| Resource ID |
Resource Name
|
Outage Type
|
Capacity (MW)
|
Curtailed (MW)
|
Zone Name
|
| ADLIN_1_UNITS |
GEYSERS AIDLIN AGGREGATE |
Forced |
22.00 |
9.00 |
PGAE Gen |
| AGRICO_6_PL3N5 |
Fresno Peaker |
Forced |
22.69 |
0.00 |
PGAE South |
| ALAMIT_2_PL1X3 |
Alamitos Energy Center Unit 7 |
Planned |
674.70 |
674.70 |
SCE Gen |
| ALAMIT_7_UNIT 3 |
ALAMITOS GEN STA. UNIT 3 |
Planned |
321.40 |
0.00 |
SCE Gen |
| ALAMIT_7_UNIT 4 |
ALAMITOS GEN STA. UNIT 4 |
Planned |
334.43 |
334.43 |
SCE Gen |
| ALAMO_6_UNIT |
ALAMO POWER PLANT |
Planned |
17.00 |
17.00 |
SCE Gen |
| ALMASL_2_GS1SR1 |
Almasol Generating Station 1 |
Forced |
125.00 |
6.00 |
SCE Gen |
| ALMEGT_1_UNIT 1 |
ALAMEDA GT UNIT 1 |
Forced |
25.00 |
4.00 |
PGAE South |
| ALMEGT_1_UNIT 2 |
ALAMEDA GT UNIT 2 |
Forced |
25.00 |
4.00 |
PGAE South |
| ALPSLR_1_NTHSLR |
Alpaugh North, LLC |
Forced |
20.00 |
0.00 |
PGAE Gen |
| ALTA3A_2_CPCE4 |
Alta Wind 4 |
Forced |
102.00 |
3.00 |
SCE Gen |
| ALTA3A_2_CPCE5 |
Alta Wind 5 |
Forced |
168.00 |
3.00 |
SCE Gen |
| ALTA4A_2_CPCW1 |
Alta Wind 1 |
Forced |
150.00 |
0.00 |
SCE Gen |
| ALTA4B_2_CPCW2 |
Alta Wind 2 |
Forced |
150.00 |
0.00 |
SCE Gen |
| ALTA4B_2_CPCW3 |
Alta Wind 3 |
Forced |
150.00 |
0.00 |
SCE Gen |
| ALTA4B_2_CPCW6 |
Mustang Hills |
Planned |
150.00 |
6.00 |
SCE Gen |
| ALTA6B_2_WIND11 |
Alta Wind 11 |
Forced |
88.15 |
0.00 |
SCE Gen |
| ALTA6E_2_WIND10 |
Alta Wind 10 |
Forced |
134.84 |
2.85 |
SCE Gen |
| ALTWD_1_QF |
Altwind |
Forced |
28.84 |
28.84 |
SCE Gen |
| ANAHM_2_CANYN4 |
CANYON POWER PLANT UNIT 4 |
Planned |
49.40 |
0.00 |
SCE Gen |
| ASTORA_2_SOLAR1 |
Astoria 1 |
Forced |
100.00 |
0.00 |
SCE Gen |
| AVENAL_6_SUNCTY |
Sun City Solar Project |
Forced |
20.00 |
0.00 |
PGAE Gen |
| BARRE_6_PEAKER |
Barre Peaker |
Forced |
47.00 |
0.00 |
SCE Gen |
| BASICE_2_UNITS |
King City Cogen |
Forced |
120.00 |
29.99 |
PGAE Gen |
| BCTSYS_5_PWXDYN |
BCTSYS_5_PWXDYN |
Forced |
428.00 |
428.00 |
PGAE Gen |
| BDGRCK_1_UNITS |
BADGER CREEK LIMITED |
Forced |
48.08 |
0.00 |
PGAE South |
| BEARMT_1_UNIT |
Bear Mountain Limited |
Forced |
49.21 |
4.21 |
PGAE Gen |
| BGSKYN_2_AS2SR1 |
Antelope Solar 2 |
Forced |
105.00 |
0.00 |
SCE Gen |
| BGSKYN_2_ASPSR2 |
Antelope Solar 2 San Pablo |
Forced |
100.00 |
3.00 |
SCE Gen |
| BGSKYN_2_BS3SR3 |
Big Sky Solar 3 |
Forced |
20.00 |
0.00 |
SCE Gen |
| BIGCRK_2_EXESWD |
BIG CREEK HYDRO PROJECT PSP |
Planned/Forced |
820.00 |
600.00 |
SCE Gen |
| BIGSKY_2_BSKSR6 |
Big Sky Solar 6 |
Forced |
20.00 |
0.00 |
SCE Gen |
| BIGSKY_2_BSKSR7 |
Big Sky Solar 7 |
Forced |
20.00 |
0.00 |
SCE Gen |
| BIGSKY_2_BSKSR8 |
Big Sky Solar 8 |
Forced |
20.00 |
0.00 |
SCE Gen |
| BIGSKY_2_SOLAR1 |
Antelope Big Sky Ranch |
Forced |
20.00 |
2.00 |
SCE Gen |
| BIGSKY_2_SOLAR2 |
Big Sky Solar 4 |
Forced |
40.00 |
0.00 |
SCE Gen |
| BIGSKY_2_SOLAR3 |
Big Sky Summer |
Forced |
20.00 |
0.00 |
SCE Gen |
| BIGSKY_2_SOLAR4 |
Western Antelope Blue Sky Ranch B |
Forced |
20.00 |
0.00 |
SCE Gen |
| BIGSKY_2_SOLAR5 |
Big Sky Solar 2 |
Forced |
5.00 |
0.00 |
SCE Gen |
| BIGSKY_2_SOLAR6 |
Solverde 1 |
Forced |
85.00 |
0.00 |
SCE Gen |
| BIGSKY_2_SOLAR7 |
Big Sky Solar 1 |
Forced |
50.00 |
0.00 |
SCE Gen |
| BIOMAS_1_UNIT 1 |
WOODLAND BIOMASS |
Forced |
25.50 |
25.50 |
PGAE North |
| BISHOP_1_ALAMO |
BISHOP CREEK PLANT 2 AND 6 |
Planned |
13.40 |
11.10 |
SCE Gen |
| BISHOP_1_UNITS |
BISHOP CREEK PLANT 3 AND 4 |
Planned |
15.80 |
11.80 |
SCE Gen |
| BLACK_7_UNIT 1 |
JAMES B. BLACK 1 |
Forced |
85.00 |
2.00 |
PGAE North |
| BLAST_1_WIND |
Mountain View IV Wind |
Planned |
49.00 |
2.00 |
SCE Gen |
| BLCKBT_2_STONEY |
BLACK BUTTE HYDRO |
Forced |
6.20 |
6.20 |
PGAE Gen |
| BLCKWL_6_SOLAR1 |
Blackwell Solar |
Planned |
12.00 |
0.00 |
PGAE Gen |
| BLKCRK_2_SOLAR1 |
McCoy Station |
Forced |
250.00 |
0.00 |
SCE Gen |
| BLYTHE_1_SOLAR1 |
Blythe Solar 1 Project |
Forced |
21.00 |
0.00 |
SCE Gen |
| BNNIEN_7_ALTAPH |
ALTA POWER HOUSE |
Forced |
1.00 |
0.80 |
PGAE Gen |
| BOGUE_1_UNITA1 |
Feather River Energy Center, Unit #1 |
Planned |
47.60 |
47.60 |
PGAE North |
| BORDER_6_UNITA1 |
CalPeak Power Border Unit 1 |
Forced |
51.25 |
0.00 |
SDGE Gen |
| BRDSLD_2_MTZUM2 |
NextEra Energy Montezuma Wind II |
Forced |
78.20 |
0.00 |
PGAE Gen |
| BRDSLD_2_MTZUMA |
FPL Energy Montezuma Wind |
Forced |
36.80 |
0.00 |
PGAE Gen |
| BRDSLD_2_SHILO2 |
SHILOH WIND PROJECT 2 |
Planned/Forced |
150.00 |
10.00 |
PGAE Gen |
| BRDSLD_2_SHLO3A |
Shiloh III Wind Project, LLC |
Forced |
102.50 |
0.00 |
PGAE Gen |
| BRDSLD_2_SHLO3B |
Shiloh IV Wind Project |
Forced |
100.00 |
1.60 |
PGAE Gen |
| BRODIE_2_WIND |
Coram Brodie Wind Project |
Forced |
102.00 |
0.00 |
SCE Gen |
| BUCKCK_7_PL1X2 |
BUCKS CREEK AGGREGATE |
Planned/Forced |
57.25 |
57.25 |
PGAE Gen |
| BURNYF_2_UNIT 1 |
Burney Forest Power |
Forced |
29.00 |
0.00 |
PGAE Gen |
| CALPIN_1_AGNEW |
Agnews Power Plant |
Forced |
28.56 |
28.56 |
PGAE Gen |
| CAMCHE_1_PL1X3 |
CAMANCHE UNITS 1, 2 & 3 AGGREGATE |
Forced |
9.99 |
8.99 |
PGAE Gen |
| CANTUA_1_SOLAR |
Cantua Solar Station |
Planned |
20.00 |
20.00 |
PGAE South |
| CAPWD_1_QF |
Edom Hills Wind Farm |
Forced |
19.55 |
0.00 |
SCE Gen |
| CARBOU_7_PL2X3 |
CARIBOU PH 1 UNIT 2 & 3 AGGREGATE |
Forced |
49.00 |
49.00 |
PGAE North |
| CARBOU_7_UNIT 1 |
CARIBOU PH 1 UNIT 1 |
Planned |
24.00 |
24.00 |
PGAE North |
| CARLS1_2_CARCT1 |
Carlsbad 1 |
Planned |
422.00 |
0.00 |
SDGE Gen |
| CARLS2_1_CARCT1 |
Carlsbad 2 |
Planned |
105.50 |
0.00 |
SDGE Gen |
| CEDRCK_6_UNIT |
Water Wheel Ranch |
Forced |
0.98 |
0.00 |
PGAE Gen |
| CENTER_2_RHONDO |
MWD Rio Hondo Hydroelectric Recovery Pla |
Forced |
1.91 |
1.91 |
SCE Gen |
| CENTER_2_SOLAR1 |
Pico Rivera |
Forced |
0.90 |
0.00 |
SCE Gen |
| CENTER_6_PEAKER |
Center Peaker |
Forced |
47.11 |
3.11 |
SCE Gen |
| CHALK_1_UNIT |
CHALK CLIFF LIMITED |
Planned |
48.67 |
48.67 |
PGAE Gen |
| CHARMN_2_PGONG1 |
PROCTER AND GAMBLE OXNARD I |
Forced |
19.87 |
19.87 |
SCE Gen |
| CHINO_2_SASOLR |
SS San Antonio West LLC |
Forced |
1.50 |
0.00 |
SCE Gen |
| CHINO_7_MILIKN |
MN Milliken Genco LLC |
Forced |
1.90 |
1.90 |
SCE Gen |
| CHWCHL_1_BIOMAS |
Chow II Biomass to Energy |
Forced |
10.80 |
10.80 |
PGAE South |
| CLOVDL_1_SOLAR |
Cloverdale Solar I |
Forced |
1.50 |
0.00 |
PGAE Gen |
| CLOVER_2_UNIT |
Clover Creek |
Forced |
0.99 |
0.99 |
PGAE Gen |
| CNTNLA_2_SOLAR1 |
Centinela Solar Energy I |
Planned |
125.00 |
0.00 |
SDGE Gen |
| CNTNLA_2_SOLAR2 |
Centinels Solar Energy 2 |
Planned |
45.60 |
0.00 |
SDGE Gen |
| COCOPP_2_CTG1 |
Marsh Landing 1 |
Forced |
204.20 |
0.00 |
PGAE South |
| COCOPP_2_CTG2 |
Marsh Landing 2 |
Forced |
202.70 |
0.00 |
PGAE South |
| COCOPP_2_CTG3 |
Marsh Landing 3 |
Forced |
208.96 |
3.84 |
PGAE South |
| COCOPP_2_CTG4 |
Marsh Landing 4 |
Forced |
204.29 |
0.00 |
PGAE South |
| COLGAT_7_UNIT 1 |
Colgate Powerhouse Unit 1 |
Planned |
176.72 |
29.72 |
PGAE North |
| COLGAT_7_UNIT 2 |
Colgate Powerhouse Unit 2 |
Planned |
175.67 |
28.67 |
PGAE North |
| COLUSA_2_PL1X3 |
Colusa Generating Station |
Planned |
641.00 |
641.00 |
PGAE North |
| CONTRL_1_LUNDY |
LUNDY |
Planned |
3.00 |
2.75 |
SCE Gen |
| CONTRL_1_POOLE |
POOLE HYDRO PLANT 1 |
Planned |
10.90 |
10.15 |
SCE Gen |
| CONTRL_1_RUSHCK |
RUSH CREEK |
Planned |
11.94 |
10.94 |
SCE Gen |
| CORRAL_6_SJOAQN |
Ameresco San Joaquin |
Planned |
4.30 |
4.30 |
PGAE Gen |
| COVERD_2_HCKHY1 |
HATCHET CREEK |
Forced |
6.89 |
5.99 |
PGAE Gen |
| COVERD_2_MCKHY1 |
Montgomery Creek Hydro |
Forced |
2.80 |
1.80 |
PGAE Gen |
| COVERD_2_RCKHY1 |
ROARING CREEK |
Forced |
2.00 |
2.00 |
PGAE Gen |
| COWCRK_2_UNIT |
Cow Creek Hydro |
Forced |
2.00 |
2.00 |
PGAE Gen |
| CRESTA_7_PL1X2 |
CRESTA PH UNIT 1 & 2 AGGREGATE |
Forced |
70.40 |
70.40 |
PGAE North |
| CRNEVL_6_CRNVA |
Crane Valley |
Forced |
0.90 |
0.90 |
PGAE Gen |
| CROKET_7_UNIT |
CROCKETT COGEN |
Planned |
240.00 |
240.00 |
PGAE North |
| CRSTWD_6_KUMYAY |
Kumeyaay Wind Farm |
Forced |
50.00 |
0.00 |
SDGE Gen |
| CSCCOG_1_UNIT 1 |
SANTA CLARA CO-GEN |
Forced |
7.00 |
0.00 |
PGAE South |
| CSCGNR_1_UNIT 1 |
GIANERA PEAKER UNIT 1 |
Forced |
24.75 |
24.75 |
PGAE South |
| CSCGNR_1_UNIT 2 |
GIANERA PEAKER UNIT 2 |
Forced |
24.75 |
24.75 |
PGAE South |
| CSTRVL_7_PL1X2 |
Marina Land Fill Gas |
Forced |
4.53 |
0.13 |
PGAE South |
| CUYAMS_6_CUYSR1 |
Cuyama Solar |
Forced |
40.00 |
0.00 |
PGAE Gen |
| DAIRLD_1_MD2BM1 |
Madera Digester Genset 2 |
Forced |
0.80 |
0.00 |
PGAE Gen |
| DALYCT_1_FCELL |
PGE San Francisco State Fuel Cell |
Forced |
1.60 |
0.10 |
PGAE Gen |
| DAVIS_1_SOLAR1 |
Grasslands 3 |
Forced |
1.00 |
0.00 |
PGAE Gen |
| DAVIS_1_SOLAR2 |
Grasslands 4 |
Forced |
1.00 |
0.00 |
PGAE Gen |
| DEERCR_6_UNIT 1 |
DEER CREEK |
Forced |
7.00 |
7.00 |
PGAE North |
| DELAMO_2_SOLAR3 |
Golden Springs Building G |
Forced |
1.25 |
0.00 |
SCE Gen |
| DELAMO_2_SOLAR4 |
Golden Springs Building F |
Forced |
1.30 |
0.00 |
SCE Gen |
| DELAMO_2_SOLAR5 |
Golden Springs Building L |
Forced |
1.00 |
0.00 |
SCE Gen |
| DELSUR_6_BSOLAR |
Central Antelope Dry Ranch B |
Forced |
3.00 |
3.00 |
SCE Gen |
| DELTA_2_PL1X4 |
DELTA ENERGY CENTER AGGREGATE |
Forced |
880.00 |
24.00 |
PGAE Gen |
| DIABLO_7_UNIT 2 |
Diablo Canyon Unit 2 |
Planned |
1150.00 |
1150.00 |
PGAE South |
| DISCOV_1_CHEVRN |
CHEVRON USA (EASTRIDGE) |
Forced |
48.80 |
27.80 |
PGAE Gen |
| DONNLS_7_UNIT |
Donnells Hydro |
Forced |
72.00 |
3.00 |
PGAE Gen |
| DOUBLC_1_UNITS |
DOUBLE "C" LIMITED |
Forced |
52.23 |
0.73 |
PGAE South |
| DRACKR_2_DSUBT2 |
Dracker Solar Unit 2 BESS |
Planned |
115.00 |
0.00 |
SCE Gen |
| DRACKR_2_DSUBT3 |
Dracker Solar Unit 3 BESS |
Planned |
115.00 |
84.00 |
SCE Gen |
| DRACKR_2_SOLAR2 |
Dracker Solar Unit 2 |
Planned |
125.00 |
0.00 |
SCE Gen |
| DREWS_6_PL1X4 |
Drews Generating Plant |
Forced |
41.40 |
20.70 |
SCE Gen |
| DRUM_7_UNIT 5 |
DRUM PH 2 UNIT 5 |
Forced |
50.00 |
39.00 |
PGAE North |
| DSRTSN_2_SOLAR1 |
Desert Sunlight 300 |
Forced |
300.00 |
0.00 |
SCE Gen |
| DUANE_1_PL1X3 |
DONALD VON RAESFELD POWER PROJECT |
Forced |
147.80 |
7.80 |
PGAE South |
| DUTCH1_7_UNIT 1 |
DUTCH FLAT 1 PH |
Planned |
22.00 |
22.00 |
PGAE North |
| DUTCH2_7_UNIT 1 |
DUTCH FLAT 2 PH |
Forced |
26.00 |
22.50 |
PGAE North |
| DVLCYN_1_UNITS |
DEVIL CANYON HYDRO UNITS 1-4 AGGREGATE |
Planned/Forced |
235.00 |
75.00 |
SCE Gen |
| EASTWD_7_UNIT |
EASTWOOD PUMP-GEN |
Planned |
200.00 |
200.00 |
SCE Gen |
| EEKTMN_6_SOLAR1 |
EE K Solar 1 |
Planned |
20.00 |
1.00 |
PGAE South |
| ELCABO_5_ECWSCEDYN |
El Cabo Wind |
Forced |
298.00 |
29.00 |
APS Gen |
| ELCABO_5_ECWSCEDYN |
El Cabo Wind |
Forced |
298.00 |
29.00 |
SCE Gen |
| ELCAJN_6_EB1BT1 |
Eastern BESS 1 |
Planned |
7.50 |
0.00 |
SDGE Gen |
| ELCAP_1_SOLAR |
2097 Helton |
Forced |
1.50 |
0.00 |
PGAE Gen |
| ELECTR_7_PL1X3 |
ELECTRA PH UNIT 1 & 2 AGGREGATE |
Planned/Forced |
93.00 |
61.30 |
PGAE North |
| ELKCRK_6_STONYG |
STONEY GORGE HYDRO AGGREGATE |
Forced |
4.90 |
4.90 |
PGAE Gen |
| ELKHIL_2_PL1X3 |
ELK HILLS COMBINED CYCLE (AGGREGATE) |
Forced |
551.70 |
151.70 |
PGAE Gen |
| ELSEGN_2_UN1011 |
El Segundo Energy Center 5/6 |
Planned |
263.00 |
263.00 |
SCE Gen |
| ELSEGN_2_UN2021 |
El Segundo Energy Center 7/8 |
Forced |
263.68 |
0.00 |
SCE Gen |
| ETIWND_2_FONTNA |
FONTANALYTLE CREEK POWERHOUSE P |
Planned |
2.56 |
2.16 |
SCE Gen |
| ETIWND_2_SOLAR1 |
Dedeaux Ontario |
Forced |
1.00 |
0.00 |
SCE Gen |
| ETIWND_2_SOLAR2 |
Rochester |
Forced |
1.00 |
0.00 |
SCE Gen |
| ETIWND_2_UNIT1 |
ETIWND_2_UNIT1 |
Planned |
33.60 |
31.60 |
SCE Gen |
| EXCHEC_7_UNIT 1 |
EXCHEQUER HYDRO |
Forced |
94.50 |
18.50 |
PGAE South |
| EXCLSG_1_SOLAR |
Excelsior Solar |
Forced |
60.00 |
2.00 |
PGAE Gen |
| FLOWD2_2_FPLWND |
DIABLO WINDS |
Forced |
18.00 |
1.80 |
PGAE Gen |
| FORKBU_6_UNIT |
HYPOWER, INC. (FORKS OF BUTTE) |
Forced |
14.30 |
14.30 |
PGAE Gen |
| FROGTN_1_UTICAM |
Murphys Powerhouse |
Forced |
3.60 |
2.00 |
PGAE Gen |
| GARNET_2_HYDRO |
Whitewater Hydro |
Forced |
1.00 |
1.00 |
SCE Gen |
| GARNET_2_WIND2 |
Karen Avenue Wind Farm |
Planned |
11.70 |
1.50 |
SCE Gen |
| GARNET_2_WPMWD6 |
WINTEC PALM |
Forced |
5.93 |
5.93 |
SCE Gen |
| GATES_2_SOLAR |
Gates Solar Station |
Forced |
20.00 |
10.00 |
PGAE South |
| GATEWY_2_GESBT1 |
Gateway Energy Stroage |
Forced |
250.00 |
0.00 |
SDGE Gen |
| GATWAY_2_PL1X3 |
GATEWAY GENERATING STATION |
Forced |
585.00 |
35.10 |
PGAE South |
| GEYS11_7_UNIT11 |
GEYSERS UNIT 11 (HEALDSBURG) |
Forced |
86.80 |
9.80 |
PGAE Gen |
| GEYS12_7_UNIT12 |
GEYSERS UNIT 12 (HEALDSBURG) |
Forced |
57.00 |
9.00 |
PGAE Gen |
| GEYS13_7_UNIT13 |
GEYSERS UNIT 13 (HEALDSBURG) |
Forced |
73.00 |
73.00 |
PGAE Gen |
| GEYS14_7_UNIT14 |
GEYSERS UNIT 14 (HEALDSBURG) |
Forced |
70.00 |
3.00 |
PGAE Gen |
| GEYS16_7_UNIT16 |
GEYSERS UNIT 16 (HEALDSBURG) |
Forced |
63.00 |
10.00 |
PGAE Gen |
| GEYS17_7_UNIT17 |
GEYSERS UNIT 17 (HEALDSBURG) |
Forced |
75.50 |
75.50 |
PGAE Gen |
| GEYS18_7_UNIT18 |
GEYSERS UNIT 18 (HEALDSBURG) |
Forced |
72.00 |
72.00 |
PGAE Gen |
| GEYS20_7_UNIT20 |
GEYSERS UNIT 20 (HEALDSBURG) |
Forced |
50.00 |
50.00 |
PGAE Gen |
| GILROY_1_UNIT |
GILROY COGEN AGGREGATE |
Forced |
120.00 |
9.00 |
PGAE South |
| GLNARM_7_UNIT 1 |
GLEN ARM UNIT 1 |
Planned |
22.07 |
22.07 |
SCE Gen |
| GLNARM_7_UNIT 2 |
GLEN ARM UNIT 2 |
Forced |
22.30 |
22.30 |
SCE Gen |
| GOLETA_2_VALBT1 |
Vallecito Energy Storage |
Forced |
10.00 |
8.00 |
SCE Gen |
| GOLETA_6_EXGEN |
EXXON COMPANY USA |
Forced |
48.20 |
48.20 |
SCE Gen |
| GRIZLY_1_UNIT 1 |
GRIZZLY HYDRO |
Forced |
20.00 |
20.00 |
PGAE North |
| GRNVLY_7_SCLAND |
SANTA CRUZ LANDFILL GENERATING PLANT |
Forced |
3.04 |
1.35 |
PGAE South |
| GUERNS_6_HD3BM3 |
Hanford Digester Genset 3 |
Forced |
1.00 |
0.00 |
PGAE Gen |
| GUERNS_6_VH2BM1 |
Hanford Digester Genset 2 |
Forced |
1.00 |
0.00 |
PGAE Gen |
| GWFPWR_1_UNITS |
Hanford Peaker Plant |
Forced |
98.46 |
0.64 |
PGAE Gen |
| GYS5X6_7_UNITS |
GEYSERS UNITS 5 & 6 AGGREGATE |
Forced |
98.43 |
16.43 |
PGAE Gen |
| GYS7X8_7_UNITS |
GEYSERS UNITS 7 & 8 AGGREGATE |
Forced |
95.80 |
12.80 |
PGAE Gen |
| HATLOS_6_BWDHY1 |
Bidwell Ditch |
Forced |
2.00 |
0.50 |
PGAE Gen |
| HATLOS_6_LSCRK |
Lost Creek 1 & 2 Hydro Conversion |
Forced |
1.70 |
0.71 |
PGAE Gen |
| HATRDG_2_WIND |
Hatchet Ridge Wind Farm |
Forced |
102.00 |
0.00 |
PGAE Gen |
| HELMPG_7_UNIT 2 |
HELMS PUMP-GEN UNIT 2 |
Planned |
407.00 |
407.00 |
PGAE South |
| HENRTA_6_SOLAR1 |
Lemoore 1 |
Forced |
1.50 |
1.50 |
PGAE Gen |
| HENRTA_6_UNITA1 |
GWF HENRIETTA PEAKER PLANT UNIT 1 |
Forced |
49.98 |
0.00 |
PGAE South |
| HENRTA_6_UNITA2 |
GWF HENRIETTA PEAKER PLANT UNIT 2 |
Forced |
49.42 |
1.66 |
PGAE South |
| HIDSRT_2_UNITS |
HIGH DESERT POWER PROJECT AGGREGATE |
Forced |
830.00 |
72.00 |
SCE Gen |
| HINSON_6_LBECH1 |
Long Beach Unit 1 |
Forced |
63.00 |
7.00 |
SCE Gen |
| HINSON_6_LBECH2 |
Long Beach Unit 2 |
Forced |
63.00 |
9.00 |
SCE Gen |
| HINSON_6_LBECH3 |
Long Beach Unit 3 |
Forced |
63.00 |
12.00 |
SCE Gen |
| HINSON_6_LBECH4 |
Long Beach Unit 4 |
Forced |
63.00 |
11.00 |
SCE Gen |
| HMLTBR_6_UNITS |
HAMILTON BRANCH PH (AGGREGATE) |
Forced |
4.90 |
4.90 |
PGAE Gen |
| HNTGBH_7_UNIT 2 |
HUNTINGTON BEACH GEN STA. UNIT 2 |
Planned/Forced |
225.80 |
225.80 |
SCE Gen |
| HOLSTR_1_SOLAR2 |
Hollister Solar |
Forced |
1.50 |
0.00 |
PGAE Gen |
| HOOVER_2_MWDDYN |
HOOVER |
Planned/Forced |
249.00 |
95.00 |
SCE Gen |
| HOOVER_2_VEADYN |
HOOVER |
Forced |
16.00 |
5.00 |
SCE Gen |
| HUMBPP_1_UNITS3 |
Humboldt Bay Generating Station 3 |
Planned |
65.08 |
16.27 |
PGAE North |
| HUMBPP_6_UNITS |
Humboldt Bay Generating Station 1 |
Planned/Forced |
97.62 |
0.00 |
PGAE North |
| HYTTHM_2_UNITS |
HYATT-THERMALITO PUMP-GEN (AGGREGATE) |
Planned |
933.10 |
633.10 |
PGAE Gen |
| INDIGO_1_UNIT 1 |
INDIGO PEAKER UNIT 1 |
Planned |
44.00 |
44.00 |
SCE Gen |
| INDIGO_1_UNIT 2 |
INDIGO PEAKER UNIT 2 |
Planned |
44.53 |
44.53 |
SCE Gen |
| INDIGO_1_UNIT 3 |
INDIGO PEAKER UNIT 3 |
Planned |
43.69 |
43.69 |
SCE Gen |
| INSKIP_2_UNIT |
INSKIP HYDRO |
Forced |
8.00 |
8.00 |
PGAE North |
| INTKEP_2_UNITS |
CCSF Hetch_Hetchy Hydro Aggregate |
Planned/Forced |
405.00 |
129.00 |
PGAE Gen |
| INTMNT_3_ANAHEIM |
Intermountain Power Project |
Forced |
236.00 |
0.00 |
SCE Gen |
| IVWEST_2_SOLAR1 |
Imperial Valley West ( Q # 608) |
Forced |
150.00 |
0.00 |
SDGE Gen |
| JACMSR_1_JACSR1 |
Jacumba Solar Farm |
Planned |
20.00 |
0.00 |
SDGE Gen |
| JAWBNE_2_NSRWND |
North Sky River Wind Project |
Forced |
160.00 |
12.00 |
SCE Gen |
| JAYNE_6_WLSLR |
Westlands Solar Farm PV 1 |
Planned |
18.00 |
1.00 |
PGAE Gen |
| KEKAWK_6_UNIT |
STS HYDROPOWER LTD. (KEKAWAKA) |
Forced |
5.50 |
5.50 |
PGAE Gen |
| KELSO_2_UNITS |
Mariposa Energy |
Planned |
198.03 |
106.25 |
PGAE Gen |
| KERKH1_7_UNIT 1 |
KERKHOFF PH 1 UNIT #1 |
Forced |
13.00 |
13.00 |
PGAE North |
| KERKH1_7_UNIT 1 |
KERKHOFF PH 1 UNIT #1 |
Forced |
13.00 |
13.00 |
PGAE South |
| KERKH1_7_UNIT 3 |
KERKHOFF PH 1 UNIT #3 |
Forced |
12.80 |
12.80 |
PGAE North |
| KERKH1_7_UNIT 3 |
KERKHOFF PH 1 UNIT #3 |
Forced |
12.80 |
12.80 |
PGAE South |
| KERKH2_7_UNIT 1 |
KERKHOFF PH 2 UNIT #1 |
Planned/Forced |
153.90 |
153.90 |
PGAE North |
| KERKH2_7_UNIT 1 |
KERKHOFF PH 2 UNIT #1 |
Planned/Forced |
153.90 |
153.90 |
PGAE South |
| KERNFT_1_UNITS |
KERN FRONT LIMITED |
Planned/Forced |
52.40 |
0.00 |
PGAE South |
| KERRGN_1_UNIT 1 |
KERN RIVER HYDRO UNITS 1-4 AGGREGATE |
Forced |
25.60 |
10.60 |
SCE Gen |
| KILARC_2_UNIT 1 |
KILARC HYDRO |
Forced |
1.50 |
1.50 |
PGAE North |
| KINGRV_7_UNIT 1 |
KINGS RIVER HYDRO UNIT 1 |
Planned |
51.20 |
51.20 |
PGAE South |
| KNGBRG_1_KBSLR1 |
Kingsburg1 |
Forced |
1.50 |
0.00 |
PGAE South |
| KNGBRG_1_KBSLR2 |
Kingsburg2 |
Forced |
1.50 |
0.00 |
PGAE South |
| KNGCTY_6_UNITA1 |
King City Energy Center, Unit 1 |
Forced |
44.60 |
44.60 |
PGAE Gen |
| KRAMER_2_SEGS89 |
LUZ SOLAR PARTNERS 8-9 AGGREGATE |
Forced |
80.00 |
0.00 |
SCE Gen |
| KRNCNY_6_UNIT |
KERN CANYON |
Forced |
11.50 |
11.50 |
PGAE South |
| LAMONT_1_SOLAR4 |
Hayworth Solar Farm |
Forced |
26.66 |
12.66 |
PGAE South |
| LAPAC_6_UNIT |
LOUISIANA PACIFIC SAMOA |
Forced |
20.00 |
20.00 |
PGAE Gen |
| LAPLMA_2_UNIT 1 |
La Paloma Generating Plant Unit #1 |
Forced |
267.00 |
137.00 |
PGAE Gen |
| LAPLMA_2_UNIT 2 |
La Paloma Generating Plant Unit #2 |
Forced |
266.00 |
24.00 |
PGAE Gen |
| LAPLMA_2_UNIT 3 |
La Paloma Generating Plant Unit #3 |
Forced |
266.00 |
13.00 |
PGAE Gen |
| LAPLMA_2_UNIT 4 |
LA PALOMA GENERATING PLANT, UNIT #4 |
Forced |
267.00 |
26.00 |
PGAE Gen |
| LAROA2_2_UNITA1 |
LR2 |
Forced |
322.00 |
2.00 |
SDGE Gen |
| LEBECS_2_UNITS |
Pastoria Energy Facility |
Planned/Forced |
799.47 |
265.47 |
SCE Gen |
| LECEF_1_UNITS |
LOS ESTEROS ENERGY FACILITY AGGREGATE |
Forced |
309.84 |
10.84 |
PGAE South |
| LEPRFD_1_KANSAS |
Kansas |
Planned |
20.00 |
0.00 |
PGAE Gen |
| LITLRK_6_GBCSR1 |
Green Beanworks C |
Forced |
3.00 |
1.50 |
SCE Gen |
| LIVOAK_1_UNIT 1 |
LIVE OAK LIMITED |
Forced |
49.70 |
5.70 |
PGAE South |
| LMBEPK_2_UNITA1 |
Lambie Energy Center, Unit #1 |
Forced |
47.50 |
1.50 |
PGAE Gen |
| LMEC_1_PL1X3 |
Los Medanos Energy Center AGGREGATE |
Forced |
580.00 |
0.00 |
PGAE Gen |
| LNCSTR_6_SOLAR2 |
SEPV Sierra NGR |
Forced |
2.75 |
0.00 |
SCE Gen |
| LOCKFD_1_BEARCK |
Bear Creek Solar |
Forced |
1.50 |
0.00 |
PGAE Gen |
| LODI25_2_UNIT 1 |
LODI GAS TURBINE |
Forced |
25.00 |
2.00 |
PGAE Gen |
| LODIEC_2_PL1X2 |
Lodi Energy Center |
Forced |
302.58 |
2.58 |
PGAE Gen |
| MAGNLA_6_ANAHEIM |
Magnolia Power Plant Anaheim |
Planned |
109.00 |
109.00 |
SCE Gen |
| MAGNLA_6_CERRITOS |
Magnolia Power Plant Cerritos |
Planned |
12.00 |
12.00 |
SCE Gen |
| MAGNLA_6_COLTON |
Magnolia Power Project |
Planned |
12.00 |
12.00 |
SCE Gen |
| MALCHQ_7_UNIT 1 |
MALACHA HYDRO L.P. |
Forced |
32.50 |
0.00 |
PGAE Gen |
| MARCPW_6_SOLAR1 |
Maricopa West Solar PV |
Forced |
20.00 |
4.00 |
PGAE Gen |
| MCCALL_1_QF |
Fish Water |
Forced |
0.52 |
0.52 |
PGAE Gen |
| MERCFL_6_UNIT |
Merced Falls Powerhouse |
Planned |
3.50 |
3.50 |
PGAE South |
| METEC_2_PL1X3 |
Metcalf Energy Center |
Forced |
593.16 |
16.16 |
PGAE Gen |
| MIRLOM_2_CORONA |
MWD Corona Hydroelectric Recovery Plant |
Forced |
2.85 |
2.85 |
SCE Gen |
| MIRLOM_2_MLBBTA |
Mira Loma BESS A |
Planned |
10.00 |
0.00 |
SCE Gen |
| MIRLOM_2_MLBBTB |
Mira Loma BESS B |
Planned |
10.00 |
0.00 |
SCE Gen |
| MIRLOM_2_TEMESC |
MWD Temescal Hydroelectric Recovery Plan |
Forced |
2.85 |
2.85 |
SCE Gen |
| MIRLOM_6_PEAKER |
Mira Loma Peaker |
Planned |
46.00 |
46.00 |
SCE Gen |
| MKTRCK_1_UNIT 1 |
MCKITTRICK LIMITED |
Forced |
47.49 |
0.00 |
PGAE South |
| MNDALY_6_MCGRTH |
McGrath Beach Peaker |
Forced |
47.20 |
4.18 |
SCE Gen |
| MOJAVW_2_SOLAR |
Mojave West |
Forced |
20.00 |
0.00 |
SCE Gen |
| MONLTH_6_BATTRY |
Tehachapi Storage Project |
Forced |
7.99 |
3.99 |
SCE Gen |
| MONTPH_7_UNITS |
MONTICELLO HYDRO AGGREGATE |
Forced |
12.50 |
12.50 |
PGAE Gen |
| MOORPK_2_ACOBT1 |
Acorn I BESS |
Forced |
2.00 |
2.00 |
SCE Gen |
| MOORPK_2_CALABS |
Calabasas Gas-to-Energy Facility |
Forced |
6.96 |
4.46 |
SCE Gen |
| MOSSLD_2_PSP1 |
MOSS LANDING POWER BLOCK 1 |
Forced |
510.00 |
5.00 |
PGAE South |
| MRCHNT_2_PL1X3 |
Desert Star Energy Center |
Forced |
494.58 |
19.58 |
SDGE Gen |
| MRGT_6_MEF2 |
Miramar Energy Facility II |
Planned |
44.00 |
44.00 |
SDGE Gen |
| MSQUIT_5_SERDYN |
MSQUIT_5_SERDYN |
Forced |
625.00 |
0.00 |
SDGE Gen |
| MSTANG_2_SOLAR |
Mustang |
Forced |
30.00 |
5.00 |
PGAE Gen |
| MSTANG_2_SOLAR3 |
Mustang 3 |
Forced |
40.00 |
7.00 |
PGAE Gen |
| MSTANG_2_SOLAR4 |
Mustang 4 |
Forced |
30.00 |
2.00 |
PGAE Gen |
| MTNPOS_1_UNIT |
MT.POSO COGENERATION CO. |
Planned |
46.64 |
46.64 |
PGAE South |
| MTWIND_1_UNIT 1 |
Mountain View Power Project I |
Planned/Forced |
44.40 |
6.00 |
SCE Gen |
| MTWIND_1_UNIT 2 |
Mountain View Power Project II |
Planned/Forced |
22.20 |
1.80 |
SCE Gen |
| NAROW1_2_UNIT |
NARROWS PH 1 UNIT |
Planned |
12.00 |
3.20 |
PGAE North |
| NAROW2_2_UNIT |
Narrows Powerhouse Unit 2 |
Planned |
55.00 |
55.00 |
PGAE North |
| NCPA_7_GP1UN1 |
NCPA GEO PLANT 1 UNIT 1 |
Forced |
38.85 |
38.85 |
PGAE Gen |
| NCPA_7_GP1UN2 |
NCPA GEO PLANT 1 UNIT 2 |
Forced |
39.94 |
39.94 |
PGAE Gen |
| NCPA_7_GP2UN3 |
NCPA GEO PLANT 2 UNIT 3 |
Forced |
42.42 |
42.42 |
PGAE Gen |
| NGILAA_5_SDGDYN |
NGILAA_5_SDGDYN |
Forced |
57.00 |
0.00 |
APS Gen |
| NGILAA_5_SDGDYN |
NGILAA_5_SDGDYN |
Forced |
57.00 |
0.00 |
SDGE Gen |
| NHOGAN_6_UNITS |
NEW HOGAN PH AGGREGATE |
Planned |
4.00 |
4.00 |
PGAE Gen |
| OAK C_7_UNIT 1 |
OAKLAND STATION C GT UNIT 1 |
Forced |
55.00 |
0.00 |
PGAE South |
| OAK C_7_UNIT 3 |
OAKLAND STATION C GT UNIT 3 |
Forced |
55.00 |
28.00 |
PGAE South |
| OASIS_6_SOLAR1 |
Morgan Lancaster I |
Forced |
1.50 |
0.00 |
SCE Gen |
| OASIS_6_SOLAR2 |
Oasis Solar |
Forced |
20.00 |
0.00 |
SCE Gen |
| OILFLD_7_QFUNTS |
Nacimiento Hydroelectric Plant |
Forced |
3.80 |
3.80 |
PGAE South |
| OLDRIV_6_CESDBM |
Ces Dairy Biogas |
Forced |
1.00 |
0.00 |
PGAE Gen |
| OLDRIV_6_LKVBM1 |
Lakeview Dairy Biogas |
Forced |
1.00 |
0.00 |
PGAE Gen |
| OLDRV1_6_SOLAR |
Old River One |
Forced |
20.00 |
0.00 |
PGAE Gen |
| OLINDA_2_COYCRK |
MWD Coyote Creek Hydroelectric Recovery |
Forced |
3.13 |
3.13 |
SCE Gen |
| OLINDA_2_LNDFL2 |
Brea Power II |
Forced |
28.10 |
3.10 |
SCE Gen |
| OLSEN_2_UNIT |
OLSEN POWER PARTNERS |
Forced |
5.80 |
5.80 |
PGAE Gen |
| OMAR_2_UNIT 1 |
KERN RIVER COGENERATION CO. UNIT 1 |
Forced |
78.00 |
0.00 |
SCE Gen |
| OMAR_2_UNIT 2 |
KERN RIVER COGENERATION CO. UNIT 2 |
Forced |
78.11 |
0.00 |
SCE Gen |
| OMAR_2_UNIT 3 |
KERN RIVER COGENERATION CO. UNIT 3 |
Forced |
81.41 |
0.00 |
SCE Gen |
| OMAR_2_UNIT 4 |
KERN RIVER COGENERATION CO. UNIT 4 |
Forced |
81.44 |
7.44 |
SCE Gen |
| ORMOND_7_UNIT 2 |
ORMOND BEACH GEN STA. UNIT 2 |
Planned |
750.00 |
750.00 |
SCE Gen |
| OROVIL_6_UNIT |
Oroville Cogeneration, LP |
Forced |
7.50 |
7.50 |
PGAE Gen |
| OTMESA_2_PL1X3 |
OTAY MESA ENERGY CENTER |
Forced |
603.68 |
22.68 |
SDGE Gen |
| PACLUM_6_UNIT |
Humboldt Redwood |
Forced |
28.80 |
20.80 |
PGAE North |
| PADUA_2_ONTARO |
ONTARIO/SIERRA HYDRO PSP |
Planned |
1.92 |
0.92 |
SCE Gen |
| PALALT_7_COBUG |
Cooperatively Owned Back Up Generator |
Forced |
4.50 |
4.50 |
PGAE Gen |
| PARDEB_6_UNITS |
Pardee Power House |
Forced |
30.00 |
30.00 |
PGAE Gen |
| PEARBL_2_NSPIN |
PEARBL_2_NSPIN |
Forced |
118.00 |
0.00 |
SCE Gen |
| PINFLT_7_UNITS |
PINE FLAT HYDRO AGGREGATE |
Planned |
198.51 |
114.51 |
PGAE Gen |
| PIOPIC_2_CTG1 |
Pio Pico Unit 1 |
Forced |
111.30 |
1.72 |
SDGE Gen |
| PIOPIC_2_CTG2 |
Pio Pico Unit 2 |
Forced |
112.70 |
1.30 |
SDGE Gen |
| PIOPIC_2_CTG3 |
Pio Pico Unit 3 |
Forced |
112.00 |
0.00 |
SDGE Gen |
| PIT1_7_UNIT 1 |
PIT PH 1 UNIT 1 |
Planned/Forced |
32.00 |
32.00 |
PGAE North |
| PIT4_7_PL1X2 |
PIT PH 4 UNITS 1 & 2 AGGREGATE |
Planned |
95.00 |
95.00 |
PGAE North |
| PIT5_7_PL1X2 |
PIT PH 5 UNITS 1 & 2 AGGREGATE |
Planned |
82.00 |
0.00 |
PGAE North |
| PIT5_7_PL3X4 |
PIT PH 5 UNITS 3 & 4 AGGREGATE |
Planned |
82.00 |
41.00 |
PGAE North |
| PIT6_7_UNIT 1 |
PIT PH 6 UNIT 1 |
Forced |
39.00 |
0.00 |
PGAE North |
| PIT6_7_UNIT 2 |
PIT PH 6 UNIT 2 |
Forced |
40.00 |
0.94 |
PGAE North |
| PIT7_7_UNIT 1 |
PIT PH 7 UNIT 1 |
Forced |
55.70 |
4.74 |
PGAE North |
| PIT7_7_UNIT 2 |
PIT PH 7 UNIT 2 |
Planned/Forced |
54.60 |
54.60 |
PGAE North |
| PLACVL_1_CHILIB |
Chili Bar Hydro |
Planned |
8.40 |
8.40 |
PGAE Gen |
| PLMSSR_6_HISIER |
High Sierra Cogeneration Aggregate |
Forced |
6.00 |
2.99 |
PGAE Gen |
| PNCHEG_2_PL1X4 |
PANOCHE ENERGY CENTER (Aggregated) |
Forced |
401.00 |
95.00 |
PGAE Gen |
| PNCHPP_1_PL1X2 |
Midway Peaking Aggregate |
Forced |
119.91 |
1.91 |
PGAE Gen |
| PNCHVS_2_SOLAR |
Panoche Valley Solar |
Forced |
140.00 |
0.00 |
PGAE Gen |
| PNOCHE_1_PL1X2 |
Panoche Peaker |
Forced |
49.97 |
49.97 |
PGAE South |
| PNOCHE_1_UNITA1 |
CalPeak Power Panoche Unit 1 |
Forced |
52.01 |
0.00 |
PGAE Gen |
| POEPH_7_UNIT 1 |
POE HYDRO UNIT 1 |
Forced |
69.00 |
67.00 |
PGAE North |
| POEPH_7_UNIT 2 |
POE HYDRO UNIT 2 |
Planned/Forced |
68.50 |
68.50 |
PGAE North |
| POTTER_6_UNITS |
Potter Valley |
Forced |
10.10 |
9.10 |
PGAE North |
| PVERDE_5_SCEDYN |
PVERDE_5_SCEDYN |
Forced |
635.00 |
40.00 |
SCE Gen |
| PWEST_1_UNIT |
PACIFIC WEST 1 WIND GENERATION |
Forced |
2.10 |
2.10 |
SCE Gen |
| PYGS_1_PYRAMID A2 |
Pyramid 34P |
Planned |
81.60 |
40.00 |
PNM Gen |
| RAMON_2_SCEDYN |
RAMON_2_SCEDYN |
Forced |
106.18 |
46.18 |
SCE Gen |
| RCKCRK_7_UNIT 1 |
ROCK CREEK HYDRO UNIT 1 |
Forced |
57.00 |
50.00 |
PGAE North |
| RCKCRK_7_UNIT 2 |
ROCK CREEK HYDRO UNIT 2 |
Forced |
56.90 |
49.90 |
PGAE North |
| RECTOR_2_KAWEAH |
KAWEAH PH 2 & 3 PSP AGGREGATE |
Forced |
6.55 |
5.95 |
SCE Gen |
| RECTOR_2_KAWH 1 |
KAWEAH PH 1 UNIT 1 |
Forced |
2.25 |
2.25 |
SCE Gen |
| RECTOR_2_QF |
Kaweah Unit 1 |
Planned |
20.09 |
3.09 |
SCE Gen |
| REDMAN_6_AVSSR1 |
Antelope Valley Solar |
Forced |
3.00 |
0.00 |
SCE Gen |
| REDOND_7_UNIT 5 |
REDONDO GEN STA. UNIT 5 |
Planned |
178.87 |
178.87 |
SCE Gen |
| RICHMN_7_BAYENV |
BAY ENVIRONMENTAL (NOVE POWER) |
Forced |
2.50 |
1.95 |
PGAE Gen |
| RIOBRV_6_UNIT 1 |
RIO BRAVO HYDRO |
Forced |
14.00 |
14.00 |
PGAE Gen |
| RNDSBG_1_HZASR1 |
Hazel A |
Forced |
2.99 |
0.00 |
SCE Gen |
| ROLLIN_6_UNIT |
ROLLINS HYDRO |
Forced |
13.50 |
11.37 |
PGAE North |
| ROSMDW_2_WIND1 |
Pacific Wind - Phase 1 |
Planned |
140.00 |
2.00 |
SCE Gen |
| RTEDDY_2_SOLAR1 |
Rosamond West Solar 1 |
Forced |
54.00 |
16.00 |
SCE Gen |
| RTREE_2_WIND2 |
Rising Tree 2 |
Forced |
19.80 |
3.30 |
SCE Gen |
| RUSCTY_2_UNITS |
Russell City Energy Center |
Forced |
615.18 |
0.00 |
PGAE South |
| SALTSP_7_UNITS |
SALT SPRINGS HYDRO AGGREGATE |
Forced |
46.00 |
46.00 |
PGAE North |
| SANDLT_2_SUNITS |
Mojave Solar |
Planned |
275.00 |
137.50 |
SCE Gen |
| SANTFG_7_UNITS |
GEYSERS CALISTOGA AGGREGATE |
Forced |
72.00 |
72.00 |
PGAE Gen |
| SANTGO_2_LNDFL1 |
Bowerman Power |
Forced |
19.60 |
3.60 |
SCE Gen |
| SANTGO_2_MABBT1 |
Millikan Avenue BESS |
Forced |
2.00 |
2.00 |
SCE Gen |
| SANWD_1_QF |
San Gorgonio Farms Wind Farm |
Planned |
31.00 |
6.48 |
SCE Gen |
| SBERDO_2_SNTANA |
SANTA ANA PSP |
Planned |
6.95 |
6.95 |
SCE Gen |
| SBERDO_6_MILLCK |
MILL CREEK PSP |
Planned |
3.93 |
2.43 |
SCE Gen |
| SCEC_1_PDRP124 |
LCR AMS Hybrid West LA 1-C-LCRLL |
Forced |
1.56 |
0.00 |
SCE Gen |
| SCEC_1_PDRP172 |
LCR AMS Hybrid West LA 1-C-LSCE |
Forced |
0.52 |
0.00 |
SCE Gen |
| SCEC_1_PDRP173 |
LCR AMS Hybrid West LA 2-C-LSCE |
Forced |
1.97 |
0.00 |
SCE Gen |
| SCEC_1_PDRP34 |
LCR AMS Hybrid West LA 1-C-LCRLL |
Forced |
0.23 |
0.00 |
SCE Gen |
| SCEHOV_2_HOOVER |
SCEHOV_2_HOOVER |
Planned/Forced |
287.01 |
110.01 |
SCE Gen |
| SCEW_2_PDRP03 |
LCR AMS Hybrid Irvine 1-W-LPIPO |
Forced |
5.00 |
0.00 |
SCE Gen |
| SCEW_2_PDRP09 |
LCR AMS Hybrid Irvine 2-W-LPIPO |
Forced |
2.60 |
2.60 |
SCE Gen |
| SCEW_2_PDRP10 |
LCR AMS Hybrid Irvine 2-W-LSCE |
Forced |
2.50 |
0.00 |
SCE Gen |
| SCEW_2_PDRP114 |
LCR AMS Hybrid West LA 1-W-SCE |
Forced |
18.71 |
0.00 |
SCE Gen |
| SCEW_2_PDRP115 |
LCR AMS Hybrid West LA 1-W-LCRLL |
Forced |
3.50 |
0.00 |
SCE Gen |
| SCEW_2_PDRP160 |
LCR AMS Hybrid West LA 2-W-LSCE |
Forced |
7.82 |
0.00 |
SCE Gen |
| SCEW_2_PDRP162 |
LCR AMS Hybrid West LA 2-W-LNEI1 |
Forced |
0.24 |
0.00 |
SCE Gen |
| SCEW_2_PDRP163 |
LCR AMS Hybrid West LA 2-W-LPIPO |
Forced |
2.64 |
0.00 |
SCE Gen |
| SCEW_2_PDRP164 |
LCR AMS Hybrid West LA 2-W-LLACC |
Forced |
0.45 |
0.00 |
SCE Gen |
| SCEW_2_PDRP167 |
LCR AMS Hybrid West LA 1-W-2-SCE |
Forced |
9.05 |
9.05 |
SCE Gen |
| SCEW_2_PDRP169 |
LCR AMS Hybrid West LA 1-C-LUCOP |
Forced |
1.80 |
0.00 |
SCE Gen |
| SCEW_2_PDRP22 |
LCR AMS Hybrid West LA 1-W-LPIPO |
Forced |
0.70 |
0.00 |
SCE Gen |
| SCHLTE_1_PL1X3 |
Tracy Combined Cycle Power Plant |
Forced |
336.04 |
9.58 |
PGAE Gen |
| SCHNDR_1_WSTSDE |
Westside Solar Station |
Forced |
15.00 |
5.00 |
PGAE Gen |
| SENTNL_2_CTG2 |
Sentinel Unit 2 |
Forced |
95.34 |
3.34 |
SCE Gen |
| SENTNL_2_CTG4 |
Sentinel Unit 4 |
Planned |
102.47 |
0.00 |
SCE Gen |
| SENTNL_2_CTG5 |
Sentinel Unit 5 |
Forced |
103.81 |
11.81 |
SCE Gen |
| SENTNL_2_CTG6 |
Sentinel Unit 6 |
Planned/Forced |
100.99 |
100.99 |
SCE Gen |
| SENTNL_2_CTG7 |
Sentinel Unit 7 |
Forced |
97.06 |
5.06 |
SCE Gen |
| SENTNL_2_CTG8 |
Sentinel Unit 8 |
Forced |
101.80 |
9.80 |
SCE Gen |
| SIERRA_1_UNITS |
HIGH SIERRA LIMITED |
Forced |
52.43 |
0.93 |
PGAE Gen |
| SLSTR1_2_SOLAR1 |
Solar Star 1 |
Forced |
310.00 |
0.00 |
SCE Gen |
| SLUISP_2_UNITS |
SAN LUIS (GIANELLI) PUMP-GEN (AGGREGATE) |
Planned |
374.43 |
197.43 |
PGAE Gen |
| SLYCRK_1_UNIT 1 |
SLY CREEK HYDRO |
Forced |
13.00 |
5.42 |
PGAE North |
| SMUDGO_7_UNIT 1 |
SONOMA POWER PLANT |
Forced |
64.80 |
64.80 |
PGAE Gen |
| SNCLRA_2_UNIT1 |
New Indy Oxnard |
Planned |
27.80 |
16.80 |
SCE Gen |
| SPAULD_6_UNIT 3 |
SPAULDING HYDRO PH 3 UNIT |
Forced |
6.50 |
5.70 |
PGAE North |
| SPAULD_6_UNIT12 |
SPAULDING HYDRO PH 1 & 2 AGGREGATE |
Forced |
11.40 |
11.40 |
PGAE North |
| SPOINT_2_MEADDYN |
SPOINT_2_MEADDYN |
Forced |
325.00 |
325.00 |
SCE Gen |
| SPOINT_2_PARKERDYN |
Southpoint Energy Center |
Forced |
200.00 |
200.00 |
SCE Gen |
| SPRGAP_1_UNIT 1 |
SPRING GAP HYDRO |
Forced |
7.00 |
7.00 |
PGAE North |
| SPRGVL_2_TULE |
TULE RIVER HYDRO PLANT (PG&E) |
Forced |
6.40 |
6.40 |
SCE Gen |
| SPRGVL_2_TULESC |
TULE RIVER HYDRO PLANT (SCE) |
Forced |
2.50 |
2.50 |
SCE Gen |
| SPRV_3_COAL_SPV3 |
SPRV_3_COAL_SPV3 |
Forced |
317.00 |
317.00 |
PNM Gen |
| STANTN_2_STAGT2 |
Stanton 2 |
Planned |
49.65 |
0.00 |
SCE Gen |
| STIGCT_2_LODI |
LODI STIG UNIT |
Forced |
49.90 |
0.00 |
PGAE Gen |
| STOILS_1_UNITS |
Chevron Richmond Refinery |
Planned |
56.20 |
56.20 |
PGAE Gen |
| STROUD_6_SOLAR |
Stroud Solar Station |
Forced |
20.00 |
2.00 |
PGAE South |
| SUMWHT_6_SWSSR1 |
Summer Wheat Solar Farm |
Forced |
18.50 |
0.90 |
PGAE Gen |
| SUNRIS_2_PL1X3 |
Sunrise Power Project AGGREGATE II |
Forced |
586.02 |
20.02 |
PGAE Gen |
| SUNSET_2_UNITS |
MIDWAY SUNSET COGENERATION PLANT |
Planned/Forced |
248.00 |
165.00 |
PGAE South |
| SUNSHN_2_LNDFL |
Sunshine Gas Producers |
Forced |
20.00 |
0.00 |
SCE Gen |
| SWIFT_1_NAS |
YERBA BUENA BATTERY |
Forced |
4.80 |
4.80 |
PGAE South |
| S_RITA_6_SOLAR1 |
Sun Harvest Solar |
Forced |
1.50 |
0.00 |
PGAE Gen |
| TEHAPI_2_WIND1 |
Wind Wall Monolith 1 |
Forced |
19.85 |
0.00 |
SCE Gen |
| TEHAPI_2_WIND2 |
Wind Wall Monolith 2 |
Forced |
23.66 |
12.86 |
SCE Gen |
| TENGEN_2_PL1X2 |
Berry Cogen 42 |
Forced |
40.20 |
20.20 |
SCE Gen |
| TERMEX_2_PL1X3 |
TDM |
Forced |
625.00 |
0.00 |
SDGE Gen |
| TKOPWR_6_HYDRO |
Bear Creek Hydroelectric Project |
Planned |
2.83 |
0.00 |
PGAE Gen |
| TRNSWD_1_QF |
FPL Energy C Wind |
Forced |
38.97 |
23.97 |
SCE Gen |
| TWISSL_6_SOLAR |
Nickel 1 ("NLH1") |
Forced |
1.50 |
0.00 |
PGAE Gen |
| TWISSL_6_SOLAR1 |
Coronal Lost Hills |
Forced |
20.00 |
10.00 |
PGAE Gen |
| UNOCAL_1_UNITS |
TOSCO (RODEO PLANT) |
Forced |
49.85 |
0.00 |
PGAE South |
| USWND2_1_WIND1 |
Golden Hills A |
Forced |
42.96 |
3.58 |
PGAE Gen |
| USWNDR_2_SMUD |
SOLANO WIND FARM |
Forced |
102.18 |
0.00 |
PGAE Gen |
| USWNDR_2_SMUD2 |
Solano Wind Project Phase 3 |
Forced |
127.80 |
3.00 |
PGAE Gen |
| USWPJR_2_UNITS |
Vasco Wind |
Forced |
78.20 |
9.20 |
PGAE Gen |
| VACADX_1_NAS |
VACA-DIXON BATTERY |
Forced |
0.70 |
0.00 |
PGAE North |
| VALLEY_5_PERRIS |
MWD Perris Hydroelectric Recovery Plant |
Forced |
7.94 |
7.94 |
SCE Gen |
| VEGA_6_SOLAR1 |
Vega Solar |
Planned |
20.00 |
0.00 |
PGAE Gen |
| VERNON_6_GONZL1 |
H. Gonzales Unit #1 |
Forced |
5.75 |
5.75 |
SCE Gen |
| VERNON_6_MALBRG |
Malburg Generating Station |
Forced |
134.00 |
0.00 |
SCE Gen |
| VESTAL_2_KERN |
KERN RIVER PH 3 UNITS 1 & 2 AGGREGATE |
Forced |
36.80 |
36.80 |
SCE Gen |
| VESTAL_2_WELLHD |
Wellhead Power Delano |
Forced |
49.00 |
0.72 |
SCE Gen |
| VICTOR_1_CREST |
Victor Aggregate Solar Resources |
Forced |
24.50 |
4.00 |
SCE Gen |
| VICTOR_1_EXSLRA |
Expressway Solar A |
Forced |
2.00 |
0.00 |
SCE Gen |
| VICTOR_1_EXSLRB |
Expressway Solar B |
Forced |
2.00 |
1.00 |
SCE Gen |
| VICTOR_1_SOLAR2 |
Alamo Solar |
Forced |
20.00 |
0.00 |
SCE Gen |
| VICTOR_1_VDRYFA |
Victor Dry Farm Ranch A |
Forced |
5.00 |
0.00 |
SCE Gen |
| VICTOR_1_VDRYFB |
Victor Dry Farm Ranch B |
Forced |
5.00 |
0.00 |
SCE Gen |
| VILLPK_2_VALLYV |
MWD Valley View Hydroelectric Recovery P |
Forced |
4.10 |
4.10 |
SCE Gen |
| VOYAGR_2_VOAWD5 |
Voyager Wind Oasis Alta |
Forced |
14.14 |
14.14 |
SCE Gen |
| VSTAES_6_VESBT1 |
Vista Energy Storage |
Forced |
40.00 |
10.00 |
SDGE Gen |
| WADHAM_6_UNIT |
Wadham Energy LP |
Forced |
29.07 |
0.00 |
PGAE North |
| WALCRK_2_CTG1 |
Walnut Creek Energy Park Unit 1 |
Forced |
96.43 |
0.00 |
SCE Gen |
| WALCRK_2_CTG2 |
Walnut Creek Energy Park Unit 2 |
Forced |
96.91 |
0.00 |
SCE Gen |
| WALCRK_2_CTG3 |
Walnut Creek Energy Park Unit 3 |
Planned/Forced |
96.65 |
96.65 |
SCE Gen |
| WALCRK_2_CTG4 |
Walnut Creek Energy Park Unit 4 |
Forced |
96.49 |
0.00 |
SCE Gen |
| WALCRK_2_CTG5 |
Walnut Creek Energy Park Unit 5 |
Forced |
96.65 |
0.00 |
SCE Gen |
| WFRESN_1_SOLAR |
Joya Del Sol |
Forced |
1.50 |
0.00 |
PGAE Gen |
| WHITEH_2_MEADDYN2 |
White Hills B |
Forced |
300.00 |
24.00 |
SCE Gen |
| WHTWTR_1_WINDA1 |
Whitewater Hill Wind Project |
Forced |
61.50 |
11.50 |
SCE Gen |
| WISHON_6_UNITS |
Wishon/San Joaquin #1-A AGGREGATE |
Forced |
18.40 |
14.70 |
PGAE Gen |
| WLDWD_1_SOLAR1 |
Wildwood Solar I |
Planned/Forced |
20.00 |
0.00 |
PGAE Gen |
| WLDWD_1_SOLAR2 |
Wildwood Solar 2 |
Forced |
15.00 |
0.00 |
PGAE Gen |
| WNDMAS_2_UNIT 1 |
BUENA VISTA ENERGY, LLC |
Forced |
38.00 |
1.00 |
PGAE Gen |
| WNDSTR_2_WIND |
Windstar |
Forced |
120.00 |
0.00 |
SCE Gen |
| WSTWND_2_M90WD2 |
Mojave 90 |
Forced |
48.85 |
0.00 |
SCE Gen |
| YUBACT_1_SUNSWT |
YUBA CITY COGEN |
Planned |
49.97 |
49.97 |
PGAE North |
| YUBACT_6_UNITA1 |
Yuba City Energy Center (Calpine) |
Forced |
47.60 |
0.00 |
PGAE North |
| ZOND_6_UNIT |
ZOND WINDSYSTEMS INC. |
Forced |
17.10 |
17.10 |
PGAE Gen |
| APLHIL_1_SFKHY1 |
South Fork Powerhouse |
Forced |
2.68 |
2.68 |
|
| MALIN_5_HERMDYN |
MALIN_5_HERMDYN |
Forced |
308.00 |
308.00 |
|
| SNCLRA_2_VESBT1 |
Ventura Energy Storage |
Forced |
100.00 |
100.00 |
|
| SUTTER_2_CISO |
Sutter Power Plant Pseudo-CISO |
Planned/Forced |
275.00 |
275.00 |
|
| VISTRA_5_DALBT1 |
Dallas Energy Storage |
Planned |
100.00 |
100.00 |
|
| VISTRA_5_DALBT2 |
Dallas Energy Storage 2 |
Forced |
100.00 |
100.00 |
|
| VOLTA_7_PONHY1 |
VOLTA_7_PONHY1 |
Forced |
1.25 |
1.25 |
|