| Resource ID | Resource Name | Outage Type | Capacity (MW) | Curtailed (MW) | Zone Name | 
      
      
        | ADLIN_1_UNITS | GEYSERS AIDLIN AGGREGATE | Forced | 22.00 | 9.00 | PGAE Gen | 
      
        | AGRICO_6_PL3N5 | Fresno Peaker | Forced | 22.69 | 0.00 | PGAE South | 
      
        | ALAMIT_7_ES1 | Alamitos Energy Storage | Forced | 100.45 | 0.00 | SCE Gen | 
      
        | ALAMIT_7_UNIT 4 | ALAMITOS GEN STA. UNIT 4 | Forced | 334.43 | 244.43 | SCE Gen | 
      
        | ALMEGT_1_UNIT 1 | ALAMEDA GT UNIT 1 | Forced | 25.00 | 3.00 | PGAE South | 
      
        | ALMEGT_1_UNIT 2 | ALAMEDA GT UNIT 2 | Forced | 25.00 | 2.00 | PGAE South | 
      
        | ALPSLR_1_NTHSLR | Alpaugh North, LLC | Forced | 20.00 | 0.00 | PGAE Gen | 
      
        | ALT6DN_2_WIND7 | Pinyon Pines 1 | Forced | 164.31 | 0.00 | SCE Gen | 
      
        | ALTA3A_2_CPCE4 | Alta Wind 4 | Forced | 102.00 | 0.00 | SCE Gen | 
      
        | ALTA3A_2_CPCE5 | Alta Wind 5 | Forced | 168.00 | 9.00 | SCE Gen | 
      
        | ALTA4A_2_CPCW1 | Alta Wind 1 | Forced | 150.00 | 1.50 | SCE Gen | 
      
        | ALTA4B_2_CPCW2 | Alta Wind 2 | Forced | 150.00 | 3.00 | SCE Gen | 
      
        | ALTA4B_2_CPCW3 | Alta Wind 3 | Forced | 150.00 | 9.00 | SCE Gen | 
      
        | ALTA6B_2_WIND11 | Alta Wind 11 | Forced | 88.15 | 0.00 | SCE Gen | 
      
        | ALTA6E_2_WIND10 | Alta Wind 10 | Forced | 134.84 | 12.29 | SCE Gen | 
      
        | ALTWD_2_COAWD1 | Coachella 1 | Forced | 50.40 | 0.00 | SCE Gen | 
      
        | AVENAL_6_SUNCTY | Sun City Solar Project | Forced | 20.00 | 0.00 | PGAE Gen | 
      
        | BALCHS_7_UNIT 2 | BALCH 2 PH UNIT 2 | Planned | 52.50 | 0.00 | PGAE South | 
      
        | BARRE_6_PEAKER | Barre Peaker | Forced | 47.00 | 0.00 | SCE Gen | 
      
        | BASICE_2_UNITS | King City Cogen | Forced | 120.00 | 0.00 | PGAE Gen | 
      
        | BCTSYS_5_PWXDYN | BCTSYS_5_PWXDYN | Forced | 428.00 | 428.00 | PGAE Gen | 
      
        | BDGRCK_1_UNITS | BADGER CREEK LIMITED | Forced | 48.08 | 6.08 | PGAE South | 
      
        | BEARMT_1_UNIT | Bear Mountain Limited | Forced | 49.21 | 4.21 | PGAE Gen | 
      
        | BGSKYN_2_AS2SR1 | Antelope Solar 2 | Forced | 105.00 | 0.00 | SCE Gen | 
      
        | BGSKYN_2_ASPSR2 | Antelope Solar 2 San Pablo | Forced | 100.00 | 0.00 | SCE Gen | 
      
        | BGSKYN_2_BS3SR3 | Big Sky Solar 3 | Forced | 20.00 | 0.00 | SCE Gen | 
      
        | BIGCRK_2_EXESWD | BIG CREEK HYDRO PROJECT PSP | Planned/Forced | 820.00 | 598.00 | SCE Gen | 
      
        | BIGSKY_2_BSKSR6 | Big Sky Solar 6 | Forced | 20.00 | 0.00 | SCE Gen | 
      
        | BIGSKY_2_BSKSR7 | Big Sky Solar 7 | Forced | 20.00 | 0.00 | SCE Gen | 
      
        | BIGSKY_2_BSKSR8 | Big Sky Solar 8 | Forced | 20.00 | 0.00 | SCE Gen | 
      
        | BIGSKY_2_SOLAR1 | Antelope Big Sky Ranch | Forced | 20.00 | 3.00 | SCE Gen | 
      
        | BIGSKY_2_SOLAR2 | Big Sky Solar 4 | Forced | 40.00 | 0.00 | SCE Gen | 
      
        | BIGSKY_2_SOLAR3 | Big Sky Summer | Forced | 20.00 | 0.00 | SCE Gen | 
      
        | BIGSKY_2_SOLAR4 | Western Antelope Blue Sky Ranch B | Forced | 20.00 | 0.00 | SCE Gen | 
      
        | BIGSKY_2_SOLAR5 | Big Sky Solar 2 | Forced | 5.00 | 0.00 | SCE Gen | 
      
        | BIGSKY_2_SOLAR6 | Solverde 1 | Forced | 85.00 | 0.00 | SCE Gen | 
      
        | BIGSKY_2_SOLAR7 | Big Sky Solar 1 | Forced | 50.00 | 0.00 | SCE Gen | 
      
        | BIOMAS_1_UNIT 1 | WOODLAND BIOMASS | Forced | 25.50 | 25.50 | PGAE North | 
      
        | BISHOP_1_ALAMO | BISHOP CREEK PLANT 2  AND  6 | Planned | 13.40 | 9.80 | SCE Gen | 
      
        | BISHOP_1_UNITS | BISHOP CREEK PLANT 3  AND  4 | Planned/Forced | 15.80 | 11.00 | SCE Gen | 
      
        | BKRFLD_2_SOLAR1 | Bakersfield 111 | Forced | 1.38 | 0.00 | PGAE Gen | 
      
        | BLACK_7_UNIT 1 | JAMES B. BLACK 1 | Forced | 85.00 | 2.00 | PGAE North | 
      
        | BLCKBT_2_STONEY | BLACK BUTTE HYDRO | Forced | 6.20 | 6.20 | PGAE Gen | 
      
        | BNNIEN_7_ALTAPH | ALTA POWER HOUSE | Forced | 1.00 | 0.89 | PGAE Gen | 
      
        | BORDER_6_UNITA1 | CalPeak Power Border Unit 1 | Forced | 51.25 | 0.00 | SDGE Gen | 
      
        | BRDSLD_2_MTZUM2 | NextEra Energy Montezuma Wind II | Forced | 78.20 | 0.00 | PGAE Gen | 
      
        | BRDSLD_2_MTZUMA | FPL Energy Montezuma Wind | Forced | 36.80 | 0.00 | PGAE Gen | 
      
        | BRDSLD_2_SHILO1 | Shiloh I Wind Project | Forced | 150.00 | 1.50 | PGAE Gen | 
      
        | BRDSLD_2_SHILO2 | SHILOH WIND PROJECT 2 | Forced | 150.00 | 2.00 | PGAE Gen | 
      
        | BRDSLD_2_SHLO3A | Shiloh III Wind Project, LLC | Forced | 102.50 | 2.05 | PGAE Gen | 
      
        | BRDSLD_2_SHLO3B | Shiloh IV Wind Project | Forced | 100.00 | 0.00 | PGAE Gen | 
      
        | BRODIE_2_WIND | Coram Brodie Wind Project | Forced | 102.00 | 6.00 | SCE Gen | 
      
        | BUCKBL_2_PL1X3 | Blythe Energy Center | Forced | 493.63 | 0.00 | SCE Gen | 
      
        | BUCKCK_7_PL1X2 | BUCKS CREEK AGGREGATE | Planned | 57.25 | 57.25 | PGAE Gen | 
      
        | BUCKWD_7_WINTCV | Wintec Energy, Ltd. | Forced | 1.32 | 0.66 | SCE Gen | 
      
        | CALPIN_1_AGNEW | Agnews Power Plant | Forced | 28.56 | 0.56 | PGAE Gen | 
      
        | CAMCHE_1_PL1X3 | CAMANCHE UNITS  1, 2 &  3 AGGREGATE | Forced | 9.99 | 8.99 | PGAE Gen | 
      
        | CARBOU_7_PL2X3 | CARIBOU PH 1 UNIT 2 & 3 AGGREGATE | Forced | 49.00 | 49.00 | PGAE North | 
      
        | CARBOU_7_UNIT 1 | CARIBOU PH 1 UNIT 1 | Planned | 24.00 | 24.00 | PGAE North | 
      
        | CARLS1_2_CARCT1 | Carlsbad 1 | Planned | 422.00 | 0.00 | SDGE Gen | 
      
        | CARLS2_1_CARCT1 | Carlsbad 2 | Planned | 105.50 | 0.00 | SDGE Gen | 
      
        | CAYTNO_2_VASCO | Vasco Road | Forced | 4.30 | 0.00 | PGAE Gen | 
      
        | CENTER_2_RHONDO | MWD Rio Hondo Hydroelectric Recovery Pla | Forced | 1.91 | 1.91 | SCE Gen | 
      
        | CENTER_6_PEAKER | Center Peaker | Forced | 47.11 | 3.11 | SCE Gen | 
      
        | CENTRY_6_PL1X4 | CENTURY GENERATING PLANT (AGGREGATE) | Forced | 41.40 | 10.20 | SCE Gen | 
      
        | CHALK_1_UNIT | CHALK CLIFF LIMITED | Forced | 48.67 | 6.67 | PGAE Gen | 
      
        | CHICPK_7_UNIT 1 | Chicago Park Powerhouse | Forced | 42.00 | 42.00 | PGAE North | 
      
        | CHINO_7_MILIKN | MN Milliken Genco LLC | Forced | 1.90 | 1.90 | SCE Gen | 
      
        | CLOVDL_1_SOLAR | Cloverdale Solar I | Forced | 1.50 | 0.00 | PGAE Gen | 
      
        | CLOVER_2_UNIT | Clover Creek | Forced | 0.99 | 0.79 | PGAE Gen | 
      
        | COCOPP_2_CTG1 | Marsh Landing 1 | Forced | 204.20 | 0.47 | PGAE South | 
      
        | COCOPP_2_CTG2 | Marsh Landing 2 | Forced | 202.70 | 0.00 | PGAE South | 
      
        | COCOPP_2_CTG3 | Marsh Landing 3 | Forced | 208.96 | 6.53 | PGAE South | 
      
        | COCOPP_2_CTG4 | Marsh Landing 4 | Forced | 204.29 | 0.00 | PGAE South | 
      
        | COGNAT_1_UNIT | Stockton Biomas | Planned | 45.00 | 0.00 | PGAE Gen | 
      
        | COLGAT_7_UNIT 1 | Colgate Powerhouse Unit 1 | Planned | 176.72 | 29.72 | PGAE North | 
      
        | COLGAT_7_UNIT 2 | Colgate Powerhouse Unit 2 | Planned | 175.67 | 28.67 | PGAE North | 
      
        | COLUSA_2_PL1X3 | Colusa Generating Station | Planned | 641.00 | 641.00 | PGAE North | 
      
        | CONTRL_1_CASAD2 | Mammoth G2 | Forced | 10.50 | 1.50 | SCE Gen | 
      
        | CONTRL_1_LUNDY | LUNDY | Planned | 3.00 | 2.75 | SCE Gen | 
      
        | CONTRL_1_POOLE | POOLE HYDRO PLANT 1 | Planned | 10.90 | 10.65 | SCE Gen | 
      
        | CONTRL_1_RUSHCK | RUSH CREEK | Planned | 11.94 | 11.84 | SCE Gen | 
      
        | COVERD_2_HCKHY1 | HATCHET CREEK | Forced | 6.89 | 5.69 | PGAE Gen | 
      
        | COVERD_2_MCKHY1 | Montgomery Creek Hydro | Planned | 2.80 | 2.50 | PGAE Gen | 
      
        | COVERD_2_RCKHY1 | ROARING CREEK | Forced | 2.00 | 2.00 | PGAE Gen | 
      
        | CRESTA_7_PL1X2 | CRESTA PH UNIT 1 & 2 AGGREGATE | Forced | 70.40 | 55.98 | PGAE North | 
      
        | CRNEVL_6_CRNVA | Crane Valley | Forced | 0.90 | 0.90 | PGAE Gen | 
      
        | CROKET_7_UNIT | CROCKETT COGEN | Forced | 240.00 | 240.00 | PGAE North | 
      
        | CRSTWD_6_KUMYAY | Kumeyaay Wind Farm | Forced | 50.00 | 2.00 | SDGE Gen | 
      
        | CSCCOG_1_UNIT 1 | SANTA CLARA CO-GEN | Forced | 7.00 | 0.00 | PGAE South | 
      
        | CSCGNR_1_UNIT 1 | GIANERA PEAKER UNIT 1 | Forced | 24.75 | 24.75 | PGAE South | 
      
        | CSCGNR_1_UNIT 2 | GIANERA PEAKER UNIT 2 | Forced | 24.75 | 2.15 | PGAE South | 
      
        | CSTRVL_7_PL1X2 | Marina Land Fill Gas | Planned | 4.53 | 0.13 | PGAE South | 
      
        | DAIRLD_1_MD2BM1 | Madera Digester Genset 2 | Forced | 0.80 | 0.00 | PGAE Gen | 
      
        | DEERCR_6_UNIT 1 | DEER CREEK | Planned/Forced | 7.00 | 7.00 | PGAE North | 
      
        | DELAMO_2_SOLRC1 | Golden Springs Building C1 | Forced | 1.16 | 0.00 | SCE Gen | 
      
        | DELTA_2_PL1X4 | DELTA ENERGY CENTER AGGREGATE | Forced | 880.00 | 29.00 | PGAE Gen | 
      
        | DIABLO_7_UNIT 2 | Diablo Canyon Unit 2 | Planned | 1150.00 | 1150.00 | PGAE South | 
      
        | DONNLS_7_UNIT | Donnells Hydro | Forced | 72.00 | 3.50 | PGAE Gen | 
      
        | DOUBLC_1_UNITS | DOUBLE "C" LIMITED | Forced | 52.23 | 0.93 | PGAE South | 
      
        | DRACKR_2_DSUBT2 | Dracker Solar Unit 2 BESS | Planned | 115.00 | 0.00 | SCE Gen | 
      
        | DRACKR_2_DSUBT3 | Dracker Solar Unit 3 BESS | Planned | 115.00 | 115.00 | SCE Gen | 
      
        | DRACKR_2_SOLAR2 | Dracker Solar Unit 2 | Forced | 125.00 | 0.00 | SCE Gen | 
      
        | DREWS_6_PL1X4 | Drews Generating Plant | Forced | 41.40 | 20.70 | SCE Gen | 
      
        | DRUM_7_PL3X4 | Drum PH 1 Units 3 & 4 Aggregate | Forced | 28.90 | 28.90 | PGAE North | 
      
        | DRUM_7_UNIT 5 | DRUM PH 2 UNIT 5 | Forced | 50.00 | 35.00 | PGAE North | 
      
        | DSABLA_7_UNIT | De Sabla Hydro | Planned | 18.50 | 18.50 | PGAE North | 
      
        | DSRTHV_2_DH2BT1 | Desert Harvest BESS | Forced | 35.00 | 0.00 | SCE Gen | 
      
        | DUANE_1_PL1X3 | DONALD VON RAESFELD POWER PROJECT | Forced | 147.80 | 5.80 | PGAE South | 
      
        | DUTCH1_7_UNIT 1 | DUTCH FLAT 1 PH | Forced | 22.00 | 22.00 | PGAE North | 
      
        | DUTCH2_7_UNIT 1 | DUTCH FLAT 2 PH | Forced | 26.00 | 20.50 | PGAE North | 
      
        | DVLCYN_1_UNITS | DEVIL CANYON HYDRO UNITS 1-4 AGGREGATE | Planned/Forced | 235.00 | 15.00 | SCE Gen | 
      
        | EASTWD_7_UNIT | EASTWOOD PUMP-GEN | Planned/Forced | 200.00 | 200.00 | SCE Gen | 
      
        | ELCABO_5_ECWSCEDYN | El Cabo Wind | Forced | 298.00 | 29.00 | APS Gen | 
      
        | ELCABO_5_ECWSCEDYN | El Cabo Wind | Forced | 298.00 | 29.00 | SCE Gen | 
      
        | ELCAJN_6_EB1BT1 | Eastern BESS 1 | Planned | 7.50 | 0.00 | SDGE Gen | 
      
        | ELDORO_7_UNIT 1 | El Dorado Unit 1 | Forced | 11.00 | 3.00 | PGAE North | 
      
        | ELDORO_7_UNIT 2 | El Dorado Unit 2 | Forced | 11.00 | 3.00 | PGAE North | 
      
        | ELECTR_7_PL1X3 | ELECTRA PH UNIT 1 & 2 AGGREGATE | Planned | 93.00 | 31.00 | PGAE North | 
      
        | ELKCRK_6_STONYG | STONEY GORGE HYDRO AGGREGATE | Forced | 4.90 | 4.90 | PGAE Gen | 
      
        | ELKHIL_2_PL1X3 | ELK HILLS COMBINED CYCLE (AGGREGATE) | Planned | 551.70 | 43.70 | PGAE Gen | 
      
        | ELSEGN_2_UN1011 | El Segundo Energy Center 5/6 | Forced | 263.00 | 0.00 | SCE Gen | 
      
        | ELSEGN_2_UN2021 | El Segundo Energy Center 7/8 | Forced | 263.68 | 0.00 | SCE Gen | 
      
        | ETIWND_2_FONTNA | FONTANALYTLE CREEK POWERHOUSE P | Planned | 2.56 | 1.16 | SCE Gen | 
      
        | ETIWND_2_UNIT1 | ETIWND_2_UNIT1 | Planned | 33.60 | 31.60 | SCE Gen | 
      
        | ETIWND_6_GRPLND | Grapeland Peaker | Forced | 47.39 | 0.00 | SCE Gen | 
      
        | EXCHEC_7_UNIT 1 | EXCHEQUER HYDRO | Forced | 94.50 | 18.50 | PGAE South | 
      
        | FLOWD2_2_FPLWND | DIABLO WINDS | Forced | 18.00 | 1.80 | PGAE Gen | 
      
        | FRNTBW_6_SOLAR1 | Frontier Solar | Forced | 20.00 | 0.00 | PGAE Gen | 
      
        | FROGTN_1_UTICAM | Murphys Powerhouse | Forced | 3.60 | 2.00 | PGAE Gen | 
      
        | GARNET_1_UNITS | GARNET GREEN POWER PROJECT AGGREGATE | Forced | 16.50 | 12.09 | SCE Gen | 
      
        | GARNET_1_WINDS | Garnet Winds Aggregation | Forced | 22.50 | 0.00 | SCE Gen | 
      
        | GARNET_2_COAWD2 | Coachella 2 | Planned/Forced | 10.80 | 10.80 | SCE Gen | 
      
        | GARNET_2_HYDRO | Whitewater Hydro | Forced | 1.00 | 1.00 | SCE Gen | 
      
        | GARNET_2_WIND1 | Phoenix | Forced | 11.20 | 11.20 | SCE Gen | 
      
        | GARNET_2_WIND2 | Karen Avenue Wind Farm | Planned | 11.70 | 0.00 | SCE Gen | 
      
        | GARNET_2_WPMWD6 | WINTEC PALM | Forced | 5.93 | 5.93 | SCE Gen | 
      
        | GATES_2_SOLAR | Gates Solar Station | Forced | 20.00 | 10.00 | PGAE South | 
      
        | GATEWY_2_GESBT1 | Gateway Energy Stroage | Forced | 250.00 | 0.00 | SDGE Gen | 
      
        | GATWAY_2_PL1X3 | GATEWAY GENERATING STATION | Forced | 585.00 | 32.80 | PGAE South | 
      
        | GEYS11_7_UNIT11 | GEYSERS UNIT 11 (HEALDSBURG) | Forced | 86.80 | 7.80 | PGAE Gen | 
      
        | GEYS12_7_UNIT12 | GEYSERS UNIT 12 (HEALDSBURG) | Forced | 57.00 | 15.00 | PGAE Gen | 
      
        | GEYS13_7_UNIT13 | GEYSERS UNIT 13 (HEALDSBURG) | Forced | 73.00 | 23.00 | PGAE Gen | 
      
        | GEYS14_7_UNIT14 | GEYSERS UNIT 14 (HEALDSBURG) | Forced | 70.00 | 14.00 | PGAE Gen | 
      
        | GEYS16_7_UNIT16 | GEYSERS UNIT 16 (HEALDSBURG) | Forced | 63.00 | 21.00 | PGAE Gen | 
      
        | GEYS17_7_UNIT17 | GEYSERS UNIT 17 (HEALDSBURG) | Forced | 75.50 | 17.50 | PGAE Gen | 
      
        | GEYS18_7_UNIT18 | GEYSERS UNIT 18 (HEALDSBURG) | Forced | 72.00 | 28.00 | PGAE Gen | 
      
        | GEYS20_7_UNIT20 | GEYSERS UNIT 20 (HEALDSBURG) | Forced | 50.00 | 16.00 | PGAE Gen | 
      
        | GILROY_1_UNIT | GILROY COGEN AGGREGATE | Forced | 120.00 | 10.00 | PGAE South | 
      
        | GLNARM_2_UNIT 5 | Glenarm Turbine 5 | Forced | 65.81 | 12.49 | SCE Gen | 
      
        | GLNARM_7_UNIT 1 | GLEN ARM UNIT 1 | Planned | 22.07 | 0.00 | SCE Gen | 
      
        | GLNARM_7_UNIT 2 | GLEN ARM UNIT 2 | Forced | 22.30 | 22.30 | SCE Gen | 
      
        | GOLETA_6_EXGEN | EXXON COMPANY USA | Forced | 48.20 | 48.20 | SCE Gen | 
      
        | GONZLS_6_UNIT | Johnson Canyon Landfill | Forced | 1.42 | 1.42 | PGAE Gen | 
      
        | GRIZLY_1_UNIT 1 | GRIZZLY HYDRO | Forced | 20.00 | 20.00 | PGAE North | 
      
        | GRNVLY_7_SCLAND | SANTA CRUZ LANDFILL GENERATING PLANT | Forced | 3.04 | 0.00 | PGAE South | 
      
        | GUERNS_6_HD3BM3 | Hanford Digester Genset 3 | Forced | 1.00 | 0.00 | PGAE Gen | 
      
        | GUERNS_6_VH2BM1 | Hanford Digester Genset 2 | Forced | 1.00 | 0.00 | PGAE Gen | 
      
        | GWFPWR_1_UNITS | Hanford Peaker Plant | Forced | 98.46 | 0.86 | PGAE Gen | 
      
        | GYS5X6_7_UNITS | GEYSERS UNITS 5 & 6 AGGREGATE | Forced | 98.43 | 14.43 | PGAE Gen | 
      
        | GYS7X8_7_UNITS | GEYSERS UNITS 7 & 8 AGGREGATE | Forced | 95.80 | 14.80 | PGAE Gen | 
      
        | HALSEY_6_UNIT | HALSEY HYDRO | Forced | 13.50 | 9.14 | PGAE Gen | 
      
        | HATCR2_7_UNIT | Hat Creek  #2 | Planned | 8.50 | 8.50 | PGAE North | 
      
        | HATLOS_6_BWDHY1 | Bidwell Ditch | Forced | 2.00 | 0.50 | PGAE Gen | 
      
        | HATLOS_6_LSCRK | Lost Creek 1 & 2 Hydro Conversion | Planned | 1.70 | 0.71 | PGAE Gen | 
      
        | HATRDG_2_WIND | Hatchet Ridge Wind Farm | Forced | 102.00 | 0.00 | PGAE Gen | 
      
        | HELMPG_7_UNIT 3 | HELMS PUMP-GEN UNIT 3 | Planned | 404.00 | 404.00 | PGAE South | 
      
        | HENRTA_6_SOLAR1 | Lemoore 1 | Forced | 1.50 | 0.00 | PGAE Gen | 
      
        | HENRTA_6_UNITA1 | GWF HENRIETTA PEAKER PLANT UNIT 1 | Planned/Forced | 49.98 | 1.51 | PGAE South | 
      
        | HENRTA_6_UNITA2 | GWF HENRIETTA PEAKER PLANT UNIT 2 | Planned/Forced | 49.42 | 1.77 | PGAE South | 
      
        | HIDSRT_2_UNITS | HIGH DESERT POWER PROJECT AGGREGATE | Planned | 830.00 | 830.00 | SCE Gen | 
      
        | HINSON_6_LBECH1 | Long Beach Unit 1 | Forced | 63.00 | 7.00 | SCE Gen | 
      
        | HINSON_6_LBECH2 | Long Beach Unit 2 | Forced | 63.00 | 9.00 | SCE Gen | 
      
        | HINSON_6_LBECH3 | Long Beach Unit 3 | Forced | 63.00 | 12.00 | SCE Gen | 
      
        | HINSON_6_LBECH4 | Long Beach Unit 4 | Forced | 63.00 | 11.00 | SCE Gen | 
      
        | HMLTBR_6_UNITS | HAMILTON BRANCH PH (AGGREGATE) | Forced | 4.90 | 4.90 | PGAE Gen | 
      
        | HOLGAT_1_BORAX | U.S. Borax, Unit 1 | Planned | 48.20 | 0.00 | SCE Gen | 
      
        | HOOVER_2_MWDDYN | HOOVER | Planned/Forced | 249.00 | 92.00 | SCE Gen | 
      
        | HOOVER_2_VEADYN | HOOVER | Forced | 16.00 | 6.00 | SCE Gen | 
      
        | HUMBPP_6_UNITS | Humboldt Bay Generating Station 1 | Planned | 97.62 | 16.27 | PGAE North | 
      
        | HYTTHM_2_UNITS | HYATT-THERMALITO PUMP-GEN (AGGREGATE) | Planned | 933.10 | 693.10 | PGAE Gen | 
      
        | INDIGO_1_UNIT 1 | INDIGO PEAKER UNIT 1 | Planned | 44.00 | 44.00 | SCE Gen | 
      
        | INSKIP_2_UNIT | INSKIP HYDRO | Forced | 8.00 | 8.00 | PGAE North | 
      
        | INTKEP_2_UNITS | CCSF Hetch_Hetchy Hydro Aggregate | Planned/Forced | 405.00 | 140.00 | PGAE Gen | 
      
        | INTMNT_3_ANAHEIM | Intermountain Power Project | Planned | 236.00 | 236.00 | SCE Gen | 
      
        | INTMNT_3_RIVERSIDE | IPPDYN | Planned/Forced | 136.00 | 136.00 | SCE Gen | 
      
        | IVANPA_1_UNIT1 | Ivanpah 1 | Forced | 126.00 | 0.00 | SCE Gen | 
      
        | IVSLRP_2_SOLAR1 | Silver Ridge Mount Signal | Forced | 200.00 | 0.00 | SDGE Gen | 
      
        | IVWEST_2_SOLAR1 | Imperial Valley West ( Q # 608) | Forced | 150.00 | 0.00 | SDGE Gen | 
      
        | JAWBNE_2_NSRWND | North Sky River Wind Project | Forced | 160.00 | 11.20 | SCE Gen | 
      
        | JOANEC_2_STABT1 | Santa Ana Storage 1 | Planned | 20.00 | 20.00 | SCE Gen | 
      
        | KEKAWK_6_UNIT | STS HYDROPOWER LTD. (KEKAWAKA) | Forced | 5.50 | 5.50 | PGAE Gen | 
      
        | KELSO_2_UNITS | Mariposa Energy | Planned/Forced | 198.03 | 106.25 | PGAE Gen | 
      
        | KERKH2_7_UNIT 1 | KERKHOFF PH 2 UNIT #1 | Planned/Forced | 153.90 | 153.90 | PGAE North | 
      
        | KERKH2_7_UNIT 1 | KERKHOFF PH 2 UNIT #1 | Planned/Forced | 153.90 | 153.90 | PGAE South | 
      
        | KERNFT_1_UNITS | KERN FRONT LIMITED | Forced | 52.40 | 1.10 | PGAE South | 
      
        | KERRGN_1_UNIT 1 | KERN RIVER HYDRO UNITS 1-4 AGGREGATE | Planned | 25.60 | 4.10 | SCE Gen | 
      
        | KILARC_2_UNIT 1 | KILARC HYDRO | Forced | 1.50 | 1.50 | PGAE North | 
      
        | KINGCO_1_KINGBR | Kingsburg Cogen | Planned | 34.50 | 34.50 | PGAE South | 
      
        | LAMONT_1_SOLAR4 | Hayworth Solar Farm | Forced | 26.66 | 12.66 | PGAE South | 
      
        | LAMONT_1_SOLAR5 | Redcrest Solar Farm | Forced | 16.66 | 0.00 | PGAE Gen | 
      
        | LAPAC_6_UNIT | LOUISIANA PACIFIC SAMOA | Forced | 20.00 | 20.00 | PGAE Gen | 
      
        | LAPLMA_2_UNIT 1 | La Paloma Generating Plant Unit #1 | Planned/Forced | 267.00 | 267.00 | PGAE Gen | 
      
        | LAPLMA_2_UNIT 2 | La Paloma Generating Plant Unit #2 | Planned/Forced | 266.00 | 266.00 | PGAE Gen | 
      
        | LAPLMA_2_UNIT 3 | La Paloma Generating Plant Unit #3 | Planned/Forced | 266.00 | 266.00 | PGAE Gen | 
      
        | LAPLMA_2_UNIT 4 | LA PALOMA GENERATING PLANT, UNIT #4 | Planned/Forced | 267.00 | 267.00 | PGAE Gen | 
      
        | LEBECS_2_UNITS | Pastoria Energy Facility | Planned/Forced | 799.47 | 545.47 | SCE Gen | 
      
        | LECEF_1_UNITS | LOS ESTEROS ENERGY FACILITY AGGREGATE | Forced | 309.84 | 10.84 | PGAE South | 
      
        | LHILLS_6_SOLAR1 | Lost Hills Solar | Forced | 20.00 | 0.00 | PGAE Gen | 
      
        | LITLRK_6_SEPV01 | Gestamp Solar 1 | Forced | 2.00 | 0.00 | SCE Gen | 
      
        | LIVOAK_1_UNIT 1 | LIVE OAK LIMITED | Forced | 49.70 | 5.70 | PGAE South | 
      
        | LMBEPK_2_UNITA1 | Lambie Energy Center, Unit #1 | Planned/Forced | 47.50 | 0.00 | PGAE Gen | 
      
        | LMEC_1_PL1X3 | Los Medanos Energy Center AGGREGATE | Forced | 580.00 | 0.00 | PGAE Gen | 
      
        | LNCSTR_6_SOLAR2 | SEPV Sierra NGR | Forced | 2.75 | 0.00 | SCE Gen | 
      
        | LOCKFD_1_BEARCK | Bear Creek Solar | Forced | 1.50 | 0.00 | PGAE Gen | 
      
        | LODI25_2_UNIT 1 | LODI GAS TURBINE | Forced | 25.00 | 3.00 | PGAE Gen | 
      
        | LODIEC_2_PL1X2 | Lodi Energy Center | Planned | 302.58 | 302.58 | PGAE Gen | 
      
        | MAGNLA_6_ANAHEIM | Magnolia Power Plant Anaheim | Forced | 109.00 | 109.00 | SCE Gen | 
      
        | MAGNLA_6_CERRITOS | Magnolia Power Plant Cerritos | Forced | 12.00 | 12.00 | SCE Gen | 
      
        | MAGNLA_6_COLTON | Magnolia Power Project | Forced | 12.00 | 12.00 | SCE Gen | 
      
        | MALCHQ_7_UNIT 1 | MALACHA HYDRO L.P. | Forced | 32.50 | 0.00 | PGAE Gen | 
      
        | MALIN_5_GCPDDYN | Grant County Hydro Facilities | Forced | 125.00 | 0.00 | PGAE Gen | 
      
        | MARCPW_6_SOLAR1 | Maricopa West Solar PV | Forced | 20.00 | 6.00 | PGAE Gen | 
      
        | MCCALL_1_QF | Fish Water | Forced | 0.52 | 0.52 | PGAE Gen | 
      
        | MERCFL_6_UNIT | Merced Falls Powerhouse | Forced | 3.50 | 3.50 | PGAE South | 
      
        | METEC_2_PL1X3 | Metcalf Energy Center | Forced | 593.16 | 15.16 | PGAE Gen | 
      
        | MIRLOM_2_CORONA | MWD Corona Hydroelectric Recovery Plant | Forced | 2.85 | 2.85 | SCE Gen | 
      
        | MIRLOM_2_MLBBTA | Mira Loma BESS A | Planned | 10.00 | 0.00 | SCE Gen | 
      
        | MIRLOM_2_MLBBTB | Mira Loma BESS B | Planned | 10.00 | 0.00 | SCE Gen | 
      
        | MKTRCK_1_UNIT 1 | MCKITTRICK LIMITED | Forced | 47.49 | 5.49 | PGAE South | 
      
        | MNDALY_6_MCGRTH | McGrath Beach Peaker | Forced | 47.20 | 4.18 | SCE Gen | 
      
        | MOJAVE_1_SIPHON | MOJAVE SIPHON POWER PLANT | Planned | 14.36 | 0.00 | SCE Gen | 
      
        | MOJAVW_2_SOLAR | Mojave West | Forced | 20.00 | 0.00 | SCE Gen | 
      
        | MONLTH_6_BATTRY | Tehachapi Storage Project | Forced | 7.99 | 5.99 | SCE Gen | 
      
        | MONTPH_7_UNITS | MONTICELLO HYDRO AGGREGATE | Forced | 12.50 | 8.50 | PGAE Gen | 
      
        | MOORPK_2_ACOBT1 | Acorn I BESS | Forced | 2.00 | 1.00 | SCE Gen | 
      
        | MOORPK_2_CALABS | Calabasas Gas-to-Energy Facility | Forced | 6.96 | 4.46 | SCE Gen | 
      
        | MOSSLD_2_PSP1 | MOSS LANDING POWER BLOCK 1 | Planned/Forced | 510.00 | 260.00 | PGAE South | 
      
        | MOSSLD_2_PSP2 | MOSS LANDING POWER BLOCK 2 | Forced | 510.00 | 10.00 | PGAE South | 
      
        | MRCHNT_2_PL1X3 | Desert Star Energy Center | Forced | 494.58 | 24.58 | SDGE Gen | 
      
        | MSTANG_2_SOLAR | Mustang | Forced | 30.00 | 4.00 | PGAE Gen | 
      
        | MSTANG_2_SOLAR3 | Mustang 3 | Forced | 40.00 | 7.00 | PGAE Gen | 
      
        | MSTANG_2_SOLAR4 | Mustang 4 | Forced | 30.00 | 1.00 | PGAE Gen | 
      
        | MTWIND_1_UNIT 1 | Mountain View Power Project I | Planned/Forced | 44.40 | 3.60 | SCE Gen | 
      
        | MTWIND_1_UNIT 2 | Mountain View Power Project II | Planned/Forced | 22.20 | 1.80 | SCE Gen | 
      
        | NAROW1_2_UNIT | NARROWS PH 1 UNIT | Planned/Forced | 12.00 | 3.00 | PGAE North | 
      
        | NAROW2_2_UNIT | Narrows Powerhouse Unit 2 | Planned | 55.00 | 55.00 | PGAE North | 
      
        | NCPA_7_GP2UN3 | NCPA GEO PLANT 2 UNIT 3 | Forced | 42.42 | 42.42 | PGAE Gen | 
      
        | NEENCH_6_SOLAR | Alpine Solar | Forced | 66.00 | 0.00 | SCE Gen | 
      
        | NGILAA_5_SDGDYN | NGILAA_5_SDGDYN | Forced | 57.00 | 3.00 | APS Gen | 
      
        | NGILAA_5_SDGDYN | NGILAA_5_SDGDYN | Forced | 57.00 | 3.00 | SDGE Gen | 
      
        | NOVATO_6_LNDFL | Redwood Renewable Energy | Forced | 3.90 | 0.40 | PGAE Gen | 
      
        | NWCSTL_7_UNIT 1 | NEWCASTLE HYDRO | Forced | 12.00 | 8.80 | PGAE Gen | 
      
        | OAK C_7_UNIT 1 | OAKLAND STATION C GT UNIT 1 | Forced | 55.00 | 1.50 | PGAE South | 
      
        | OAK C_7_UNIT 3 | OAKLAND STATION C GT UNIT 3 | Forced | 55.00 | 28.00 | PGAE South | 
      
        | OCTILO_5_WIND | Ocotillo Wind Energy Facility | Forced | 265.00 | 0.00 | SDGE Gen | 
      
        | OILFLD_7_QFUNTS | Nacimiento Hydroelectric Plant | Planned | 3.80 | 3.61 | PGAE South | 
      
        | OLDRIV_6_CESDBM | Ces Dairy Biogas | Forced | 1.00 | 0.00 | PGAE Gen | 
      
        | OLDRIV_6_LKVBM1 | Lakeview Dairy Biogas | Forced | 1.00 | 0.00 | PGAE Gen | 
      
        | OLINDA_2_COYCRK | MWD Coyote Creek Hydroelectric Recovery | Forced | 3.13 | 3.13 | SCE Gen | 
      
        | OLINDA_2_LNDFL2 | Brea Power II | Forced | 28.10 | 4.10 | SCE Gen | 
      
        | OMAR_2_UNIT 4 | KERN RIVER COGENERATION CO. UNIT 4 | Forced | 81.44 | 7.44 | SCE Gen | 
      
        | ORLND_6_HIGHLI | High Line Canal Hydro | Forced | 0.50 | 0.50 | PGAE Gen | 
      
        | ORMOND_7_UNIT 1 | ORMOND BEACH GEN STA. UNIT 1 | Planned | 741.27 | 741.27 | SCE Gen | 
      
        | OROVIL_6_UNIT | Oroville Cogeneration, LP | Forced | 7.50 | 1.50 | PGAE Gen | 
      
        | OSO_6_NSPIN | OSO_6_NSPIN | Forced | 70.00 | 0.00 | SCE Gen | 
      
        | OTMESA_2_PL1X3 | OTAY MESA ENERGY CENTER | Forced | 603.68 | 20.68 | SDGE Gen | 
      
        | PACLUM_6_UNIT | Humboldt Redwood | Forced | 28.80 | 6.80 | PGAE North | 
      
        | PADUA_2_ONTARO | ONTARIO/SIERRA HYDRO PSP | Planned | 1.92 | 0.92 | SCE Gen | 
      
        | PALALT_7_COBUG | Cooperatively Owned Back Up Generator | Forced | 4.50 | 4.50 | PGAE Gen | 
      
        | PALOMR_2_PL1X3 | Palomar Energy Center | Planned | 575.00 | 575.00 | SDGE Gen | 
      
        | PARDEB_6_UNITS | Pardee Power House | Forced | 30.00 | 30.00 | PGAE Gen | 
      
        | PEARBL_2_NSPIN | PEARBL_2_NSPIN | Forced | 118.00 | 0.00 | SCE Gen | 
      
        | PEORIA_1_SOLAR | Sonora 1 | Forced | 1.50 | 0.00 | PGAE Gen | 
      
        | PINFLT_7_UNITS | PINE FLAT HYDRO AGGREGATE | Planned | 198.51 | 123.51 | PGAE Gen | 
      
        | PIOPIC_2_CTG1 | Pio Pico Unit 1 | Forced | 111.30 | 1.71 | SDGE Gen | 
      
        | PIOPIC_2_CTG2 | Pio Pico Unit 2 | Forced | 112.70 | 0.32 | SDGE Gen | 
      
        | PIOPIC_2_CTG3 | Pio Pico Unit 3 | Forced | 112.00 | 0.00 | SDGE Gen | 
      
        | PIT1_7_UNIT 1 | PIT PH 1 UNIT 1 | Planned/Forced | 32.00 | 32.00 | PGAE North | 
      
        | PIT4_7_PL1X2 | PIT PH 4 UNITS 1 & 2 AGGREGATE | Planned | 95.00 | 95.00 | PGAE North | 
      
        | PIT6_7_UNIT 1 | PIT PH 6 UNIT 1 | Forced | 39.00 | 0.00 | PGAE North | 
      
        | PIT6_7_UNIT 2 | PIT PH 6 UNIT 2 | Forced | 40.00 | 0.00 | PGAE North | 
      
        | PIT7_7_UNIT 1 | PIT PH 7 UNIT 1 | Forced | 55.70 | 4.04 | PGAE North | 
      
        | PIT7_7_UNIT 2 | PIT PH 7 UNIT 2 | Forced | 54.60 | 2.94 | PGAE North | 
      
        | PLACVL_1_CHILIB | Chili Bar Hydro | Forced | 8.40 | 8.40 | PGAE Gen | 
      
        | PLAINV_6_SOLAR3 | Sierra Solar Greenworks LLC | Forced | 20.00 | 1.00 | SCE Gen | 
      
        | PLMSSR_6_HISIER | High Sierra Cogeneration Aggregate | Forced | 6.00 | 6.00 | PGAE Gen | 
      
        | PNCHEG_2_PL1X4 | PANOCHE ENERGY CENTER (Aggregated) | Planned/Forced | 401.00 | 299.00 | PGAE Gen | 
      
        | PNCHPP_1_PL1X2 | Midway Peaking Aggregate | Forced | 119.91 | 0.00 | PGAE Gen | 
      
        | PNOCHE_1_PL1X2 | Panoche Peaker | Forced | 49.97 | 0.00 | PGAE South | 
      
        | PNOCHE_1_UNITA1 | CalPeak Power Panoche Unit 1 | Forced | 52.01 | 0.00 | PGAE Gen | 
      
        | POEPH_7_UNIT 1 | POE HYDRO UNIT 1 | Forced | 69.00 | 69.00 | PGAE North | 
      
        | POEPH_7_UNIT 2 | POE HYDRO UNIT 2 | Forced | 68.50 | 24.08 | PGAE North | 
      
        | PWEST_1_UNIT | PACIFIC WEST 1 WIND GENERATION | Forced | 2.10 | 2.10 | SCE Gen | 
      
        | RAMON_2_SCEDYN | RAMON_2_SCEDYN | Forced | 106.18 | 36.18 | SCE Gen | 
      
        | RCKCRK_7_UNIT 1 | ROCK CREEK HYDRO UNIT 1 | Forced | 57.00 | 34.35 | PGAE North | 
      
        | RCKCRK_7_UNIT 2 | ROCK CREEK HYDRO UNIT 2 | Forced | 56.90 | 56.90 | PGAE North | 
      
        | RECTOR_2_KAWEAH | KAWEAH PH 2 & 3 PSP AGGREGATE | Forced | 6.55 | 5.95 | SCE Gen | 
      
        | RECTOR_2_KAWH 1 | KAWEAH PH 1 UNIT 1 | Forced | 2.25 | 2.25 | SCE Gen | 
      
        | RECTOR_2_QF | Kaweah Unit 1 | Planned | 20.09 | 20.09 | SCE Gen | 
      
        | REDMAN_6_AVSSR1 | Antelope Valley Solar | Forced | 3.00 | 0.00 | SCE Gen | 
      
        | REDOND_7_UNIT 8 | REDONDO GEN STA. UNIT 8 | Planned | 480.00 | 480.00 | SCE Gen | 
      
        | RICHMN_7_BAYENV | BAY ENVIRONMENTAL (NOVE POWER) | Planned/Forced | 2.50 | 2.50 | PGAE Gen | 
      
        | RIOBRV_6_UNIT 1 | RIO BRAVO HYDRO | Forced | 14.00 | 14.00 | PGAE Gen | 
      
        | ROLLIN_6_UNIT | ROLLINS HYDRO | Forced | 13.50 | 10.79 | PGAE North | 
      
        | ROSMDW_2_WIND1 | Pacific Wind - Phase 1 | Planned | 140.00 | 4.00 | SCE Gen | 
      
        | RTEDDY_2_SOLAR1 | Rosamond West Solar 1 | Forced | 54.00 | 16.00 | SCE Gen | 
      
        | RTEDDY_2_SOLAR2 | Rosamond West Solar 2 | Forced | 54.00 | 12.00 | SCE Gen | 
      
        | RTREE_2_WIND2 | Rising Tree 2 | Forced | 19.80 | 0.00 | SCE Gen | 
      
        | RUSCTY_2_UNITS | Russell City Energy Center | Forced | 615.18 | 0.00 | PGAE South | 
      
        | RVSIDE_6_RERCU1 | Riverside Energy Res. Ctr Unit 1 | Forced | 48.35 | 23.35 | SCE Gen | 
      
        | RVSIDE_6_SOLAR1 | Tequesquite Landfill Solar Project | Forced | 7.50 | 0.50 | SCE Gen | 
      
        | SALTSP_7_UNITS | SALT SPRINGS HYDRO AGGREGATE | Forced | 46.00 | 12.00 | PGAE North | 
      
        | SANLOB_1_LNDFIL | Cold Canyon | Forced | 1.50 | 1.50 | PGAE Gen | 
      
        | SANTFG_7_UNITS | GEYSERS CALISTOGA AGGREGATE | Forced | 72.00 | 13.00 | PGAE Gen | 
      
        | SANTGO_2_LNDFL1 | Bowerman Power | Forced | 19.60 | 3.60 | SCE Gen | 
      
        | SANWD_1_QF | San Gorgonio Farms Wind Farm | Planned | 31.00 | 6.00 | SCE Gen | 
      
        | SBERDO_2_PSP3 | Mountainview Gen Sta. Unit 3 | Planned | 555.00 | 555.00 | SCE Gen | 
      
        | SBERDO_2_PSP4 | Mountainview Gen Sta. Unit 4 | Forced | 555.00 | 0.00 | SCE Gen | 
      
        | SBERDO_2_SNTANA | SANTA ANA PSP | Planned | 6.95 | 6.95 | SCE Gen | 
      
        | SBERDO_6_MILLCK | MILL CREEK PSP | Planned | 3.93 | 2.43 | SCE Gen | 
      
        | SCEHOV_2_HOOVER | SCEHOV_2_HOOVER | Forced | 287.01 | 106.01 | SCE Gen | 
      
        | SCHLTE_1_PL1X3 | Tracy Combined Cycle Power Plant | Forced | 336.04 | 9.05 | PGAE Gen | 
      
        | SCHNDR_1_WSTSDE | Westside Solar Station | Forced | 15.00 | 5.00 | PGAE Gen | 
      
        | SENTNL_2_CTG2 | Sentinel Unit 2 | Planned/Forced | 95.34 | 95.34 | SCE Gen | 
      
        | SENTNL_2_CTG3 | Sentinel Unit 3 | Planned | 96.85 | 96.85 | SCE Gen | 
      
        | SIERRA_1_UNITS | HIGH SIERRA LIMITED | Forced | 52.43 | 1.13 | PGAE Gen | 
      
        | SLSTR1_2_SOLAR1 | Solar Star 1 | Forced | 310.00 | 0.00 | SCE Gen | 
      
        | SLUISP_2_UNITS | SAN LUIS (GIANELLI) PUMP-GEN (AGGREGATE) | Planned/Forced | 374.43 | 173.43 | PGAE Gen | 
      
        | SLYCRK_1_UNIT 1 | SLY CREEK HYDRO | Forced | 13.00 | 4.25 | PGAE North | 
      
        | SMUDGO_7_UNIT 1 | SONOMA POWER PLANT | Forced | 64.80 | 9.80 | PGAE Gen | 
      
        | SNCLRA_2_UNIT | Channel Islands Power | Forced | 27.50 | 27.50 | SCE Gen | 
      
        | SNCLRA_2_UNIT1 | New Indy Oxnard | Planned | 27.80 | 16.80 | SCE Gen | 
      
        | SNCLRA_2_VESBT1 | Ventura Energy Storage | Forced | 100.00 | 100.00 | SCE Gen | 
      
        | SPAULD_6_UNIT 3 | SPAULDING HYDRO PH 3 UNIT | Forced | 6.50 | 5.44 | PGAE North | 
      
        | SPAULD_6_UNIT12 | SPAULDING HYDRO PH 1 & 2 AGGREGATE | Planned/Forced | 11.40 | 11.40 | PGAE North | 
      
        | SPRGVL_2_TULE | TULE RIVER HYDRO PLANT (PG&E) | Forced | 6.40 | 6.40 | SCE Gen | 
      
        | SPRGVL_2_TULESC | TULE RIVER HYDRO PLANT (SCE) | Forced | 2.50 | 2.50 | SCE Gen | 
      
        | STIGCT_2_LODI | LODI STIG UNIT | Planned | 49.90 | 49.90 | PGAE Gen | 
      
        | STOILS_1_UNITS | Chevron Richmond Refinery | Forced | 56.20 | 56.20 | PGAE Gen | 
      
        | STROUD_6_SOLAR | Stroud Solar Station | Forced | 20.00 | 2.00 | PGAE South | 
      
        | STROUD_6_WWHSR1 | Winter Wheat Solar Farm | Forced | 1.50 | 0.00 | PG&E South | 
      
        | SUNRIS_2_PL1X3 | Sunrise Power Project AGGREGATE II | Planned | 586.02 | 586.02 | PGAE Gen | 
      
        | SUNSET_2_UNITS | MIDWAY SUNSET COGENERATION PLANT | Forced | 248.00 | 165.00 | PGAE South | 
      
        | SWIFT_1_NAS | YERBA BUENA BATTERY | Forced | 4.80 | 4.80 | PGAE South | 
      
        | SYCAMR_2_UNIT 1 | Sycamore Cogeneration Unit 1 | Forced | 86.00 | 86.00 | SCE Gen | 
      
        | S_RITA_6_SOLAR1 | Sun Harvest Solar | Forced | 1.50 | 0.00 | PGAE Gen | 
      
        | TEHAPI_2_PW1WD1 | Point Wind 1 | Planned/Forced | 47.49 | 44.11 | SCE Gen | 
      
        | TEHAPI_2_PW2WD2 | Point Wind 2 | Planned/Forced | 14.40 | 14.15 | SCE Gen | 
      
        | TEHAPI_2_WIND1 | Wind Wall Monolith 1 | Forced | 19.85 | 6.35 | SCE Gen | 
      
        | TEHAPI_2_WIND2 | Wind Wall Monolith 2 | Forced | 23.66 | 3.39 | SCE Gen | 
      
        | TENGEN_2_PL1X2 | Berry Cogen 42 | Planned/Forced | 40.20 | 20.20 | SCE Gen | 
      
        | TERMEX_2_PL1X3 | TDM | Forced | 625.00 | 0.00 | SDGE Gen | 
      
        | TIGRCK_7_UNITS | TIGER CREEK HYDRO AGGREGATE | Planned | 62.00 | 0.00 | PGAE North | 
      
        | TOADTW_6_UNIT | TOAD TOWN | Planned | 1.50 | 1.50 | PGAE North | 
      
        | TRNSWD_1_QF | FPL Energy C Wind | Forced | 38.97 | 21.77 | SCE Gen | 
      
        | TWISSL_6_SOLAR | Nickel 1 ("NLH1") | Forced | 1.50 | 0.00 | PGAE Gen | 
      
        | TX-ELK_6_SOLAR1 | Castor | Forced | 1.50 | 0.00 | PGAE Gen | 
      
        | UNOCAL_1_UNITS | TOSCO (RODEO PLANT) | Forced | 49.85 | 0.00 | PGAE South | 
      
        | USWND2_1_WIND2 | Golden Hills B | Forced | 42.96 | 0.00 | PGAE Gen | 
      
        | USWND2_1_WIND3 | Golden Hills C | Forced | 46.00 | 11.50 | PGAE Gen | 
      
        | USWNDR_2_LABWD1 | LaBrisa Wind Project | Forced | 9.00 | 0.00 | PGAE Gen | 
      
        | USWNDR_2_SMUD | SOLANO WIND FARM | Forced | 102.18 | 0.00 | PGAE Gen | 
      
        | USWNDR_2_SMUD2 | Solano Wind Project Phase 3 | Forced | 127.80 | 0.00 | PGAE Gen | 
      
        | USWPJR_2_UNITS | Vasco Wind | Forced | 78.20 | 2.30 | PGAE Gen | 
      
        | VACADX_1_NAS | VACA-DIXON BATTERY | Forced | 0.70 | 0.00 | PGAE North | 
      
        | VACADX_1_UNITA1 | CalPeak Power Vaca Dixon Unit 1 | Planned | 50.61 | 0.00 | PGAE Gen | 
      
        | VALLEY_5_PERRIS | MWD Perris Hydroelectric Recovery Plant | Forced | 7.94 | 7.94 | SCE Gen | 
      
        | VEDDER_1_SEKERN | TEXACO EXPLORATION & PROD (SE KERN RIVER | Forced | 34.47 | 12.47 | PGAE Gen | 
      
        | VENWD_1_WIND3 | Painted Hills | Forced | 44.53 | 0.00 | SCE Gen | 
      
        | VERNON_6_GONZL1 | H. Gonzales Unit #1 | Forced | 5.75 | 5.75 | SCE Gen | 
      
        | VERNON_6_MALBRG | Malburg Generating Station | Forced | 134.00 | 67.00 | SCE Gen | 
      
        | VESTAL_2_KERN | KERN RIVER PH 3 UNITS 1 & 2 AGGREGATE | Forced | 36.80 | 25.80 | SCE Gen | 
      
        | VESTAL_6_QF | Isabella Hydro Dam 1 | Forced | 11.95 | 10.95 | SCE Gen | 
      
        | VICTOR_1_CREST | Victor Aggregate Solar Resources | Forced | 24.50 | 0.00 | SCE Gen | 
      
        | VICTOR_1_EXSLRB | Expressway Solar B | Forced | 2.00 | 1.00 | SCE Gen | 
      
        | VILLPK_2_VALLYV | MWD Valley View Hydroelectric Recovery P | Forced | 4.10 | 4.10 | SCE Gen | 
      
        | VOYAGR_2_VOAWD5 | Voyager Wind Oasis Alta | Planned/Forced | 13.98 | 13.73 | SCE Gen | 
      
        | VSTAES_6_VESBT1 | Vista Energy Storage | Forced | 40.00 | 5.00 | SDGE Gen | 
      
        | WALCRK_2_CTG1 | Walnut Creek Energy Park Unit 1 | Forced | 96.43 | 0.00 | SCE Gen | 
      
        | WALCRK_2_CTG2 | Walnut Creek Energy Park Unit 2 | Forced | 96.91 | 0.00 | SCE Gen | 
      
        | WALCRK_2_CTG3 | Walnut Creek Energy Park Unit 3 | Forced | 96.65 | 0.00 | SCE Gen | 
      
        | WALCRK_2_CTG4 | Walnut Creek Energy Park Unit 4 | Forced | 96.49 | 0.00 | SCE Gen | 
      
        | WALCRK_2_CTG5 | Walnut Creek Energy Park Unit 5 | Forced | 96.65 | 0.00 | SCE Gen | 
      
        | WFRESN_1_SOLAR | Joya Del Sol | Forced | 1.50 | 0.00 | PGAE Gen | 
      
        | WHTWTR_1_WINDA1 | Whitewater Hill Wind Project | Forced | 61.50 | 11.50 | SCE Gen | 
      
        | WISE_1_UNIT 1 | Wise Hydro Unit 1 | Forced | 14.50 | 7.66 | PGAE Gen | 
      
        | WISHON_6_UNITS | Wishon/San Joaquin  #1-A AGGREGATE | Forced | 18.40 | 13.20 | PGAE Gen | 
      
        | WNDMAS_2_UNIT 1 | BUENA VISTA ENERGY, LLC | Forced | 38.00 | 0.00 | PGAE Gen | 
      
        | WSTWND_2_M90WD2 | Mojave 90 | Planned/Forced | 48.85 | 30.49 | SCE Gen | 
      
        | YUBACT_6_UNITA1 | Yuba City Energy Center (Calpine) | Forced | 47.60 | 0.00 | PGAE North | 
      
        | ZOND_6_UNIT | ZOND WINDSYSTEMS INC. | Forced | 17.10 | 17.10 | PGAE Gen | 
      
        | APLHIL_1_SFKHY1 | South Fork Powerhouse | Forced | 2.68 | 2.68 |  | 
      
        | CABALO_2_M2BSR1 | Mustang 2 Barbaro Solar | Planned | 50.00 | 0.00 |  | 
      
        | HARDWK_6_STWBM1 | Still Water Ranch Dairy | Forced | 1.00 | 1.00 |  | 
      
        | MALIN_5_HERMDYN | MALIN_5_HERMDYN | Forced | 308.00 | 308.00 |  | 
      
        | SHANDN_2_SBBBM1 | San Bernardino Biogas | Forced | 2.60 | 0.00 |  | 
      
        | SUTTER_2_CISO | Sutter Power Plant Pseudo-CISO | Planned/Forced | 275.00 | 275.00 |  | 
      
        | VISTRA_5_DALBT1 | Dallas Energy Storage | Forced | 100.00 | 100.00 |  | 
      
        | VISTRA_5_DALBT2 | Dallas Energy Storage 2 | Forced | 100.00 | 100.00 |  | 
      
        | VISTRA_5_DALBT3 | Dallas Energy Storage 3 | Forced | 100.00 | 100.00 |  | 
      
        | VOLTA_7_PONHY1 | VOLTA_7_PONHY1 | Planned | 1.25 | 1.25 |  |