAKER |
Center Peaker |
Forced |
47.11 |
8.11 |
SCE Gen |
CHALK_1_UNIT |
CHALK CLIFF LIMITED |
Forced |
48.67 |
6.67 |
PGAE Gen |
CHICPK_7_UNIT 1 |
Chicago Park Powerhouse |
Forced |
42.00 |
28.00 |
PGAE North |
CHINO_2_SASOLR |
SS San Antonio West LLC |
Forced |
1.50 |
0.00 |
SCE Gen |
CHINO_7_MILIKN |
MN Milliken Genco LLC |
Planned |
1.90 |
1.90 |
SCE Gen |
CLOVDL_1_SOLAR |
Cloverdale Solar I |
Forced |
1.50 |
0.00 |
PGAE Gen |
CLOVER_2_UNIT |
Clover Creek |
Forced |
0.99 |
0.99 |
PGAE Gen |
CLRKRD_6_LIMESD |
Lime Saddle Hydro |
Forced |
2.00 |
2.00 |
PGAE Gen |
CNTRVL_6_UNIT |
Centerville |
Forced |
6.40 |
6.40 |
PGAE Gen |
COCOPP_2_CTG1 |
Marsh Landing 1 |
Forced |
204.20 |
6.08 |
PGAE South |
COCOPP_2_CTG2 |
Marsh Landing 2 |
Forced |
202.70 |
5.37 |
PGAE South |
COCOPP_2_CTG3 |
Marsh Landing 3 |
Forced |
208.96 |
12.41 |
PGAE South |
COCOPP_2_CTG4 |
Marsh Landing 4 |
Forced |
204.29 |
6.37 |
PGAE South |
COCOSB_6_SOLAR |
Oakley Solar Project |
Forced |
1.50 |
0.00 |
PGAE Gen |
COLEMN_2_UNIT |
Coleman |
Forced |
13.00 |
13.00 |
PGAE North |
COLGAT_7_UNIT 1 |
Colgate Powerhouse Unit 1 |
Planned |
176.72 |
22.72 |
PGAE North |
COLGAT_7_UNIT 2 |
Colgate Powerhouse Unit 2 |
Planned |
175.67 |
21.67 |
PGAE North |
COLTON_6_AGUAM1 |
AGUA MANSA UNIT 1 (CITY OF COLTON) |
Forced |
43.00 |
2.00 |
SCE Gen |
COLUSA_2_PL1X3 |
Colusa Generating Station |
Forced |
641.00 |
33.64 |
PGAE North |
CONTRL_1_CASAD1 |
Mammoth G1 |
Forced |
10.00 |
0.00 |
SCE Gen |
CONTRL_1_LUNDY |
LUNDY |
Forced |
3.00 |
2.61 |
SCE Gen |
CONTRL_1_OXBOW |
Dixie Valley Geo |
Forced |
60.00 |
3.50 |
SCE Gen |
CONTRL_1_POOLE |
POOLE HYDRO PLANT 1 |
Forced |
10.90 |
10.90 |
SCE Gen |
CONTRL_1_RUSHCK |
RUSH CREEK |
Forced |
11.94 |
9.94 |
SCE Gen |
CORONS_6_CLRWTR |
Clearwater Power Plant |
Forced |
28.00 |
28.00 |
SCE Gen |
COVERD_2_HCKHY1 |
HATCHET CREEK |
Forced |
6.89 |
6.89 |
PGAE Gen |
COVERD_2_MCKHY1 |
Montgomery Creek Hydro |
Forced |
2.80 |
2.80 |
PGAE Gen |
COVERD_2_RCKHY1 |
ROARING CREEK |
Forced |
2.00 |
2.00 |
PGAE Gen |
COWCRK_2_UNIT |
Cow Creek Hydro |
Forced |
2.00 |
1.80 |
PGAE Gen |
CPVERD_2_SOLAR |
Campo Verde Solar |
Forced |
139.00 |
0.00 |
SDGE Gen |
CRESTA_7_PL1X2 |
CRESTA PH UNIT 1 & 2 AGGREGATE |
Forced |
70.40 |
70.40 |
PGAE North |
CRNEVL_6_CRNVA |
Crane Valley |
Forced |
0.90 |
0.90 |
PGAE Gen |
CRNEVL_6_SJQN 2 |
SAN JOAQUIN 2 |
Forced |
3.20 |
3.20 |
PGAE Gen |
CRNEVL_6_SJQN 3 |
SAN JOAQUIN 3 |
Forced |
4.20 |
4.20 |
PGAE Gen |
CRSTWD_6_KUMYAY |
Kumeyaay Wind Farm |
Forced |
50.00 |
2.00 |
SDGE Gen |
CSCCOG_1_UNIT 1 |
SANTA CLARA CO-GEN |
Forced |
7.00 |
0.00 |
PGAE South |
CSCGNR_1_UNIT 1 |
GIANERA PEAKER UNIT 1 |
Forced |
24.75 |
2.15 |
PGAE South |
CSCGNR_1_UNIT 2 |
GIANERA PEAKER UNIT 2 |
Forced |
24.75 |
2.15 |
PGAE South |
CSTRVL_7_PL1X2 |
Marina Land Fill Gas |
Forced |
4.53 |
0.13 |
PGAE South |
CUMMNG_6_SUNCT1 |
SunSelect 1 |
Forced |
4.00 |
2.15 |
SCE Gen |
DAIRLD_1_MD2BM1 |
Madera Digester Genset 2 |
Forced |
0.80 |
0.00 |
PGAE Gen |
DAVIS_1_SOLAR1 |
Grasslands 3 |
Forced |
1.00 |
0.00 |
PGAE Gen |
DAVIS_1_SOLAR2 |
Grasslands 4 |
Forced |
1.00 |
0.00 |
PGAE Gen |
DELAMO_2_SOLAR1 |
Golden Springs Building H |
Forced |
1.50 |
0.00 |
SCE Gen |
DELAMO_2_SOLAR2 |
Golden Springs Building M |
Forced |
1.75 |
0.00 |
SCE Gen |
DELAMO_2_SOLRC1 |
Golden Springs Building C1 |
Forced |
1.16 |
0.00 |
SCE Gen |
DELAMO_2_SOLRD |
Golden Solar Building D |
Forced |
1.25 |
0.00 |
SCE Gen |
DELSUR_6_CREST |
Delsur Aggregate Solar Resources |
Forced |
10.00 |
0.00 |
SCE Gen |
DELTA_2_PL1X4 |
DELTA ENERGY CENTER AGGREGATE |
Forced |
880.00 |
328.00 |
PGAE Gen |
DEVERS_1_SOLAR1 |
SEPV8 |
Forced |
12.00 |
0.00 |
SCE Gen |
DMDVLY_1_UNITS |
DIAMOND VALLEY LAKE PUMP-GEN PLANT |
Forced |
21.00 |
21.00 |
SCE Gen |
DONNLS_7_UNIT |
Donnells Hydro |
Forced |
72.00 |
3.50 |
PGAE Gen |
DOUBLC_1_UNITS |
DOUBLE "C" LIMITED |
Forced |
52.23 |
3.73 |
PGAE South |
DRACKR_2_DS4SR4 |
Dracker Solar Unit 4 |
Forced |
125.00 |
62.50 |
SCE Gen |
DREWS_6_PL1X4 |
Drews Generating Plant |
Forced |
41.40 |
20.70 |
SCE Gen |
DRUM_7_PL1X2 |
Drum PH 1 Units 1 & 2 Aggregate |
Forced |
26.00 |
26.00 |
PGAE North |
DRUM_7_PL3X4 |
Drum PH 1 Units 3 & 4 Aggregate |
Forced |
28.90 |
28.90 |
PGAE North |
DRUM_7_UNIT 5 |
DRUM PH 2 UNIT 5 |
Forced |
50.00 |
8.00 |
PGAE North |
DSABLA_7_UNIT |
De Sabla Hydro |
Forced |
18.50 |
18.50 |
PGAE North |
DSFLWR_2_WS2SR1 |
Willow Springs 2 |
Forced |
100.00 |
5.35 |
SCE Gen |
DSRTSL_2_SOLAR1 |
Desert Stateline |
Planned |
296.19 |
4.19 |
SCE Gen |
DUANE_1_PL1X3 |
DONALD VON RAESFELD POWER PROJECT |
Forced |
147.80 |
15.80 |
PGAE South |
DUTCH1_7_UNIT 1 |
DUTCH FLAT 1 PH |
Forced |
22.00 |
3.00 |
PGAE North |
DUTCH2_7_UNIT 1 |
DUTCH FLAT 2 PH |
Forced |
26.00 |
26.00 |
PGAE North |
DVLCYN_1_UNITS |
DEVIL CANYON HYDRO UNITS 1-4 AGGREGATE |
Forced |
235.00 |
0.00 |
SCE Gen |
EEKTMN_6_SOLAR1 |
EE K Solar 1 |
Forced |
20.00 |
20.00 |
PGAE South |
ELCABO_5_ECWSCEDYN |
El Cabo Wind |
Forced |
298.00 |
85.00 |
APS Gen |
ELCABO_5_ECWSCEDYN |
El Cabo Wind |
Forced |
298.00 |
85.00 |
SCE Gen |
ELCAJN_6_EB1BT1 |
Eastern BESS 1 |
Planned |
7.50 |
0.00 |
SDGE Gen |
ELCAJN_6_LM6K |
El Cajon Energy Center |
Forced |
48.10 |
0.00 |
SDGE Gen |
ELKCRK_6_STONYG |
STONEY GORGE HYDRO AGGREGATE |
Forced |
4.90 |
4.90 |
PGAE Gen |
ELKHIL_2_PL1X3 |
ELK HILLS COMBINED CYCLE (AGGREGATE) |
Forced |
551.70 |
34.70 |
PGAE Gen |
ELSEGN_2_UN1011 |
El Segundo Energy Center 5/6 |
Forced |
263.00 |
0.00 |
SCE Gen |
ELSEGN_2_UN2021 |
El Segundo Energy Center 7/8 |
Forced |
263.68 |
0.00 |
SCE Gen |
ENERSJ_2_WIND |
ESJ Wind Energy |
Forced |
155.10 |
3.30 |
SDGE Gen |
ESCNDO_6_EB2BT2 |
Escondido BESS 2 |
Planned |
10.00 |
1.25 |
SDGE Gen |
ESCNDO_6_PL1X2 |
MMC Escondido Aggregate |
Forced |
48.71 |
0.00 |
SDGE Gen |
ESQUON_6_LNDFIL |
Neal Road Landfill Generating Facility |
Forced |
2.10 |
0.90 |
PGAE Gen |
ETIWND_2_FONTNA |
FONTANALYTLE CREEK POWERHOUSE P |
Planned/Forced |
2.56 |
1.36 |
SCE Gen |
ETIWND_2_SOLAR5 |
Dulles |
Forced |
2.00 |
0.00 |
SCE Gen |
ETIWND_2_UNIT1 |
ETIWND_2_UNIT1 |
Planned |
33.60 |
32.60 |
SCE Gen |
ETIWND_6_MWDETI |
ETIWANDA RECOVERY HYDRO |
Forced |
24.00 |
24.00 |
SCE Gen |
EXCLSG_1_SOLAR |
Excelsior Solar |
Forced |
60.00 |
0.00 |
PGAE Gen |
FAIRHV_6_UNIT |
FAIRHAVEN POWER CO. |
Forced |
18.75 |
18.75 |
PGAE North |
FLOWD2_2_FPLWND |
DIABLO WINDS |
Forced |
18.00 |
2.30 |
PGAE Gen |
FORBST_7_UNIT 1 |
FORBESTOWN HYDRO |
Forced |
37.50 |
37.50 |
PGAE North |
FROGTN_1_UTICAA |
Angels Powerhouse |
Forced |
1.40 |
1.40 |
PGAE Gen |
FROGTN_1_UTICAM |
Murphys Powerhouse |
Forced |
3.60 |
1.90 |
PGAE Gen |
GARNET_1_SOLAR2 |
Garnet Solar Power Generation Station 1 |
Forced |
4.00 |
0.50 |
SCE Gen |
GARNET_1_UNITS |
GARNET GREEN POWER PROJECT AGGREGATE |
Forced |
16.50 |
10.50 |
SCE Gen |
GARNET_1_WINDS |
Garnet Winds Aggregation |
Forced |
22.50 |
4.50 |
SCE Gen |
GARNET_2_DIFWD1 |
Difwind |
Forced |
7.88 |
7.88 |
SCE Gen |
GARNET_2_HYDRO |
Whitewater Hydro |
Forced |
1.00 |
1.00 |
SCE Gen |
GARNET_2_WIND2 |
Karen Avenue Wind Farm |
Planned |
11.70 |
3.00 |
SCE Gen |
GARNET_2_WPMWD6 |
WINTEC PALM |
Forced |
5.93 |
5.93 |
SCE Gen |
GATES_2_SOLAR |
Gates Solar Station |
Forced |
20.00 |
2.00 |
PGAE South |
GATEWY_2_GESBT1 |
Gateway Energy Stroage |
Forced |
250.00 |
250.00 |
SDGE Gen |
GATWAY_2_PL1X3 |
GATEWAY GENERATING STATION |
Forced |
585.00 |
54.33 |
PGAE South |
GEYS11_7_UNIT11 |
GEYSERS UNIT 11 (HEALDSBURG) |
Forced |
74.40 |
1.40 |
PGAE Gen |
GEYS12_7_UNIT12 |
GEYSERS UNIT 12 (HEALDSBURG) |
Forced |
57.00 |
15.00 |
PGAE Gen |
GEYS13_7_UNIT13 |
GEYSERS UNIT 13 (HEALDSBURG) |
Forced |
95.00 |
46.00 |
PGAE Gen |
GEYS14_7_UNIT14 |
GEYSERS UNIT 14 (HEALDSBURG) |
Forced |
70.00 |
12.00 |
PGAE Gen |
GEYS16_7_UNIT16 |
GEYSERS UNIT 16 (HEALDSBURG) |
Forced |
85.00 |
40.00 |
PGAE Gen |
GEYS17_2_BOTRCK |
Bottle Rock Geothermal |
Forced |
10.01 |
10.01 |
PGAE North |
GEYS17_7_UNIT17 |
GEYSERS UNIT 17 (HEALDSBURG) |
Forced |
60.00 |
0.00 |
PGAE Gen |
GEYS18_7_UNIT18 |
GEYSERS UNIT 18 (HEALDSBURG) |
Forced |
72.00 |
26.00 |
PGAE Gen |
GEYS20_7_UNIT20 |
GEYSERS UNIT 20 (HEALDSBURG) |
Forced |
62.00 |
26.00 |
PGAE Gen |
GIFFEN_6_SOLAR1 |
Aspiration Solar G |
Forced |
9.00 |
0.00 |
PGAE Gen |
GILROY_1_UNIT |
GILROY COGEN AGGREGATE |
Forced |
120.00 |
120.00 |
PGAE South |
GILRPP_1_PL1X2 |
GILROY ENERGY CENTER UNITS 1&2 AGGREGATE |
Planned |
95.20 |
95.20 |
PGAE South |
GILRPP_1_PL3X4 |
GILROY ENERGY CENTER, UNIT #3 |
Planned |
46.20 |
46.20 |
PGAE South |
GLNARM_7_UNIT 1 |
GLEN ARM UNIT 1 |
Planned |
22.07 |
0.00 |
SCE Gen |
GLNARM_7_UNIT 2 |
GLEN ARM UNIT 2 |
Forced |
22.30 |
22.30 |
SCE Gen |
GLOW_6_SOLAR |
Antelope Power Plant |
Forced |
20.00 |
0.00 |
SCE Gen |
GOLETA_6_EXGEN |
EXXON COMPANY USA |
Forced |
48.20 |
48.20 |
SCE Gen |
GRIZLY_1_UNIT 1 |
GRIZZLY HYDRO |
Planned/Forced |
20.00 |
20.00 |
PGAE North |
GRNLF2_1_UNIT |
GREENLEAF II COGEN |
Forced |
49.20 |
2.20 |
PGAE North |
GRSCRK_6_BGCKWW |
BIG CREEK WATER WORKS - CEDAR FLAT |
Forced |
5.00 |
5.00 |
PGAE Gen |
GUERNS_6_HD3BM3 |
Hanford Digester Genset 3 |
Forced |
1.00 |
0.00 |
PGAE Gen |
GUERNS_6_VH2BM1 |
Hanford Digester Genset 2 |
Forced |
1.00 |
0.00 |
PGAE Gen |
GWFPWR_1_UNITS |
Hanford Peaker Plant |
Planned/Forced |
98.46 |
5.55 |
PGAE Gen |
GYS5X6_7_UNITS |
GEYSERS UNITS 5 & 6 AGGREGATE |
Forced |
85.00 |
85.00 |
PGAE Gen |
GYS7X8_7_UNITS |
GEYSERS UNITS 7 & 8 AGGREGATE |
Forced |
82.00 |
4.00 |
PGAE Gen |
HALSEY_6_UNIT |
HALSEY HYDRO |
Forced |
13.50 |
7.35 |
PGAE Gen |
HARBGN_7_UNITS |
HARBOR COGEN COMBINED CYCLE |
Forced |
109.01 |
29.01 |
SCE Gen |
HATCR1_7_UNIT |
Hat Creek #1 |
Planned |
8.50 |
8.50 |
PGAE North |
HATLOS_6_BWDHY1 |
Bidwell Ditch |
Forced |
2.00 |
0.50 |
PGAE Gen |
HATLOS_6_LSCRK |
Lost Creek 1 & 2 Hydro Conversion |
Forced |
1.70 |
0.72 |
PGAE Gen |
HATRDG_2_WIND |
Hatchet Ridge Wind Farm |
Forced |
102.00 |
0.00 |
PGAE Gen |
HAYPRS_6_QFUNTS |
HAYPRESS HYDRO QF UNITS |
Forced |
14.80 |
14.80 |
PGAE North |
HELMPG_7_UNIT 1 |
HELMS PUMP-GEN UNIT 1 |
Forced |
407.00 |
0.00 |
PGAE South |
HENRTA_6_SOLAR1 |
Lemoore 1 |
Forced |
1.50 |
1.50 |
PGAE Gen |
HENRTA_6_UNITA1 |
GWF HENRIETTA PEAKER PLANT UNIT 1 |
Planned/Forced |
49.98 |
4.51 |
PGAE South |
HENRTA_6_UNITA2 |
GWF HENRIETTA PEAKER PLANT UNIT 2 |
Planned/Forced |
49.42 |
3.38 |
PGAE South |
HIDSRT_2_UNITS |
HIGH DESERT POWER PROJECT AGGREGATE |
Forced |
830.00 |
61.00 |
SCE Gen |
HINSON_6_LBECH1 |
Long Beach Unit 1 |
Forced |
63.00 |
0.00 |
SCE Gen |
HINSON_6_LBECH2 |
Long Beach Unit 2 |
Forced |
63.00 |
0.00 |
SCE Gen |
HINSON_6_LBECH3 |
Long Beach Unit 3 |
Forced |
63.00 |
0.00 |
SCE Gen |
HINSON_6_LBECH4 |
Long Beach Unit 4 |
Forced |
63.00 |
0.00 |
SCE Gen |
HMLTBR_6_UNITS |
HAMILTON BRANCH PH (AGGREGATE) |
Forced |
4.90 |
4.90 |
PGAE Gen |
HNTGBH_2_PL1X3 |
Huntington Beach Energy |
Forced |
673.80 |
340.80 |
SCE Gen |
HNTGBH_7_UNIT 2 |
HUNTINGTON BEACH GEN STA. UNIT 2 |
Forced |
225.80 |
225.80 |
SCE Gen |
HOOVER_2_MWDDYN |
HOOVER |
Forced |
249.00 |
228.00 |
SCE Gen |
HOOVER_2_VEADYN |
HOOVER |
Forced |
16.00 |
5.00 |
SCE Gen |
HURON_6_SOLAR |
Huron Solar Station |
Forced |
20.00 |
2.00 |
PGAE South |
HYTTHM_2_UNITS |
HYATT-THERMALITO PUMP-GEN (AGGREGATE) |
Planned/Forced |
933.10 |
361.10 |
PGAE Gen |
INLDEM_5_UNIT 1 |
Inland Empire Energy Center, Unit 1 |
Planned |
376.20 |
376.20 |
SCE Gen |
INSKIP_2_UNIT |
INSKIP HYDRO |
Forced |
8.00 |
8.00 |
PGAE North |
INTKEP_2_UNITS |
CCSF Hetch_Hetchy Hydro Aggregate |
Forced |
405.00 |
134.00 |
PGAE Gen |
IVANPA_1_UNIT3 |
Ivanpah 3 |
Forced |
133.00 |
6.00 |
SCE Gen |
IVSLR2_2_SM2SR1 |
Silver Ridge Mount Signal 2 |
Forced |
150.00 |
0.00 |
SDGE Gen |
JAWBNE_2_NSRWND |
North Sky River Wind Project |
Forced |
160.00 |
9.60 |
SCE Gen |
KANSAS_6_SOLAR |
RE Kansas South |
Forced |
20.00 |
0.00 |
PGAE South |
KEKAWK_6_UNIT |
STS HYDROPOWER LTD. (KEKAWAKA) |
Planned/Forced |
5.50 |
5.50 |
PGAE Gen |
KELSO_2_UNITS |
Mariposa Energy |
Forced |
198.03 |
3.73 |
PGAE Gen |
KERKH1_7_UNIT 1 |
KERKHOFF PH 1 UNIT #1 |
Forced |
13.00 |
13.00 |
PGAE North |
KERKH1_7_UNIT 1 |
KERKHOFF PH 1 UNIT #1 |
Forced |
13.00 |
13.00 |
PGAE South |
KERKH1_7_UNIT 3 |
KERKHOFF PH 1 UNIT #3 |
Forced |
12.80 |
12.80 |
PGAE North |
KERKH1_7_UNIT 3 |
KERKHOFF PH 1 UNIT #3 |
Forced |
12.80 |
12.80 |
PGAE South |
KERKH2_7_UNIT 1 |
KERKHOFF PH 2 UNIT #1 |
Forced |
153.90 |
0.00 |
PGAE North |
KERKH2_7_UNIT 1 |
KERKHOFF PH 2 UNIT #1 |
Forced |
153.90 |
0.00 |
PGAE South |
KERNFT_1_UNITS |
KERN FRONT LIMITED |
Forced |
52.40 |
5.20 |
PGAE South |
KERRGN_1_UNIT 1 |
KERN RIVER HYDRO UNITS 1-4 AGGREGATE |
Forced |
25.60 |
5.40 |
SCE Gen |
KILARC_2_UNIT 1 |
KILARC HYDRO |
Forced |
1.50 |
1.50 |
PGAE North |
KNGCTY_6_UNITA1 |
King City Energy Center, Unit 1 |
Forced |
44.60 |
0.00 |
PGAE Gen |
KRAMER_2_SEGS 8 |
KRAMER JUNCTION 8 |
Forced |
80.00 |
0.00 |
SCE Gen |
KRNCNY_6_UNIT |
KERN CANYON |
Forced |
11.50 |
11.50 |
PGAE South |
LACIEN_2_VENICE |
MWD Venice Hydroelectric Recovery Plant |
Forced |
9.95 |
9.95 |
SCE Gen |
LAMONT_1_SOLAR4 |
Hayworth Solar Farm |
Forced |
26.66 |
11.16 |
PGAE South |
LAMONT_1_SOLAR5 |
Redcrest Solar Farm |
Forced |
16.66 |
0.00 |
PGAE Gen |
LAPLMA_2_UNIT 1 |
La Paloma Generating Plant Unit #1 |
Forced |
267.00 |
14.00 |
PGAE Gen |
LAPLMA_2_UNIT 2 |
La Paloma Generating Plant Unit #2 |
Forced |
266.00 |
5.00 |
PGAE Gen |
LAPLMA_2_UNIT 3 |
La Paloma Generating Plant Unit #3 |
Forced |
266.00 |
9.00 |
PGAE Gen |
LAPLMA_2_UNIT 4 |
LA PALOMA GENERATING PLANT, UNIT #4 |
Forced |
253.29 |
6.29 |
PGAE Gen |
LAROA2_2_UNITA1 |
LR2 |
Forced |
322.00 |
32.00 |
SDGE Gen |
LEBECS_2_UNITS |
Pastoria Energy Facility |
Forced |
799.47 |
10.47 |
SCE Gen |
LECEF_1_UNITS |
LOS ESTEROS ENERGY FACILITY AGGREGATE |
Forced |
309.84 |
6.84 |
PGAE South |
LIVOAK_1_UNIT 1 |
LIVE OAK LIMITED |
Forced |
49.70 |
6.70 |
PGAE South |
LMBEPK_2_UNITA3 |
Goose Haven Energy Center, Unit #1 |
Forced |
47.40 |
0.00 |
PGAE Gen |
LMEC_1_PL1X3 |
Los Medanos Energy Center AGGREGATE |
Forced |
580.00 |
15.00 |
PGAE Gen |
LNCSTR_6_CREST |
Lanacaster Aggregate Solar Resources |
Forced |
5.50 |
0.00 |
SCE Gen |
LNCSTR_6_SOLAR2 |
SEPV Sierra NGR |
Forced |
2.75 |
1.55 |
SCE Gen |
LOCKFD_1_BEARCK |
Bear Creek Solar |
Forced |
1.50 |
0.00 |
PGAE Gen |
LOCKFD_1_KSOLAR |
Kettleman Solar |
Forced |
1.00 |
0.00 |
PGAE South |
LODI25_2_UNIT 1 |
LODI GAS TURBINE |
Forced |
25.00 |
3.00 |
PGAE Gen |
LODIEC_2_PL1X2 |
Lodi Energy Center |
Forced |
302.58 |
16.58 |
PGAE Gen |
MAGNLA_6_ANAHEIM |
Magnolia Power Plant Anaheim |
Forced |
109.00 |
56.00 |
SCE Gen |
MAGNLA_6_CERRITOS |
Magnolia Power Plant Cerritos |
Planned |
12.00 |
2.00 |
SCE Gen |
MAGNLA_6_COLTON |
Magnolia Power Project |
Planned |
12.00 |
2.00 |
SCE Gen |
MAGNLA_6_PASADENA |
Magnolia Power Plant - PASADENA |
Forced |
18.00 |
9.00 |
SCE Gen |
MAGUND_1_BKSSR2 |
Bakersfield Solar 1 |
Forced |
5.25 |
0.00 |
PGAE Gen |
MALCHQ_7_UNIT 1 |
MALACHA HYDRO L.P. |
Forced |
32.50 |
0.00 |
PGAE Gen |
MALIN_5_GCPDDYN |
Grant County Hydro Facilities |
Forced |
125.00 |
0.00 |
PGAE Gen |
MANZNA_2_WIND |
Manzana Wind |
Forced |
189.00 |
0.00 |
SCE Gen |
METEC_2_PL1X3 |
Metcalf Energy Center |
Forced |
593.16 |
19.16 |
PGAE Gen |
MIRLOM_2_MLBBTA |
Mira Loma BESS A |
Planned |
10.00 |
0.00 |
SCE Gen |
MIRLOM_2_MLBBTB |
Mira Loma BESS B |
Planned |
10.00 |
0.00 |
SCE Gen |
MKTRCK_1_UNIT 1 |
MCKITTRICK LIMITED |
Forced |
47.49 |
5.49 |
PGAE South |
MOJAVW_2_SOLAR |
Mojave West |
Forced |
20.00 |
0.00 |
SCE Gen |
MONLTH_6_BATTRY |
Tehachapi Storage Project |
Forced |
7.99 |
5.99 |
SCE Gen |
MONLTH_6_BOREL |
BOREL HYDRO UNITS 1-3 AGGREGATE |
Forced |
11.00 |
11.00 |
SCE Gen |
MONTPH_7_UNITS |
MONTICELLO HYDRO AGGREGATE |
Forced |
12.50 |
5.80 |
PGAE Gen |
MOORPK_2_CALABS |
Calabasas Gas-to-Energy Facility |
Forced |
6.96 |
4.46 |
SCE Gen |
MOSSLD_2_PSP2 |
MOSS LANDING POWER BLOCK 2 |
Forced |
510.00 |
0.00 |
PGAE South |
MRCHNT_2_PL1X3 |
Desert Star Energy Center |
Forced |
494.58 |
34.58 |
SDGE Gen |
MSHGTS_6_MMARLF |
MIRAMAR LANDFILL |
Planned/Forced |
5.00 |
3.30 |
SDGE Gen |
MSOLAR_2_SOLAR1 |
Mesquite Solar 1 |
Forced |
165.00 |
10.50 |
SDGE Gen |
MTWIND_1_UNIT 1 |
Mountain View Power Project I |
Planned/Forced |
44.40 |
13.20 |
SCE Gen |
MTWIND_1_UNIT 2 |
Mountain View Power Project II |
Planned/Forced |
22.20 |
3.60 |
SCE Gen |
MTWIND_1_UNIT 3 |
Mountain View Power Project III |
Forced |
22.44 |
3.30 |
SCE Gen |
NAROW1_2_UNIT |
NARROWS PH 1 UNIT |
Forced |
12.00 |
12.00 |
PGAE North |
NAROW2_2_UNIT |
Narrows Powerhouse Unit 2 |
Planned |
55.00 |
38.00 |
PGAE North |
NAVYII_2_UNITS |
COSO POWER DEVELOPER (NAVY II) AGGREGATE |
Forced |
90.00 |
47.00 |
SCE Gen |
NCPA_7_GP2UN3 |
NCPA GEO PLANT 2 UNIT 3 |
Forced |
42.42 |
42.42 |
PGAE Gen |
NGILAA_5_SDGDYN |
NGILAA_5_SDGDYN |
Forced |
57.00 |
6.00 |
APS Gen |
NGILAA_5_SDGDYN |
NGILAA_5_SDGDYN |
Forced |
57.00 |
6.00 |
SDGE Gen |
NOVATO_6_LNDFL |
Redwood Renewable Energy |
Forced |
3.90 |
2.20 |
PGAE Gen |
OAK C_7_UNIT 1 |
OAKLAND STATION C GT UNIT 1 |
Forced |
55.00 |
1.50 |
PGAE South |
OAK C_7_UNIT 3 |
OAKLAND STATION C GT UNIT 3 |
Forced |
55.00 |
1.00 |
PGAE South |
OASIS_6_CREST |
CREST Contracts |
Forced |
13.50 |
0.00 |
SCE Gen |
OASIS_6_SOLAR2 |
Oasis Solar |
Forced |
20.00 |
0.00 |
SCE Gen |
OILFLD_7_QFUNTS |
Nacimiento Hydroelectric Plant |
Planned |
3.80 |
1.59 |
PGAE South |
OLDRIV_6_CESDBM |
Ces Dairy Biogas |
Forced |
1.00 |
0.00 |
PGAE Gen |
OLDRIV_6_LKVBM1 |
Lakeview Dairy Biogas |
Forced |
1.00 |
0.00 |
PGAE Gen |
OLINDA_2_COYCRK |
MWD Coyote Creek Hydroelectric Recovery |
Forced |
3.13 |
3.13 |
SCE Gen |
OLINDA_2_LNDFL2 |
Brea Power II |
Forced |
28.10 |
5.10 |
SCE Gen |
OMAR_2_UNIT 1 |
KERN RIVER COGENERATION CO. UNIT 1 |
Forced |
78.00 |
5.20 |
SCE Gen |
OMAR_2_UNIT 2 |
KERN RIVER COGENERATION CO. UNIT 2 |
Forced |
78.11 |
5.51 |
SCE Gen |
OMAR_2_UNIT 3 |
KERN RIVER COGENERATION CO. UNIT 3 |
Forced |
81.41 |
6.41 |
SCE Gen |
ORLND_6_SOLAR1 |
Enerparc California 2 |
Forced |
1.50 |
0.00 |
PGAE Gen |
ORMOND_7_UNIT 1 |
ORMOND BEACH GEN STA. UNIT 1 |
Forced |
741.27 |
91.27 |
SCE Gen |
ORMOND_7_UNIT 2 |
ORMOND BEACH GEN STA. UNIT 2 |
Forced |
750.00 |
750.00 |
SCE Gen |
OROVIL_6_UNIT |
Oroville Cogeneration, LP |
Planned |
7.50 |
7.50 |
PGAE Gen |
ORTGA_6_ME1SL1 |
Merced 1 |
Forced |
3.00 |
0.00 |
PGAE Gen |
OTMESA_2_PL1X3 |
OTAY MESA ENERGY CENTER |
Forced |
603.68 |
36.68 |
SDGE Gen |
PACLUM_6_UNIT |
Humboldt Redwood |
Forced |
28.80 |
6.80 |
PGAE North |
PADUA_2_ONTARO |
ONTARIO/SIERRA HYDRO PSP |
Planned |
1.92 |
0.42 |
SCE Gen |
PADUA_6_MWDSDM |
San Dimas Hydroelectric Recovery Plant |
Forced |
9.90 |
9.90 |
SCE Gen |
PALALT_7_COBUG |
Cooperatively Owned Back Up Generator |
Forced |
4.50 |
4.50 |
PGAE Gen |
PANSEA_1_PANARO |
Mesa Wind Project |
Planned/Forced |
30.00 |
30.00 |
SCE Gen |
PARDEB_6_UNITS |
Pardee Power House |
Forced |
30.00 |
30.00 |
PGAE Gen |
PGP2_2_PDRP12 |
CBP PGP2_2_PDRP12 |
Forced |
0.10 |
0.10 |
PGAE Gen |
PGSB_1_PDRP22 |
CBP PGSB_1_PDRP22 |
Forced |
0.22 |
0.22 |
PGAE Gen |
PGSB_1_PDRP23 |
CBP PGSB_1_PDRP23 |
Forced |
0.20 |
0.20 |
PGAE Gen |
PINFLT_7_UNITS |
PINE FLAT HYDRO AGGREGATE |
Planned |
198.51 |
183.51 |
PGAE Gen |
PIOPIC_2_CTG1 |
Pio Pico Unit 1 |
Forced |
111.30 |
7.07 |
SDGE Gen |
PIOPIC_2_CTG2 |
Pio Pico Unit 2 |
Forced |
112.70 |
5.70 |
SDGE Gen |
PIOPIC_2_CTG3 |
Pio Pico Unit 3 |
Forced |
112.00 |
6.65 |
SDGE Gen |
PIT3_7_PL1X3 |
PIT PH 3 UNITS 1, 2 & 3 AGGREGATE |
Planned/Forced |
70.60 |
70.60 |
PGAE North |
PIT4_7_PL1X2 |
PIT PH 4 UNITS 1 & 2 AGGREGATE |
Forced |
95.00 |
95.00 |
PGAE North |
PIT5_7_PL1X2 |
PIT PH 5 UNITS 1 & 2 AGGREGATE |
Forced |
82.00 |
82.00 |
PGAE North |
PIT5_7_PL3X4 |
PIT PH 5 UNITS 3 & 4 AGGREGATE |
Forced |
82.00 |
82.00 |
PGAE North |
PIT6_7_UNIT 1 |
PIT PH 6 UNIT 1 |
Planned/Forced |
39.00 |
39.00 |
PGAE North |
PIT6_7_UNIT 2 |
PIT PH 6 UNIT 2 |
Planned/Forced |
40.00 |
40.00 |
PGAE North |
PIT7_7_UNIT 1 |
PIT PH 7 UNIT 1 |
Forced |
55.70 |
1.90 |
PGAE North |
PIT7_7_UNIT 2 |
PIT PH 7 UNIT 2 |
Forced |
54.60 |
0.80 |
PGAE North |
PLAINV_6_BSOLAR |
Western Antelope Blue Sky Ranch A |
Forced |
20.00 |
2.00 |
SCE Gen |
PNCHEG_2_PL1X4 |
PANOCHE ENERGY CENTER (Aggregated) |
Forced |
401.00 |
0.00 |
PGAE Gen |
PNCHPP_1_PL1X2 |
Midway Peaking Aggregate |
Forced |
119.91 |
5.91 |
PGAE Gen |
PNOCHE_1_PL1X2 |
Panoche Peaker |
Forced |
49.97 |
4.97 |
PGAE South |
POEPH_7_UNIT 1 |
POE HYDRO UNIT 1 |
Forced |
69.00 |
66.72 |
PGAE North |
POEPH_7_UNIT 2 |
POE HYDRO UNIT 2 |
Forced |
68.50 |
66.50 |
PGAE North |
POTTER_6_UNITS |
Potter Valley |
Forced |
10.10 |
4.80 |
PGAE North |
PUTHCR_1_SOLAR1 |
Putah Creek Solar Farm |
Forced |
1.98 |
0.00 |
PGAE Gen |
PVERDE_5_SCEDYN |
PVERDE_5_SCEDYN |
Forced |
635.00 |
5.00 |
SCE Gen |
PWEST_1_UNIT |
PACIFIC WEST 1 WIND GENERATION |
Forced |
2.10 |
2.10 |
SCE Gen |
RAMON_2_SCEDYN |
RAMON_2_SCEDYN |
Forced |
106.18 |
44.18 |
SCE Gen |
RCKCRK_7_UNIT 1 |
ROCK CREEK HYDRO UNIT 1 |
Forced |
57.00 |
28.00 |
PGAE North |
RCKCRK_7_UNIT 2 |
ROCK CREEK HYDRO UNIT 2 |
Forced |
56.90 |
56.90 |
PGAE North |
RDWAY_1_CREST |
CREST Contracts |
Forced |
6.50 |
0.00 |
SCE Gen |
RECTOR_2_CREST |
Rector Aggregate Solar Resources |
Forced |
14.00 |
0.00 |
SCE Gen |
RECTOR_2_KAWEAH |
KAWEAH PH 2 & 3 PSP AGGREGATE |
Forced |
6.55 |
6.55 |
SCE Gen |
RECTOR_2_KAWH 1 |
KAWEAH PH 1 UNIT 1 |
Forced |
2.25 |
2.25 |
SCE Gen |
RECTOR_2_QF |
Kaweah Unit 1 |
Planned |
17.00 |
17.00 |
SCE Gen |
REDBLF_6_UNIT |
RED BLUFF PEAKER PLANT |
Forced |
44.00 |
10.60 |
PGAE Gen |
REDOND_7_UNIT 5 |
REDONDO GEN STA. UNIT 5 |
Forced |
178.87 |
68.87 |
SCE Gen |
REDOND_7_UNIT 6 |
REDONDO GEN STA. UNIT 6 |
Forced |
175.00 |
100.00 |
SCE Gen |
REDOND_7_UNIT 8 |
REDONDO GEN STA. UNIT 8 |
Forced |
480.00 |
210.00 |
SCE Gen |
RENWD_1_QF |
Renwind re-powering project |
Forced |
10.00 |
1.00 |
SCE Gen |
RICHMN_7_BAYENV |
BAY ENVIRONMENTAL (NOVE POWER) |
Forced |
2.50 |
2.50 |
PGAE Gen |
RIOBRV_6_UNIT 1 |
RIO BRAVO HYDRO |
Forced |
14.00 |
14.00 |
PGAE Gen |
RNDSBG_1_HZASR1 |
Hazel A |
Forced |
2.99 |
0.00 |
SCE Gen |
ROLLIN_6_UNIT |
ROLLINS HYDRO |
Forced |
13.50 |
0.00 |
PGAE North |
ROSMDW_2_WIND1 |
Pacific Wind - Phase 1 |
Planned |
140.00 |
4.00 |
SCE Gen |
RSMSLR_6_SOLAR2 |
Rosamond Two |
Forced |
20.00 |
0.00 |
SCE Gen |
RTEDDY_2_SOLAR1 |
Rosamond West Solar 1 |
Forced |
54.00 |
16.00 |
SCE Gen |
RTREE_2_WIND1 |
Rising Tree 1 |
Forced |
79.20 |
0.00 |
SCE Gen |
RTREE_2_WIND2 |
Rising Tree 2 |
Forced |
19.80 |
0.00 |
SCE Gen |
RTREE_2_WIND3 |
Rising Tree 3 |
Forced |
99.00 |
0.00 |
SCE Gen |
RUSCTY_2_UNITS |
Russell City Energy Center |
Forced |
620.50 |
23.10 |
PGAE South |
RVSIDE_2_RERCU3 |
Riverside Energy Res. Ctr Unit 3 |
Forced |
49.00 |
0.00 |
SCE Gen |
RVSIDE_2_RERCU4 |
Riverside Energy Res. Ctr Unit 4 |
Forced |
49.00 |
0.00 |
SCE Gen |
RVSIDE_6_RERCU1 |
Riverside Energy Res. Ctr Unit 1 |
Forced |
48.35 |
0.00 |
SCE Gen |
RVSIDE_6_RERCU2 |
Riverside Energy Res. Ctr Unit 2 |
Forced |
48.50 |
0.00 |
SCE Gen |
RVSIDE_6_SPRING |
SPRINGS GENERATION PROJECT AGGREGATE |
Forced |
36.00 |
9.00 |
SCE Gen |
SANTFG_7_UNITS |
GEYSERS CALISTOGA AGGREGATE |
Forced |
92.10 |
34.10 |
PGAE Gen |
SANWD_1_QF |
San Gorgonio Farms Wind Farm |
Planned |
31.00 |
5.67 |
SCE Gen |
SBERDO_2_PSP3 |
Mountainview Gen Sta. Unit 3 |
Forced |
555.00 |
10.00 |
SCE Gen |
SBERDO_2_PSP4 |
Mountainview Gen Sta. Unit 4 |
Forced |
555.00 |
10.00 |
SCE Gen |
SBERDO_2_SNTANA |
SANTA ANA PSP |
Planned |
6.95 |
6.95 |
SCE Gen |
SBERDO_6_MILLCK |
MILL CREEK PSP |
Planned/Forced |
3.93 |
3.13 |
SCE Gen |
SCEC_1_PDRP16 |
CBP-DA-C-LSCE |
Forced |
4.57 |
4.57 |
SCE Gen |
SCEC_1_PDRP17 |
CBP-DO-C-LSCE |
Forced |
4.80 |
4.80 |
SCE Gen |
SCEC_1_PDRP35 |
CBP-DO-C-LSEL1 |
Forced |
1.42 |
1.42 |
SCE Gen |
SCEC_1_PDRP40 |
LCR NRG CS-C-LSCE |
Forced |
5.00 |
5.00 |
SCE Gen |
SCEHOV_2_HOOVER |
SCEHOV_2_HOOVER |
Forced |
287.01 |
111.01 |
SCE Gen |
SCEN_6_PDRP28 |
CBP-DA-N-LNEI1 |
Forced |
1.65 |
1.65 |
SCE Gen |
SCEW_2_PDRP11 |
LCR NRG CS-W-LSCE |
Forced |
5.00 |
5.00 |
SCE Gen |
SCEW_2_PDRP115 |
LCR AMS Hybrid West LA 1-W-LCRLL |
Forced |
3.50 |
1.85 |
SCE Gen |
SCEW_2_PDRP12 |
CBP-DA-W-LNEI1 |
Forced |
1.61 |
1.61 |
SCE Gen |
SCEW_2_PDRP13 |
CBP-DO-W-LSEL1 |
Forced |
1.36 |
1.36 |
SCE Gen |
SCEW_2_PDRP35 |
CBP-DO-W-LSCE |
Forced |
1.61 |
1.61 |
SCE Gen |
SCEW_2_PDRP36 |
CBP-DA-W-LSCE |
Forced |
1.13 |
1.13 |
SCE Gen |
SCHD_1_PDRP14 |
CBP-DO-HD-LSEL1 |
Forced |
1.11 |
1.11 |
SCE Gen |
SCHLTE_1_PL1X3 |
Tracy Combined Cycle Power Plant |
Forced |
336.04 |
23.17 |
PGAE Gen |
SCHNDR_1_WSTSDE |
Westside Solar Station |
Forced |
15.00 |
2.00 |
PGAE Gen |
SCNW_6_PDRP05 |
CBP-DO-NW-LSCE |
Forced |
1.10 |
1.10 |
SCE Gen |
SEARLS_7_ARGUS |
Argus Cogeneration |
Forced |
19.00 |
0.00 |
SCE Gen |
SENTNL_2_CTG2 |
Sentinel Unit 2 |
Forced |
95.34 |
3.34 |
SCE Gen |
SENTNL_2_CTG4 |
Sentinel Unit 4 |
Forced |
102.47 |
10.47 |
SCE Gen |
SENTNL_2_CTG5 |
Sentinel Unit 5 |
Forced |
103.81 |
11.81 |
SCE Gen |
SENTNL_2_CTG6 |
Sentinel Unit 6 |
Forced |
100.99 |
6.99 |
SCE Gen |
SENTNL_2_CTG7 |
Sentinel Unit 7 |
Forced |
97.06 |
5.06 |
SCE Gen |
SENTNL_2_CTG8 |
Sentinel Unit 8 |
Forced |
101.80 |
9.80 |
SCE Gen |
SHUTLE_6_CREST |
CREST Contracts |
Forced |
4.00 |
0.00 |
SCE Gen |
SIERRA_1_UNITS |
HIGH SIERRA LIMITED |
Forced |
52.43 |
3.93 |
PGAE Gen |
SLSTR1_2_SOLAR1 |
Solar Star 1 |
Forced |
310.00 |
0.00 |
SCE Gen |
SLSTR2_2_SOLAR2 |
Solar Star 2 |
Forced |
276.00 |
0.00 |
SCE Gen |
SLUISP_2_UNITS |
SAN LUIS (GIANELLI) PUMP-GEN (AGGREGATE) |
Planned |
374.43 |
0.00 |
PGAE Gen |
SLYCRK_1_UNIT 1 |
SLY CREEK HYDRO |
Forced |
13.00 |
2.64 |
PGAE North |
SMUDGO_7_UNIT 1 |
SONOMA POWER PLANT |
Forced |
53.00 |
1.00 |
PGAE Gen |
SMYRNA_1_DL1SR1 |
Delano Land 1 |
Forced |
1.00 |
0.00 |
PGAE Gen |
SNCLRA_2_UNIT1 |
New Indy Oxnard |
Planned/Forced |
27.80 |
16.80 |
SCE Gen |
SOUTH_2_UNIT |
SOUTH HYDRO |
Planned |
7.10 |
7.10 |
PGAE Gen |
SPAULD_6_UNIT12 |
SPAULDING HYDRO PH 1 & 2 AGGREGATE |
Forced |
11.40 |
11.40 |
PGAE North |
SPRGAP_1_UNIT 1 |
SPRING GAP HYDRO |
Planned/Forced |
7.00 |
7.00 |
PGAE North |
SPRGVL_2_TULE |
TULE RIVER HYDRO PLANT (PG&E) |
Forced |
6.40 |
6.40 |
SCE Gen |
SPRGVL_2_TULESC |
TULE RIVER HYDRO PLANT (SCE) |
Forced |
2.50 |
2.50 |
SCE Gen |
STIGCT_2_LODI |
LODI STIG UNIT |
Forced |
49.90 |
1.90 |
PGAE Gen |
STROUD_6_SOLAR |
Stroud Solar Station |
Forced |
20.00 |
2.00 |
PGAE South |
STROUD_6_WWHSR1 |
Winter Wheat Solar Farm |
Forced |
1.50 |
0.30 |
PG&E South |
SUNRIS_2_PL1X3 |
Sunrise Power Project AGGREGATE II |
Forced |
586.02 |
37.02 |
PGAE Gen |
SUNSET_2_UNITS |
MIDWAY SUNSET COGENERATION PLANT |
Forced |
248.00 |
32.00 |
PGAE South |
SWIFT_1_NAS |
YERBA BUENA BATTERY |
Forced |
4.80 |
2.80 |
PGAE South |
SYCAMR_2_UNIT 1 |
Sycamore Cogeneration Unit 1 |
Forced |
86.00 |
8.56 |
SCE Gen |
SYCAMR_2_UNIT 2 |
Sycamore Cogeneration Unit 2 |
Forced |
78.00 |
6.00 |
SCE Gen |
SYCAMR_2_UNIT 3 |
Sycamore Cogeneration Unit 3 |
Forced |
78.00 |
6.00 |
SCE Gen |
SYCAMR_2_UNIT 4 |
Sycamore Cogeneration Unit 4 |
Forced |
78.00 |
7.00 |
SCE Gen |
TANHIL_6_SOLART |
Berry Cogen 18 |
Forced |
17.00 |
0.00 |
PGAE South |
TERMEX_2_PL1X3 |
TDM |
Forced |
625.00 |
22.00 |
SDGE Gen |
TIFFNY_1_DILLON |
TIFFNY_1_DILLON |
Forced |
45.00 |
4.00 |
SCE Gen |
TKOPWR_6_HYDRO |
Bear Creek Hydroelectric Project |
Planned/Forced |
2.83 |
2.83 |
PGAE Gen |
TRNSWD_1_QF |
FPL Energy C Wind |
Forced |
38.97 |
38.97 |
SCE Gen |
UKIAH_7_LAKEMN |
UKIAH LAKE MENDOCINO HYDRO |
Forced |
3.50 |
1.00 |
PGAE Gen |
UNOCAL_1_UNITS |
TOSCO (RODEO PLANT) |
Forced |
49.85 |
0.00 |
PGAE South |
USWND2_1_WIND1 |
Golden Hills A |
Forced |
42.96 |
0.00 |
PGAE Gen |
USWND2_1_WIND2 |
Golden Hills B |
Forced |
42.96 |
0.00 |
PGAE Gen |
USWND2_1_WIND3 |
Golden Hills C |
Forced |
46.00 |
2.30 |
PGAE Gen |
USWNDR_2_LABWD1 |
LaBrisa Wind Project |
Forced |
9.00 |
0.00 |
PGAE Gen |
USWNDR_2_SMUD |
SOLANO WIND FARM |
Forced |
102.18 |
0.66 |
PGAE Gen |
USWNDR_2_SMUD2 |
Solano Wind Project Phase 3 |
Forced |
127.80 |
0.00 |
PGAE Gen |
USWPJR_2_UNITS |
Vasco Wind |
Forced |
78.20 |
0.00 |
PGAE Gen |
VACADX_1_NAS |
VACA-DIXON BATTERY |
Forced |
1.85 |
1.15 |
PGAE North |
VALLEY_5_PERRIS |
MWD Perris Hydroelectric Recovery Plant |
Forced |
7.94 |
7.94 |
SCE Gen |
VALLEY_5_REDMTN |
MWD Red Mountain Hydroelectric Recovery |
Forced |
5.90 |
5.90 |
SCE Gen |
VERNON_6_GONZL1 |
H. Gonzales Unit #1 |
Forced |
5.75 |
5.75 |
SCE Gen |
VESTAL_2_KERN |
KERN RIVER PH 3 UNITS 1 & 2 AGGREGATE |
Forced |
36.80 |
36.30 |
SCE Gen |
VICTOR_1_CREST |
Victor Aggregate Solar Resources |
Forced |
24.50 |
0.00 |
SCE Gen |
VICTOR_1_LVSLR1 |
Lone Valley Solar Park 1 |
Forced |
10.00 |
0.00 |
SCE Gen |
VICTOR_1_SOLAR2 |
Alamo Solar |
Forced |
20.00 |
0.00 |
SCE Gen |
VILLPK_2_VALLYV |
MWD Valley View Hydroelectric Recovery P |
Forced |
4.10 |
4.10 |
SCE Gen |
VSTAES_6_VESBT1 |
Vista Energy Storage |
Forced |
40.00 |
5.50 |
SDGE Gen |
WALCRK_2_CTG1 |
Walnut Creek Energy Park Unit 1 |
Forced |
96.43 |
0.00 |
SCE Gen |
WALCRK_2_CTG2 |
Walnut Creek Energy Park Unit 2 |
Forced |
96.91 |
0.00 |
SCE Gen |
WALCRK_2_CTG3 |
Walnut Creek Energy Park Unit 3 |
Forced |
96.65 |
0.00 |
SCE Gen |
WALCRK_2_CTG4 |
Walnut Creek Energy Park Unit 4 |
Forced |
96.49 |
0.00 |
SCE Gen |
WALCRK_2_CTG5 |
Walnut Creek Energy Park Unit 5 |
Forced |
96.65 |
0.00 |
SCE Gen |
WDLEAF_7_UNIT 1 |
WOODLEAF HYDRO |
Forced |
60.00 |
20.00 |
PGAE North |
WFRESN_1_SOLAR |
Joya Del Sol |
Forced |
1.50 |
0.00 |
PGAE Gen |
WHTWTR_1_WINDA1 |
Whitewater Hill Wind Project |
Forced |
61.50 |
26.50 |
SCE Gen |
WISE_1_UNIT 1 |
Wise Hydro Unit 1 |
Forced |
14.50 |
6.02 |
PGAE Gen |
WISE_1_UNIT 2 |
WISE HYDRO UNIT 2 |
Planned/Forced |
3.20 |
3.20 |
PGAE North |
WISHON_6_UNITS |
Wishon/San Joaquin #1-A AGGREGATE |
Forced |
18.40 |
18.40 |
PGAE Gen |
WNDMAS_2_UNIT 1 |
BUENA VISTA ENERGY, LLC |
Forced |
38.00 |
0.00 |
PGAE Gen |
WOLFSK_1_UNITA1 |
Wolfskill Energy Center |
Forced |
46.90 |
0.00 |
PGAE Gen |
WSENGY_1_UNIT 1 |
Wheelabrator Shasta |
Forced |
50.00 |
16.00 |
PGAE North |
YUBACT_6_UNITA1 |
Yuba City Energy Center (Calpine) |
Forced |
47.60 |
2.60 |
PGAE North |
ZOND_6_UNIT |
ZOND WINDSYSTEMS INC. |
Forced |
17.10 |
17.10 |
PGAE Gen |
APLHIL_1_SFKHY1 |
South Fork Powerhouse |
Forced |
2.68 |
2.68 |
|
HARDWK_6_STWBM1 |
Still Water Ranch Dairy |
Forced |
1.00 |
0.30 |
|
HIGGNS_1_COMBIE |
Combie South |
Planned |
1.50 |
1.50 |
|
MALIN_5_HERMDYN |
MALIN_5_HERMDYN |
Forced |
308.00 |
308.00 |
|
SCEC_1_PDRP15 |
CBP-DA-C-LCRLL |
Forced |
1.52 |
1.52 |
|
SCEC_1_PDRP23 |
CBP-DO-C-LNEI1 |
Forced |
1.15 |
1.15 |
|
SCEC_1_PDRP24 |
CBP-DA-C-LNEI1 |
Forced |
2.22 |
2.22 |
|
SCEW_2_PDRP14 |
CBP-DO-W-LNEI1 |
Forced |
1.14 |
1.14 |
|
SCHD_1_PDRP52 |
CBP-DA-H-LNEI1 |
Forced |
1.15 |
1.15 |
|
SCNW_6_PDRP57 |
CBP-DA-NW-LNEI1 |
Forced |
1.12 |
1.12 |
|
SUTTER_2_CISO |
Sutter Power Plant Pseudo-CISO |
Planned/Forced |
275.00 |
3.00 |
|
VOLTA_7_PONHY1 |
VOLTA_7_PONHY1 |
Forced |
1.25 |
1.25 |
|