| Resource ID | Resource Name | Outage Type | Capacity (MW) | Curtailed (MW) | Zone Name | 
      
      
        | ADLIN_1_UNITS | GEYSERS AIDLIN AGGREGATE | Forced | 22.00 | 12.00 | PGAE Gen | 
      
        | AGRICO_6_PL3N5 | Fresno Peaker | Forced | 22.69 | 0.00 | PGAE South | 
      
        | AGRICO_7_UNIT | Fresno Cogen | Planned/Forced | 50.60 | 50.60 | PGAE South | 
      
        | ALMEGT_1_UNIT 1 | ALAMEDA GT UNIT 1 | Forced | 25.00 | 3.00 | PGAE South | 
      
        | ALMEGT_1_UNIT 2 | ALAMEDA GT UNIT 2 | Forced | 25.00 | 3.00 | PGAE South | 
      
        | ALTA3A_2_CPCE4 | Alta Wind 4 | Forced | 102.00 | 0.00 | SCE Gen | 
      
        | ALTA3A_2_CPCE5 | Alta Wind 5 | Forced | 168.00 | 6.00 | SCE Gen | 
      
        | ALTA4A_2_CPCW1 | Alta Wind 1 | Forced | 150.00 | 1.50 | SCE Gen | 
      
        | ALTA4B_2_CPCW2 | Alta Wind 2 | Forced | 150.00 | 3.00 | SCE Gen | 
      
        | ALTA4B_2_CPCW3 | Alta Wind 3 | Forced | 150.00 | 6.00 | SCE Gen | 
      
        | ALTA6B_2_WIND11 | Alta Wind 11 | Forced | 88.15 | 1.70 | SCE Gen | 
      
        | ALTA6E_2_WIND10 | Alta Wind 10 | Forced | 134.84 | 52.59 | SCE Gen | 
      
        | ANAHM_2_CANYN2 | CANYON POWER PLANT UNIT 2 | Planned | 49.40 | 49.40 | SCE Gen | 
      
        | AVENAL_6_AVPARK | Avenal Park Solar Project | Forced | 6.00 | 0.00 | PGAE South | 
      
        | AVENAL_6_SANDDG | Sand Drag Solar Project | Forced | 19.00 | 0.00 | PGAE Gen | 
      
        | AVENAL_6_SUNCTY | Sun City Solar Project | Forced | 20.00 | 0.00 | PGAE Gen | 
      
        | BALCHS_7_UNIT 1 | BALCH 1 PH UNIT 1 | Planned | 31.00 | 31.00 | PGAE South | 
      
        | BALCHS_7_UNIT 2 | BALCH 2 PH UNIT 2 | Planned | 52.50 | 52.50 | PGAE South | 
      
        | BALCHS_7_UNIT 3 | BALCH 2 PH UNIT 3 | Planned | 54.60 | 54.60 | PGAE South | 
      
        | BARRE_6_PEAKER | Barre Peaker | Forced | 47.00 | 0.00 | SCE Gen | 
      
        | BASICE_2_UNITS | King City Cogen | Forced | 120.00 | 0.00 | PGAE Gen | 
      
        | BCTSYS_5_PWXDYN | BCTSYS_5_PWXDYN | Forced | 428.00 | 428.00 | PGAE Gen | 
      
        | BDGRCK_1_UNITS | BADGER CREEK LIMITED | Forced | 48.08 | 4.08 | PGAE South | 
      
        | BEARDS_7_UNIT 1 | Beardsley Hydro | Planned | 11.50 | 11.50 | PGAE Gen | 
      
        | BEARMT_1_UNIT | Bear Mountain Limited | Forced | 49.21 | 4.21 | PGAE Gen | 
      
        | BELDEN_7_UNIT 1 | BELDEN HYDRO | Forced | 119.00 | 117.00 | PGAE Gen | 
      
        | BGSKYN_2_AS2SR1 | Antelope Solar 2 | Forced | 105.00 | 0.00 | SCE Gen | 
      
        | BGSKYN_2_ASPSR2 | Antelope Solar 2 San Pablo | Forced | 100.00 | 0.00 | SCE Gen | 
      
        | BGSKYN_2_BS3SR3 | Big Sky Solar 3 | Forced | 20.00 | 0.00 | SCE Gen | 
      
        | BIGCRK_2_EXESWD | BIG CREEK HYDRO PROJECT PSP | Planned/Forced | 820.00 | 319.00 | SCE Gen | 
      
        | BIGSKY_2_BSKSR6 | Big Sky Solar 6 | Forced | 20.00 | 0.00 | SCE Gen | 
      
        | BIGSKY_2_BSKSR7 | Big Sky Solar 7 | Forced | 20.00 | 0.00 | SCE Gen | 
      
        | BIGSKY_2_BSKSR8 | Big Sky Solar 8 | Forced | 20.00 | 0.00 | SCE Gen | 
      
        | BIGSKY_2_SOLAR1 | Antelope Big Sky Ranch | Forced | 20.00 | 1.50 | SCE Gen | 
      
        | BIGSKY_2_SOLAR2 | Big Sky Solar 4 | Forced | 40.00 | 0.00 | SCE Gen | 
      
        | BIGSKY_2_SOLAR3 | Big Sky Summer | Forced | 20.00 | 0.00 | SCE Gen | 
      
        | BIGSKY_2_SOLAR4 | Western Antelope Blue Sky Ranch B | Forced | 20.00 | 0.00 | SCE Gen | 
      
        | BIGSKY_2_SOLAR5 | Big Sky Solar 2 | Forced | 5.00 | 0.00 | SCE Gen | 
      
        | BIGSKY_2_SOLAR6 | Solverde 1 | Forced | 85.00 | 0.00 | SCE Gen | 
      
        | BIGSKY_2_SOLAR7 | Big Sky Solar 1 | Forced | 50.00 | 0.00 | SCE Gen | 
      
        | BIOMAS_1_UNIT 1 | WOODLAND BIOMASS | Forced | 25.50 | 25.50 | PGAE North | 
      
        | BISHOP_1_ALAMO | BISHOP CREEK PLANT 2  AND  6 | Planned | 13.40 | 6.60 | SCE Gen | 
      
        | BISHOP_1_UNITS | BISHOP CREEK PLANT 3  AND  4 | Planned | 15.80 | 7.80 | SCE Gen | 
      
        | BKRFLD_2_SOLAR1 | Bakersfield 111 | Forced | 1.38 | 0.00 | PGAE Gen | 
      
        | BLACK_7_UNIT 1 | JAMES B. BLACK 1 | Forced | 85.00 | 2.00 | PGAE North | 
      
        | BLCKBT_2_STONEY | BLACK BUTTE HYDRO | Forced | 6.20 | 6.20 | PGAE Gen | 
      
        | BLKCRK_2_GMCBT1 | Genesis McCoy Bess | Planned | 230.00 | 230.00 | SCE Gen | 
      
        | BRDSLD_2_MTZUM2 | NextEra Energy Montezuma Wind II | Forced | 78.20 | 0.00 | PGAE Gen | 
      
        | BRDSLD_2_MTZUMA | FPL Energy Montezuma Wind | Forced | 36.80 | 0.00 | PGAE Gen | 
      
        | BRDSLD_2_SHILO1 | Shiloh I Wind Project | Forced | 150.00 | 3.00 | PGAE Gen | 
      
        | BRDSLD_2_SHILO2 | SHILOH WIND PROJECT 2 | Forced | 150.00 | 10.00 | PGAE Gen | 
      
        | BRDSLD_2_SHLO3A | Shiloh III Wind Project, LLC | Forced | 102.50 | 2.05 | PGAE Gen | 
      
        | BRDSLD_2_SHLO3B | Shiloh IV Wind Project | Forced | 100.00 | 0.00 | PGAE Gen | 
      
        | BRODIE_2_WIND | Coram Brodie Wind Project | Forced | 102.00 | 3.00 | SCE Gen | 
      
        | BUCKCK_2_HYDRO | Lassen Station Hydro | Forced | 0.99 | 0.99 | PGAE Gen | 
      
        | BUCKCK_7_OAKFLT | Oak Flat | Planned/Forced | 1.30 | 1.30 | PGAE Gen | 
      
        | BUCKCK_7_PL1X2 | BUCKS CREEK AGGREGATE | Planned/Forced | 57.25 | 57.25 | PGAE Gen | 
      
        | CAMCHE_1_PL1X3 | CAMANCHE UNITS  1, 2 &  3 AGGREGATE | Forced | 9.99 | 8.29 | PGAE Gen | 
      
        | CARBOU_7_PL4X5 | CARIBOU PH 2 UNIT 4 & 5 AGGREGATE | Planned | 120.00 | 120.00 | PGAE North | 
      
        | CARBOU_7_UNIT 1 | CARIBOU PH 1 UNIT 1 | Planned | 24.00 | 24.00 | PGAE North | 
      
        | CARLS1_2_CARCT1 | Carlsbad 1 | Planned/Forced | 422.00 | 211.00 | SDGE Gen | 
      
        | CARLS2_1_CARCT1 | Carlsbad 2 | Forced | 105.50 | 105.50 | SDGE Gen | 
      
        | CASTVL_2_FCELL | PGE CSUEB Hayward Fuel Cell | Forced | 1.40 | 1.40 | PGAE Gen | 
      
        | CENTER_2_RHONDO | MWD Rio Hondo Hydroelectric Recovery Pla | Forced | 1.91 | 1.91 | SCE Gen | 
      
        | CENTER_6_PEAKER | Center Peaker | Forced | 47.11 | 0.00 | SCE Gen | 
      
        | CENTRY_6_PL1X4 | CENTURY GENERATING PLANT (AGGREGATE) | Forced | 41.40 | 10.20 | SCE Gen | 
      
        | CHALK_1_UNIT | CHALK CLIFF LIMITED | Forced | 48.67 | 4.67 | PGAE Gen | 
      
        | CHICPK_7_UNIT 1 | Chicago Park Powerhouse | Forced | 42.00 | 14.70 | PGAE North | 
      
        | CHINO_7_MILIKN | MN Milliken Genco LLC | Forced | 1.90 | 1.90 | SCE Gen | 
      
        | CLOVDL_1_SOLAR | Cloverdale Solar I | Forced | 1.50 | 0.00 | PGAE Gen | 
      
        | CLOVER_2_UNIT | Clover Creek | Forced | 0.99 | 0.99 | PGAE Gen | 
      
        | COCOPP_2_CTG1 | Marsh Landing 1 | Forced | 204.20 | 1.75 | PGAE South | 
      
        | COCOPP_2_CTG2 | Marsh Landing 2 | Forced | 202.70 | 1.11 | PGAE South | 
      
        | COCOPP_2_CTG3 | Marsh Landing 3 | Forced | 208.96 | 7.80 | PGAE South | 
      
        | COCOPP_2_CTG4 | Marsh Landing 4 | Forced | 204.29 | 1.24 | PGAE South | 
      
        | COLGAT_7_UNIT 1 | Colgate Powerhouse Unit 1 | Planned | 176.72 | 27.72 | PGAE North | 
      
        | COLGAT_7_UNIT 2 | Colgate Powerhouse Unit 2 | Planned | 175.67 | 26.67 | PGAE North | 
      
        | COLUSA_2_PL1X3 | Colusa Generating Station | Planned/Forced | 641.00 | 300.50 | PGAE North | 
      
        | CONTRL_1_CASAD2 | Mammoth G2 | Forced | 10.50 | 0.90 | SCE Gen | 
      
        | CONTRL_1_LUNDY | LUNDY | Forced | 3.00 | 2.79 | SCE Gen | 
      
        | CONTRL_1_POOLE | POOLE HYDRO PLANT 1 | Forced | 10.90 | 1.78 | SCE Gen | 
      
        | CONTRL_1_RUSHCK | RUSH CREEK | Forced | 11.94 | 1.19 | SCE Gen | 
      
        | COPMT4_2_SOLAR4 | Copper Mountain Solar 4 | Forced | 92.00 | 2.00 | SCE Gen | 
      
        | COVERD_2_HCKHY1 | HATCHET CREEK | Forced | 6.89 | 6.89 | PGAE Gen | 
      
        | COVERD_2_MCKHY1 | Montgomery Creek Hydro | Forced | 2.80 | 2.69 | PGAE Gen | 
      
        | COVERD_2_RCKHY1 | ROARING CREEK | Forced | 2.00 | 2.00 | PGAE Gen | 
      
        | CRESTA_7_PL1X2 | CRESTA PH UNIT 1 & 2 AGGREGATE | Planned | 70.40 | 70.40 | PGAE North | 
      
        | CRNEVL_6_CRNVA | Crane Valley | Planned/Forced | 0.90 | 0.90 | PGAE Gen | 
      
        | CRNEVL_6_SJQN 2 | SAN JOAQUIN 2 | Planned | 3.20 | 3.20 | PGAE Gen | 
      
        | CRNEVL_6_SJQN 3 | SAN JOAQUIN 3 | Planned | 4.20 | 4.20 | PGAE Gen | 
      
        | CSCCOG_1_UNIT 1 | SANTA CLARA CO-GEN | Forced | 7.00 | 0.00 | PGAE South | 
      
        | CSCGNR_1_UNIT 1 | GIANERA PEAKER UNIT 1 | Planned | 24.75 | 24.75 | PGAE South | 
      
        | CSCGNR_1_UNIT 2 | GIANERA PEAKER UNIT 2 | Forced | 24.75 | 2.15 | PGAE South | 
      
        | CSTRVL_7_PL1X2 | Marina Land Fill Gas | Forced | 4.53 | 0.13 | PGAE South | 
      
        | CUYAMS_6_CUYSR1 | Cuyama Solar | Forced | 40.00 | 0.00 | PGAE Gen | 
      
        | DAIRLD_1_MD2BM1 | Madera Digester Genset 2 | Forced | 0.80 | 0.00 | PGAE Gen | 
      
        | DELAMO_2_SOLAR3 | Golden Springs Building G | Forced | 1.25 | 0.00 | SCE Gen | 
      
        | DELAMO_2_SOLAR4 | Golden Springs Building F | Forced | 1.30 | 0.00 | SCE Gen | 
      
        | DELAMO_2_SOLAR5 | Golden Springs Building L | Forced | 1.00 | 0.00 | SCE Gen | 
      
        | DELSUR_6_CREST | Delsur Aggregate Solar Resources | Forced | 10.00 | 0.00 | SCE Gen | 
      
        | DELTA_2_PL1X4 | DELTA ENERGY CENTER AGGREGATE | Forced | 880.00 | 321.00 | PGAE Gen | 
      
        | DEVERS_1_SEPV05 | SEPV 5 | Forced | 2.00 | 0.00 | SCE Gen | 
      
        | DEVERS_1_SOLAR2 | SEPV9 | Forced | 9.00 | 0.00 | SCE Gen | 
      
        | DONNLS_7_UNIT | Donnells Hydro | Planned/Forced | 72.00 | 72.00 | PGAE Gen | 
      
        | DOUBLC_1_UNITS | DOUBLE "C" LIMITED | Forced | 52.23 | 2.13 | PGAE South | 
      
        | DRACKR_2_DS3SR3 | Dracker Solar Unit 3 | Forced | 125.00 | 0.00 | SCE Gen | 
      
        | DRACKR_2_DSUBT3 | Dracker Solar Unit 3 BESS | Forced | 115.00 | 85.00 | SCE Gen | 
      
        | DRACKR_2_SOLAR2 | Dracker Solar Unit 2 | Planned | 125.00 | 0.00 | SCE Gen | 
      
        | DREWS_6_PL1X4 | Drews Generating Plant | Forced | 41.40 | 20.70 | SCE Gen | 
      
        | DRUM_7_PL3X4 | Drum PH 1 Units 3 & 4 Aggregate | Forced | 28.90 | 28.90 | PGAE North | 
      
        | DRUM_7_UNIT 5 | DRUM PH 2 UNIT 5 | Forced | 50.00 | 0.00 | PGAE North | 
      
        | DSABLA_7_UNIT | De Sabla Hydro | Planned | 18.50 | 18.50 | PGAE North | 
      
        | DSFLWR_2_WS2SR1 | Willow Springs 2 | Planned | 100.00 | 0.00 | SCE Gen | 
      
        | DUANE_1_PL1X3 | DONALD VON RAESFELD POWER PROJECT | Planned | 147.80 | 147.80 | PGAE South | 
      
        | DUTCH1_7_UNIT 1 | DUTCH FLAT 1 PH | Forced | 22.00 | 0.00 | PGAE North | 
      
        | DUTCH2_7_UNIT 1 | DUTCH FLAT 2 PH | Forced | 26.00 | 26.00 | PGAE North | 
      
        | ELCABO_5_ECWSCEDYN | El Cabo Wind | Forced | 298.00 | 4.00 | APS Gen | 
      
        | ELCABO_5_ECWSCEDYN | El Cabo Wind | Forced | 298.00 | 4.00 | SCE Gen | 
      
        | ELCAJN_6_EB1BT1 | Eastern BESS 1 | Planned | 7.50 | 0.00 | SDGE Gen | 
      
        | ELCAJN_6_UNITA1 | Cuyamaca Peak Energy Plant | Forced | 45.42 | 23.42 | SDGE Gen | 
      
        | ELECTR_7_PL1X3 | ELECTRA PH UNIT 1 & 2 AGGREGATE | Planned/Forced | 93.00 | 62.00 | PGAE North | 
      
        | ELKHIL_2_PL1X3 | ELK HILLS COMBINED CYCLE (AGGREGATE) | Forced | 551.70 | 26.70 | PGAE Gen | 
      
        | ELNIDP_6_BIOMAS | El Nido Biomass to Energy | Planned | 10.50 | 0.00 | PGAE South | 
      
        | ELSEGN_2_UN1011 | El Segundo Energy Center 5/6 | Forced | 263.00 | 0.00 | SCE Gen | 
      
        | ELSEGN_2_UN2021 | El Segundo Energy Center 7/8 | Forced | 263.68 | 0.00 | SCE Gen | 
      
        | ETIWND_2_FONTNA | FONTANALYTLE CREEK POWERHOUSE P | Planned | 2.56 | 1.56 | SCE Gen | 
      
        | ETIWND_2_UNIT1 | ETIWND_2_UNIT1 | Planned | 33.60 | 31.60 | SCE Gen | 
      
        | ETIWND_6_GRPLND | Grapeland Peaker | Forced | 47.39 | 0.00 | SCE Gen | 
      
        | EXCHEC_7_UNIT 1 | EXCHEQUER HYDRO | Forced | 94.50 | 12.50 | PGAE South | 
      
        | FLOWD2_2_FPLWND | DIABLO WINDS | Forced | 18.00 | 2.90 | PGAE Gen | 
      
        | FMEADO_6_HELLHL | FMEADO_6_HELLHL | Planned | 0.60 | 0.60 | PGAE North | 
      
        | FMEADO_7_UNIT | FRENCH MEADOWS HYDRO | Planned | 16.00 | 16.00 | PGAE North | 
      
        | FROGTN_1_UTICAM | Murphys Powerhouse | Forced | 3.60 | 2.80 | PGAE Gen | 
      
        | GARLND_2_GASLR | Garland B | Forced | 180.00 | 0.00 | SCE Gen | 
      
        | GARNET_2_COAWD2 | Coachella 2 | Planned/Forced | 10.80 | 10.80 | SCE Gen | 
      
        | GARNET_2_HYDRO | Whitewater Hydro | Forced | 1.00 | 1.00 | SCE Gen | 
      
        | GARNET_2_WIND2 | Karen Avenue Wind Farm | Planned | 11.70 | 1.50 | SCE Gen | 
      
        | GARNET_2_WPMWD6 | WINTEC PALM | Forced | 5.93 | 5.93 | SCE Gen | 
      
        | GATES_2_SOLAR | Gates Solar Station | Forced | 20.00 | 10.00 | PGAE South | 
      
        | GATEWY_2_GESBT1 | Gateway Energy Stroage | Forced | 250.00 | 94.00 | SDGE Gen | 
      
        | GATWAY_2_PL1X3 | GATEWAY GENERATING STATION | Planned | 585.00 | 585.00 | PGAE South | 
      
        | GEYS11_7_UNIT11 | GEYSERS UNIT 11 (HEALDSBURG) | Forced | 86.80 | 9.80 | PGAE Gen | 
      
        | GEYS12_7_UNIT12 | GEYSERS UNIT 12 (HEALDSBURG) | Forced | 57.00 | 16.00 | PGAE Gen | 
      
        | GEYS13_7_UNIT13 | GEYSERS UNIT 13 (HEALDSBURG) | Forced | 73.00 | 16.00 | PGAE Gen | 
      
        | GEYS14_7_UNIT14 | GEYSERS UNIT 14 (HEALDSBURG) | Forced | 70.00 | 14.00 | PGAE Gen | 
      
        | GEYS16_7_UNIT16 | GEYSERS UNIT 16 (HEALDSBURG) | Planned/Forced | 63.00 | 63.00 | PGAE Gen | 
      
        | GEYS17_7_UNIT17 | GEYSERS UNIT 17 (HEALDSBURG) | Forced | 75.50 | 14.50 | PGAE Gen | 
      
        | GEYS18_7_UNIT18 | GEYSERS UNIT 18 (HEALDSBURG) | Forced | 72.00 | 25.00 | PGAE Gen | 
      
        | GEYS20_7_UNIT20 | GEYSERS UNIT 20 (HEALDSBURG) | Forced | 50.00 | 15.00 | PGAE Gen | 
      
        | GIFFEN_6_SOLAR | Giffen Solar Station | Forced | 10.00 | 1.25 | PGAE South | 
      
        | GILROY_1_UNIT | GILROY COGEN AGGREGATE | Planned/Forced | 120.00 | 120.00 | PGAE South | 
      
        | GLNARM_2_UNIT 5 | Glenarm Turbine 5 | Forced | 65.81 | 12.49 | SCE Gen | 
      
        | GLNARM_7_UNIT 1 | GLEN ARM UNIT 1 | Planned | 22.07 | 22.07 | SCE Gen | 
      
        | GLNARM_7_UNIT 2 | GLEN ARM UNIT 2 | Forced | 22.30 | 22.30 | SCE Gen | 
      
        | GOLETA_6_EXGEN | EXXON COMPANY USA | Forced | 48.20 | 48.20 | SCE Gen | 
      
        | GRIZLY_1_UNIT 1 | GRIZZLY HYDRO | Forced | 20.00 | 20.00 | PGAE North | 
      
        | GRZZLY_1_BERKLY | Berkeley Cogeneration | Forced | 26.35 | 26.35 | PGAE Gen | 
      
        | GUERNS_6_HD3BM3 | Hanford Digester Genset 3 | Forced | 1.00 | 0.00 | PGAE Gen | 
      
        | GUERNS_6_VH2BM1 | Hanford Digester Genset 2 | Forced | 1.00 | 1.00 | PGAE Gen | 
      
        | GWFPWR_1_UNITS | Hanford Peaker Plant | Forced | 98.46 | 1.65 | PGAE Gen | 
      
        | GYS5X6_7_UNITS | GEYSERS UNITS 5 & 6 AGGREGATE | Forced | 98.43 | 15.43 | PGAE Gen | 
      
        | GYS7X8_7_UNITS | GEYSERS UNITS 7 & 8 AGGREGATE | Forced | 95.80 | 15.80 | PGAE Gen | 
      
        | HAASPH_7_PL1X2 | HAAS PH UNIT 1 & 2 AGGREGATE | Forced | 144.00 | 129.00 | PGAE North | 
      
        | HAASPH_7_PL1X2 | HAAS PH UNIT 1 & 2 AGGREGATE | Forced | 144.00 | 129.00 | PGAE South | 
      
        | HALSEY_6_UNIT | HALSEY HYDRO | Forced | 13.50 | 9.28 | PGAE Gen | 
      
        | HATCR1_7_UNIT | Hat Creek  #1 | Planned | 8.50 | 8.50 | PGAE North | 
      
        | HATCR2_7_UNIT | Hat Creek  #2 | Planned | 8.50 | 8.50 | PGAE North | 
      
        | HATLOS_6_BWDHY1 | Bidwell Ditch | Forced | 2.00 | 0.50 | PGAE Gen | 
      
        | HATLOS_6_LSCRK | Lost Creek 1 & 2 Hydro Conversion | Forced | 1.70 | 0.71 | PGAE Gen | 
      
        | HATRDG_2_WIND | Hatchet Ridge Wind Farm | Forced | 102.00 | 0.00 | PGAE Gen | 
      
        | HELMPG_7_UNIT 1 | HELMS PUMP-GEN UNIT 1 | Forced | 407.00 | 0.00 | PGAE South | 
      
        | HENRTA_6_UNITA1 | GWF HENRIETTA PEAKER PLANT UNIT 1 | Forced | 49.98 | 1.90 | PGAE South | 
      
        | HENRTA_6_UNITA2 | GWF HENRIETTA PEAKER PLANT UNIT 2 | Forced | 49.42 | 2.15 | PGAE South | 
      
        | HIDSRT_2_UNITS | HIGH DESERT POWER PROJECT AGGREGATE | Forced | 830.00 | 67.00 | SCE Gen | 
      
        | HINSON_6_CARBGN | BP WILMINGTON CALCINER | Forced | 30.00 | 16.00 | SCE Gen | 
      
        | HINSON_6_LBECH1 | Long Beach Unit 1 | Forced | 63.00 | 7.00 | SCE Gen | 
      
        | HINSON_6_LBECH2 | Long Beach Unit 2 | Forced | 63.00 | 9.00 | SCE Gen | 
      
        | HINSON_6_LBECH3 | Long Beach Unit 3 | Forced | 63.00 | 12.00 | SCE Gen | 
      
        | HINSON_6_LBECH4 | Long Beach Unit 4 | Forced | 63.00 | 11.00 | SCE Gen | 
      
        | HMLTBR_6_UNITS | HAMILTON BRANCH PH (AGGREGATE) | Forced | 4.90 | 4.90 | PGAE Gen | 
      
        | HNTGBH_7_UNIT 2 | HUNTINGTON BEACH GEN STA. UNIT 2 | Forced | 225.80 | 0.00 | SCE Gen | 
      
        | HOLGAT_1_BORAX | U.S. Borax, Unit 1 | Planned | 48.20 | 48.20 | SCE Gen | 
      
        | HOOVER_2_MWDDYN | HOOVER | Forced | 249.00 | 98.00 | SCE Gen | 
      
        | HOOVER_2_VEADYN | HOOVER | Forced | 16.00 | 5.00 | SCE Gen | 
      
        | HUMBPP_1_UNITS3 | Humboldt Bay Generating Station 3 | Forced | 65.08 | 0.00 | PGAE North | 
      
        | HUMBPP_6_UNITS | Humboldt Bay Generating Station 1 | Planned/Forced | 97.62 | 48.81 | PGAE North | 
      
        | HYTTHM_2_UNITS | HYATT-THERMALITO PUMP-GEN (AGGREGATE) | Planned/Forced | 933.10 | 852.10 | PGAE Gen | 
      
        | INSKIP_2_UNIT | INSKIP HYDRO | Forced | 8.00 | 8.00 | PGAE North | 
      
        | INTKEP_2_UNITS | CCSF Hetch_Hetchy Hydro Aggregate | Forced | 405.00 | 63.00 | PGAE Gen | 
      
        | INTMNT_3_ANAHEIM | Intermountain Power Project | Planned | 236.00 | 119.00 | SCE Gen | 
      
        | INTMNT_3_PASADENA | Intermountain Power Project | Forced | 107.00 | 54.00 | SCE Gen | 
      
        | INTMNT_3_RIVERSIDE | IPPDYN | Planned | 136.00 | 69.00 | SCE Gen | 
      
        | IVANPA_1_UNIT2 | Ivanpah 2 | Forced | 133.00 | 0.00 | SCE Gen | 
      
        | JAWBNE_2_NSRWND | North Sky River Wind Project | Forced | 160.00 | 6.40 | SCE Gen | 
      
        | JOANEC_2_STABT1 | Santa Ana Storage 1 | Forced | 20.00 | 20.00 | SCE Gen | 
      
        | KANSAS_6_SOLAR | RE Kansas South | Forced | 20.00 | 0.00 | PGAE South | 
      
        | KEKAWK_6_UNIT | STS HYDROPOWER LTD. (KEKAWAKA) | Forced | 5.50 | 5.50 | PGAE Gen | 
      
        | KELSO_2_UNITS | Mariposa Energy | Planned/Forced | 198.03 | 71.25 | PGAE Gen | 
      
        | KELYRG_6_UNIT | KELLY RIDGE HYDRO | Planned | 11.00 | 11.00 | PGAE North | 
      
        | KERKH2_7_UNIT 1 | KERKHOFF PH 2 UNIT #1 | Planned/Forced | 153.90 | 153.90 | PGAE North | 
      
        | KERKH2_7_UNIT 1 | KERKHOFF PH 2 UNIT #1 | Planned/Forced | 153.90 | 153.90 | PGAE South | 
      
        | KERNFT_1_UNITS | KERN FRONT LIMITED | Forced | 52.40 | 2.30 | PGAE South | 
      
        | KERRGN_1_UNIT 1 | KERN RIVER HYDRO UNITS 1-4 AGGREGATE | Forced | 25.60 | 4.10 | SCE Gen | 
      
        | KILARC_2_UNIT 1 | KILARC HYDRO | Forced | 1.50 | 1.50 | PGAE North | 
      
        | KINGRV_7_UNIT 1 | KINGS RIVER HYDRO UNIT 1 | Forced | 51.20 | 0.00 | PGAE South | 
      
        | KNGBRG_1_KBSLR1 | Kingsburg1 | Forced | 1.50 | 0.00 | PGAE South | 
      
        | KNGCTY_6_UNITA1 | King City Energy Center, Unit 1 | Planned/Forced | 44.60 | 44.60 | PGAE Gen | 
      
        | KNTSTH_6_SOLAR | Kent South | Forced | 20.00 | 0.00 | PGAE South | 
      
        | KYCORA_6_KMSBT1 | Kearny Mesa Storage | Forced | 1.00 | 0.00 | SDGE Gen | 
      
        | LAMONT_1_SOLAR4 | Hayworth Solar Farm | Forced | 26.66 | 12.66 | PGAE South | 
      
        | LAMONT_1_SOLAR5 | Redcrest Solar Farm | Forced | 16.66 | 1.66 | PGAE Gen | 
      
        | LAPAC_6_UNIT | LOUISIANA PACIFIC SAMOA | Forced | 20.00 | 20.00 | PGAE Gen | 
      
        | LAPLMA_2_UNIT 1 | La Paloma Generating Plant Unit #1 | Forced | 267.00 | 267.00 | PGAE Gen | 
      
        | LAPLMA_2_UNIT 2 | La Paloma Generating Plant Unit #2 | Forced | 266.00 | 266.00 | PGAE Gen | 
      
        | LAPLMA_2_UNIT 3 | La Paloma Generating Plant Unit #3 | Forced | 266.00 | 7.00 | PGAE Gen | 
      
        | LAPLMA_2_UNIT 4 | LA PALOMA GENERATING PLANT, UNIT #4 | Forced | 267.00 | 23.00 | PGAE Gen | 
      
        | LARKSP_6_UNIT 2 | LARKSPUR PEAKER UNIT 2 | Forced | 47.98 | 0.00 | SDGE Gen | 
      
        | LAROA2_2_UNITA1 | LR2 | Forced | 322.00 | 2.00 | SDGE Gen | 
      
        | LEBECS_2_UNITS | Pastoria Energy Facility | Forced | 799.47 | 15.47 | SCE Gen | 
      
        | LECEF_1_UNITS | LOS ESTEROS ENERGY FACILITY AGGREGATE | Forced | 309.84 | 10.84 | PGAE South | 
      
        | LITLRK_6_SEPV01 | Gestamp Solar 1 | Forced | 2.00 | 0.00 | SCE Gen | 
      
        | LITLRK_6_SOLAR1 | Lancaster Little Rock C | Forced | 5.00 | 1.00 | SCE Gen | 
      
        | LIVOAK_1_UNIT 1 | LIVE OAK LIMITED | Forced | 49.70 | 5.70 | PGAE South | 
      
        | LMBEPK_2_UNITA1 | Lambie Energy Center, Unit #1 | Forced | 47.50 | 1.50 | PGAE Gen | 
      
        | LMEC_1_PL1X3 | Los Medanos Energy Center AGGREGATE | Forced | 580.00 | 3.00 | PGAE Gen | 
      
        | LOCKFD_1_BEARCK | Bear Creek Solar | Forced | 1.50 | 0.00 | PGAE Gen | 
      
        | LODI25_2_UNIT 1 | LODI GAS TURBINE | Forced | 25.00 | 2.00 | PGAE Gen | 
      
        | LODIEC_2_PL1X2 | Lodi Energy Center | Forced | 302.58 | 13.58 | PGAE Gen | 
      
        | LOWGAP_7_QFUNTS | Matthews Dam Hydro | Planned | 1.35 | 1.35 | PGAE North | 
      
        | MAGNLA_6_CERRITOS | Magnolia Power Plant Cerritos | Forced | 12.00 | 2.00 | SCE Gen | 
      
        | MAGNLA_6_COLTON | Magnolia Power Project | Forced | 12.00 | 2.00 | SCE Gen | 
      
        | MAGUND_1_BKSSR2 | Bakersfield Solar 1 | Forced | 5.25 | 1.25 | PGAE Gen | 
      
        | MALCHQ_7_UNIT 1 | MALACHA HYDRO L.P. | Forced | 32.50 | 32.50 | PGAE Gen | 
      
        | MALIN_5_GCPDDYN | Grant County Hydro Facilities | Forced | 125.00 | 125.00 | PGAE Gen | 
      
        | MANZNA_2_WIND | Manzana Wind | Forced | 189.00 | 6.00 | SCE Gen | 
      
        | MARCPW_6_SOLAR1 | Maricopa West Solar PV | Forced | 20.00 | 6.00 | PGAE Gen | 
      
        | MCARTH_6_FRIVRB | Fall River Mills Project B | Forced | 1.50 | 0.00 | PGAE Gen | 
      
        | MCCALL_1_QF | Fish Water | Forced | 0.52 | 0.52 | PGAE Gen | 
      
        | MERCFL_6_UNIT | Merced Falls Powerhouse | Forced | 3.50 | 0.00 | PGAE South | 
      
        | METEC_2_PL1X3 | Metcalf Energy Center | Planned/Forced | 593.16 | 593.16 | PGAE Gen | 
      
        | MIDWY3_2_MDSSR1 | Midway South Solar Farm | Forced | 20.00 | 2.00 | SCE Gen | 
      
        | MIRLOM_2_CORONA | MWD Corona Hydroelectric Recovery Plant | Forced | 2.85 | 2.85 | SCE Gen | 
      
        | MIRLOM_2_LNDFL | Milliken Landfill Solar | Forced | 3.00 | 0.00 | SCE Gen | 
      
        | MIRLOM_2_MLBBTA | Mira Loma BESS A | Planned | 10.00 | 0.00 | SCE Gen | 
      
        | MIRLOM_2_MLBBTB | Mira Loma BESS B | Planned | 10.00 | 0.00 | SCE Gen | 
      
        | MIRLOM_6_PEAKER | Mira Loma Peaker | Forced | 46.00 | 1.40 | SCE Gen | 
      
        | MKTRCK_1_UNIT 1 | MCKITTRICK LIMITED | Forced | 47.49 | 3.49 | PGAE South | 
      
        | MNDALY_6_MCGRTH | McGrath Beach Peaker | Planned/Forced | 47.20 | 4.18 | SCE Gen | 
      
        | MOJAVW_2_SOLAR | Mojave West | Forced | 20.00 | 2.00 | SCE Gen | 
      
        | MONLTH_6_BATTRY | Tehachapi Storage Project | Forced | 7.99 | 5.99 | SCE Gen | 
      
        | MONTPH_7_UNITS | MONTICELLO HYDRO AGGREGATE | Forced | 12.50 | 5.80 | PGAE Gen | 
      
        | MOORPK_2_ACOBT1 | Acorn I BESS | Forced | 2.00 | 0.00 | SCE Gen | 
      
        | MOSSLD_2_PSP2 | MOSS LANDING POWER BLOCK 2 | Forced | 510.00 | 10.00 | PGAE South | 
      
        | MRCHNT_2_PL1X3 | Desert Star Energy Center | Planned | 494.58 | 494.58 | SDGE Gen | 
      
        | MRGT_6_TGEBT1 | Top Gun Energy Storage | Forced | 30.00 | 0.00 | SDGE Gen | 
      
        | MRLSDS_6_SOLAR1 | Morelos Solar | Forced | 15.00 | 0.00 | PGAE Gen | 
      
        | MSOLAR_2_SOLAR1 | Mesquite Solar 1 | Planned | 165.00 | 0.00 | SDGE Gen | 
      
        | MSOLAR_2_SOLAR2 | Mesquite Solar 2 | Planned | 100.81 | 0.00 | SDGE Gen | 
      
        | MSOLAR_2_SOLAR3 | Mesquite Solar 3, LLC | Planned | 152.00 | 0.00 | SDGE Gen | 
      
        | MSTANG_2_SOLAR | Mustang | Planned/Forced | 30.00 | 5.00 | PGAE Gen | 
      
        | MSTANG_2_SOLAR3 | Mustang 3 | Planned/Forced | 40.00 | 40.00 | PGAE Gen | 
      
        | MSTANG_2_SOLAR4 | Mustang 4 | Planned/Forced | 30.00 | 30.00 | PGAE Gen | 
      
        | MTWIND_1_UNIT 1 | Mountain View Power Project I | Forced | 44.40 | 2.40 | SCE Gen | 
      
        | MTWIND_1_UNIT 2 | Mountain View Power Project II | Forced | 22.20 | 2.40 | SCE Gen | 
      
        | MTWIND_1_UNIT 3 | Mountain View Power Project III | Forced | 22.44 | 13.53 | SCE Gen | 
      
        | NAROW1_2_UNIT | NARROWS PH 1 UNIT | Planned | 12.00 | 1.70 | PGAE North | 
      
        | NAROW2_2_UNIT | Narrows Powerhouse Unit 2 | Planned | 55.00 | 45.00 | PGAE North | 
      
        | NCPA_7_GP1UN1 | NCPA GEO PLANT 1 UNIT 1 | Planned | 38.85 | 38.85 | PGAE Gen | 
      
        | NCPA_7_GP1UN2 | NCPA GEO PLANT 1 UNIT 2 | Planned | 39.94 | 39.94 | PGAE Gen | 
      
        | NCPA_7_GP2UN3 | NCPA GEO PLANT 2 UNIT 3 | Forced | 42.42 | 42.42 | PGAE Gen | 
      
        | NEENCH_6_SOLAR | Alpine Solar | Forced | 66.00 | 0.00 | SCE Gen | 
      
        | NGILAA_5_SDGDYN | NGILAA_5_SDGDYN | Forced | 57.00 | 4.00 | APS Gen | 
      
        | NGILAA_5_SDGDYN | NGILAA_5_SDGDYN | Forced | 57.00 | 4.00 | SDGE Gen | 
      
        | NWCSTL_7_UNIT 1 | NEWCASTLE HYDRO | Forced | 12.00 | 12.00 | PGAE Gen | 
      
        | NZWIND_2_WDSTR5 | Windstream 6111 | Forced | 6.31 | 0.00 | SCE Gen | 
      
        | NZWIND_6_CALWND | Wind Resource I | Forced | 9.00 | 0.00 | SCE Gen | 
      
        | NZWIND_6_WDSTR4 | Windstream 6042 | Forced | 6.77 | 0.00 | SCE Gen | 
      
        | OAK C_7_UNIT 1 | OAKLAND STATION C GT UNIT 1 | Forced | 55.00 | 1.50 | PGAE South | 
      
        | OAK C_7_UNIT 3 | OAKLAND STATION C GT UNIT 3 | Forced | 55.00 | 1.00 | PGAE South | 
      
        | OASIS_6_CREST | CREST Contracts | Forced | 13.50 | 0.00 | SCE Gen | 
      
        | OASIS_6_GBDSR4 | Green Beanworks D | Forced | 3.00 | 0.00 | SCE Gen | 
      
        | OCTILO_5_WIND | Ocotillo Wind Energy Facility | Forced | 265.00 | 20.70 | SDGE Gen | 
      
        | OGROVE_6_PL1X2 | Orange Grove Energy Center | Planned | 96.00 | 49.00 | SDGE Gen | 
      
        | OILFLD_7_QFUNTS | Nacimiento Hydroelectric Plant | Forced | 3.80 | 1.30 | PGAE South | 
      
        | OLDRIV_6_CESDBM | Ces Dairy Biogas | Forced | 1.00 | 0.00 | PGAE Gen | 
      
        | OLDRIV_6_LKVBM1 | Lakeview Dairy Biogas | Forced | 1.00 | 0.00 | PGAE Gen | 
      
        | OLINDA_2_COYCRK | MWD Coyote Creek Hydroelectric Recovery | Forced | 3.13 | 3.13 | SCE Gen | 
      
        | OMAR_2_UNIT 1 | KERN RIVER COGENERATION CO. UNIT 1 | Forced | 78.00 | 78.00 | SCE Gen | 
      
        | OMAR_2_UNIT 2 | KERN RIVER COGENERATION CO. UNIT 2 | Forced | 78.11 | 0.00 | SCE Gen | 
      
        | ORLND_6_HIGHLI | High Line Canal Hydro | Forced | 0.50 | 0.50 | PGAE Gen | 
      
        | OROVIL_6_UNIT | Oroville Cogeneration, LP | Forced | 7.50 | 1.50 | PGAE Gen | 
      
        | OSO_6_NSPIN | OSO_6_NSPIN | Forced | 70.00 | 0.00 | SCE Gen | 
      
        | OTMESA_2_PL1X3 | OTAY MESA ENERGY CENTER | Forced | 603.68 | 25.68 | SDGE Gen | 
      
        | PACLUM_6_UNIT | Humboldt Redwood | Forced | 28.80 | 23.80 | PGAE North | 
      
        | PADUA_2_ONTARO | ONTARIO/SIERRA HYDRO PSP | Planned | 1.92 | 1.02 | SCE Gen | 
      
        | PALALT_7_COBUG | Cooperatively Owned Back Up Generator | Forced | 4.50 | 4.50 | PGAE Gen | 
      
        | PALOMR_2_PL1X3 | Palomar Energy Center | Forced | 575.00 | 0.00 | SDGE Gen | 
      
        | PARDEB_6_UNITS | Pardee Power House | Planned/Forced | 30.00 | 30.00 | PGAE Gen | 
      
        | PEABDY_2_LNDFL1 | Potrero Hills Energy Producers | Forced | 8.00 | 3.70 | PGAE South | 
      
        | PEARBL_2_NSPIN | PEARBL_2_NSPIN | Forced | 118.00 | 0.00 | SCE Gen | 
      
        | PINFLT_7_UNITS | PINE FLAT HYDRO AGGREGATE | Planned | 198.51 | 129.51 | PGAE Gen | 
      
        | PIOPIC_2_CTG1 | Pio Pico Unit 1 | Forced | 111.30 | 3.42 | SDGE Gen | 
      
        | PIOPIC_2_CTG2 | Pio Pico Unit 2 | Forced | 112.70 | 1.99 | SDGE Gen | 
      
        | PIOPIC_2_CTG3 | Pio Pico Unit 3 | Forced | 112.00 | 2.09 | SDGE Gen | 
      
        | PIT1_7_UNIT 1 | PIT PH 1 UNIT 1 | Planned/Forced | 32.00 | 32.00 | PGAE North | 
      
        | PIT5_7_PL3X4 | PIT PH 5 UNITS 3 & 4 AGGREGATE | Forced | 82.00 | 41.00 | PGAE North | 
      
        | PIT6_7_UNIT 1 | PIT PH 6 UNIT 1 | Forced | 39.00 | 1.27 | PGAE North | 
      
        | PIT6_7_UNIT 2 | PIT PH 6 UNIT 2 | Forced | 40.00 | 2.27 | PGAE North | 
      
        | PIT7_7_UNIT 1 | PIT PH 7 UNIT 1 | Forced | 55.70 | 4.16 | PGAE North | 
      
        | PIT7_7_UNIT 2 | PIT PH 7 UNIT 2 | Forced | 54.60 | 3.06 | PGAE North | 
      
        | PLACVL_1_CHILIB | Chili Bar Hydro | Forced | 8.40 | 8.40 | PGAE Gen | 
      
        | PLAINV_6_BSOLAR | Western Antelope Blue Sky Ranch A | Forced | 20.00 | 1.00 | SCE Gen | 
      
        | PLAINV_6_SOLAR3 | Sierra Solar Greenworks LLC | Forced | 20.00 | 3.00 | SCE Gen | 
      
        | PLMSSR_6_HISIER | High Sierra Cogeneration Aggregate | Forced | 6.00 | 6.00 | PGAE Gen | 
      
        | PNCHEG_2_PL1X4 | PANOCHE ENERGY CENTER (Aggregated) | Planned/Forced | 401.00 | 95.00 | PGAE Gen | 
      
        | PNCHPP_1_PL1X2 | Midway Peaking Aggregate | Forced | 119.91 | 1.91 | PGAE Gen | 
      
        | PNOCHE_1_PL1X2 | Panoche Peaker | Forced | 49.97 | 0.00 | PGAE South | 
      
        | POEPH_7_UNIT 1 | POE HYDRO UNIT 1 | Forced | 69.00 | 9.00 | PGAE North | 
      
        | POEPH_7_UNIT 2 | POE HYDRO UNIT 2 | Forced | 68.50 | 66.50 | PGAE North | 
      
        | POTTER_6_UNITS | Potter Valley | Forced | 10.10 | 10.10 | PGAE North | 
      
        | PVERDE_5_SCEDYN | PVERDE_5_SCEDYN | Planned | 635.00 | 215.00 | SCE Gen | 
      
        | PWEST_1_UNIT | PACIFIC WEST 1 WIND GENERATION | Forced | 2.10 | 2.10 | SCE Gen | 
      
        | RAMON_2_SCEDYN | RAMON_2_SCEDYN | Forced | 106.18 | 47.18 | SCE Gen | 
      
        | RCKCRK_7_UNIT 1 | ROCK CREEK HYDRO UNIT 1 | Forced | 57.00 | 26.00 | PGAE North | 
      
        | RCKCRK_7_UNIT 2 | ROCK CREEK HYDRO UNIT 2 | Forced | 56.90 | 56.90 | PGAE North | 
      
        | RECTOR_2_CREST | Rector Aggregate Solar Resources | Forced | 14.00 | 3.50 | SCE Gen | 
      
        | RECTOR_2_KAWEAH | KAWEAH PH 2 & 3 PSP AGGREGATE | Forced | 6.55 | 6.55 | SCE Gen | 
      
        | RECTOR_2_KAWH 1 | KAWEAH PH 1 UNIT 1 | Forced | 2.25 | 2.25 | SCE Gen | 
      
        | RECTOR_2_QF | Kaweah Unit 1 | Planned | 20.09 | 20.09 | SCE Gen | 
      
        | REEDLY_6_SOLAR | Terzian | Forced | 1.23 | 0.00 | PGAE Gen | 
      
        | RICHMN_7_BAYENV | BAY ENVIRONMENTAL (NOVE POWER) | Forced | 2.50 | 1.95 | PGAE Gen | 
      
        | ROLLIN_6_UNIT | ROLLINS HYDRO | Forced | 13.50 | 9.38 | PGAE North | 
      
        | ROSMDW_2_WIND1 | Pacific Wind - Phase 1 | Planned/Forced | 140.00 | 28.00 | SCE Gen | 
      
        | RTEDDY_2_SOLAR1 | Rosamond West Solar 1 | Forced | 54.00 | 16.00 | SCE Gen | 
      
        | RTEDDY_2_SOLAR2 | Rosamond West Solar 2 | Forced | 54.00 | 12.00 | SCE Gen | 
      
        | RTREE_2_WIND2 | Rising Tree 2 | Forced | 19.80 | 3.30 | SCE Gen | 
      
        | RUSCTY_2_UNITS | Russell City Energy Center | Planned/Forced | 615.18 | 0.00 | PGAE South | 
      
        | RVSIDE_6_RERCU1 | Riverside Energy Res. Ctr Unit 1 | Planned | 48.35 | 48.35 | SCE Gen | 
      
        | RVSIDE_6_RERCU2 | Riverside Energy Res. Ctr Unit 2 | Planned | 48.50 | 48.50 | SCE Gen | 
      
        | RVSIDE_6_SOLAR1 | Tequesquite Landfill Solar Project | Forced | 7.50 | 1.50 | SCE Gen | 
      
        | SALIRV_2_UNIT | Salinas River Cogeneration | Planned | 39.00 | 39.00 | PGAE South | 
      
        | SALTSP_7_UNITS | SALT SPRINGS HYDRO AGGREGATE | Forced | 46.00 | 46.00 | PGAE North | 
      
        | SANTFG_7_UNITS | GEYSERS CALISTOGA AGGREGATE | Planned/Forced | 72.00 | 36.00 | PGAE Gen | 
      
        | SANTGO_2_LNDFL1 | Bowerman Power | Planned | 19.60 | 19.60 | SCE Gen | 
      
        | SANWD_1_QF | San Gorgonio Farms Wind Farm | Forced | 31.00 | 9.11 | SCE Gen | 
      
        | SBERDO_2_PSP3 | Mountainview Gen Sta. Unit 3 | Forced | 555.00 | 0.00 | SCE Gen | 
      
        | SBERDO_2_PSP4 | Mountainview Gen Sta. Unit 4 | Planned | 555.00 | 555.00 | SCE Gen | 
      
        | SBERDO_2_SNTANA | SANTA ANA PSP | Forced | 6.95 | 5.95 | SCE Gen | 
      
        | SBERDO_6_MILLCK | MILL CREEK PSP | Planned | 3.93 | 3.03 | SCE Gen | 
      
        | SCEHOV_2_HOOVER | SCEHOV_2_HOOVER | Forced | 287.01 | 113.01 | SCE Gen | 
      
        | SCHLTE_1_PL1X3 | Tracy Combined Cycle Power Plant | Forced | 336.04 | 15.54 | PGAE Gen | 
      
        | SCHNDR_1_WSTSDE | Westside Solar Station | Forced | 15.00 | 5.00 | PGAE Gen | 
      
        | SEGS_1_SR2SL2 | Sunray 2 | Planned | 20.00 | 0.00 | SCE Gen | 
      
        | SENTNL_2_CTG7 | Sentinel Unit 7 | Forced | 106.73 | 3.73 | SCE Gen | 
      
        | SIERRA_1_UNITS | HIGH SIERRA LIMITED | Forced | 52.43 | 2.33 | PGAE Gen | 
      
        | SLSTR2_2_SOLAR2 | Solar Star 2 | Planned | 276.00 | 0.00 | SCE Gen | 
      
        | SLUISP_2_UNITS | SAN LUIS (GIANELLI) PUMP-GEN (AGGREGATE) | Planned/Forced | 374.43 | 204.43 | PGAE Gen | 
      
        | SLYCRK_1_UNIT 1 | SLY CREEK HYDRO | Forced | 13.00 | 2.90 | PGAE North | 
      
        | SMUDGO_7_UNIT 1 | SONOMA POWER PLANT | Forced | 64.80 | 3.80 | PGAE Gen | 
      
        | SNCLRA_2_HOWLNG | Houwelings Nurseries Oxnard, Inc | Forced | 13.00 | 11.01 | SCE Gen | 
      
        | SNCLRA_2_UNIT1 | New Indy Oxnard | Planned | 27.80 | 16.80 | SCE Gen | 
      
        | SNCLRA_6_OXGEN | OXGEN | Planned | 47.70 | 47.70 | SCE Gen | 
      
        | SNDBAR_7_UNIT 1 | SANDBAR | Planned | 16.20 | 16.20 | PGAE North | 
      
        | SPAULD_6_UNIT12 | SPAULDING HYDRO PH 1 & 2 AGGREGATE | Forced | 11.40 | 5.95 | PGAE North | 
      
        | SPBURN_2_UNIT 1 | Burney Biomass | Forced | 22.00 | 14.00 | PGAE North | 
      
        | SPOINT_2_MEADDYN | SPOINT_2_MEADDYN | Planned | 325.00 | 325.00 | SCE Gen | 
      
        | SPOINT_2_PARKERDYN | Southpoint Energy Center | Planned | 200.00 | 200.00 | SCE Gen | 
      
        | SPQUIN_6_SRPCQU | Quincy Biomass | Planned | 24.00 | 17.50 | PGAE North | 
      
        | SPRGAP_1_UNIT 1 | SPRING GAP HYDRO | Planned | 7.00 | 7.00 | PGAE North | 
      
        | SPRGVL_2_TULE | TULE RIVER HYDRO PLANT (PG&E) | Forced | 6.40 | 6.40 | SCE Gen | 
      
        | STANIS_7_UNIT 1 | STANISLAUS HYDRO | Planned | 91.00 | 91.00 | PGAE North | 
      
        | STIGCT_2_LODI | LODI STIG UNIT | Forced | 49.90 | 0.90 | PGAE Gen | 
      
        | STNRES_1_UNIT | Covanta Stanislaus | Forced | 19.90 | 19.90 | PGAE North | 
      
        | STROUD_6_SOLAR | Stroud Solar Station | Forced | 20.00 | 2.00 | PGAE South | 
      
        | SUMWHT_6_SWSSR1 | Summer Wheat Solar Farm | Forced | 18.50 | 4.40 | PGAE Gen | 
      
        | SUNRIS_2_PL1X3 | Sunrise Power Project AGGREGATE II | Planned | 586.02 | 586.02 | PGAE Gen | 
      
        | SUNSET_2_UNITS | MIDWAY SUNSET COGENERATION PLANT | Planned/Forced | 248.00 | 166.00 | PGAE South | 
      
        | SUNSPT_2_WNASR1 | Windhub Solar A | Forced | 20.00 | 0.00 | SCE Gen | 
      
        | SWIFT_1_NAS | YERBA BUENA BATTERY | Forced | 4.80 | 4.80 | PGAE South | 
      
        | SYCAMR_2_UNIT 2 | Sycamore Cogeneration Unit 2 | Forced | 78.00 | 78.00 | SCE Gen | 
      
        | TANHIL_6_SOLART | Berry Cogen 18 | Planned | 17.00 | 0.00 | PGAE South | 
      
        | TBLMTN_6_QF | SMALL QF AGGREGATION - PARADISE | Forced | 1.70 | 0.15 | PGAE Gen | 
      
        | TEHAPI_2_PW1WD1 | Point Wind 1 | Planned/Forced | 47.49 | 47.49 | SCE Gen | 
      
        | TEHAPI_2_PW2WD2 | Point Wind 2 | Planned/Forced | 14.40 | 14.40 | SCE Gen | 
      
        | TEHAPI_2_WIND2 | Wind Wall Monolith 2 | Forced | 23.66 | 2.06 | SCE Gen | 
      
        | TENGEN_2_PL1X2 | Berry Cogen 42 | Forced | 40.20 | 20.20 | SCE Gen | 
      
        | TERMEX_2_PL1X3 | TDM | Forced | 625.00 | 0.00 | SDGE Gen | 
      
        | TIGRCK_7_UNITS | TIGER CREEK HYDRO AGGREGATE | Planned | 62.00 | 62.00 | PGAE North | 
      
        | TOADTW_6_UNIT | TOAD TOWN | Planned | 1.50 | 1.50 | PGAE North | 
      
        | TRNQL8_2_ROJSR1 | Tranquillity 8 Rojo | Forced | 100.00 | 0.00 | PGAE Gen | 
      
        | TRNQL8_2_VERSR1 | Tranquillity 8 Verde | Forced | 60.00 | 0.00 | PGAE Gen | 
      
        | TRNQLT_2_SOLAR | Tranquillity | Planned | 200.00 | 0.00 | PGAE Gen | 
      
        | TRNSWD_1_QF | FPL Energy C Wind | Forced | 38.97 | 22.47 | SCE Gen | 
      
        | TWISSL_6_SOLAR | Nickel 1 ("NLH1") | Forced | 1.50 | 0.00 | PGAE Gen | 
      
        | UKIAH_7_LAKEMN | UKIAH LAKE MENDOCINO HYDRO | Forced | 3.50 | 3.50 | PGAE Gen | 
      
        | UNOCAL_1_UNITS | TOSCO (RODEO PLANT) | Forced | 49.85 | 0.00 | PGAE South | 
      
        | USWND2_1_WIND1 | Golden Hills A | Forced | 42.96 | 3.56 | PGAE Gen | 
      
        | USWND2_1_WIND2 | Golden Hills B | Forced | 42.96 | 0.00 | PGAE Gen | 
      
        | USWND2_1_WIND3 | Golden Hills C | Forced | 46.00 | 2.30 | PGAE Gen | 
      
        | USWNDR_2_LABWD1 | LaBrisa Wind Project | Forced | 9.00 | 0.00 | PGAE Gen | 
      
        | USWNDR_2_SMUD | SOLANO WIND FARM | Forced | 102.18 | 1.32 | PGAE Gen | 
      
        | USWNDR_2_SMUD2 | Solano Wind Project Phase 3 | Forced | 127.80 | 1.80 | PGAE Gen | 
      
        | USWPJR_2_UNITS | Vasco Wind | Forced | 78.20 | 9.20 | PGAE Gen | 
      
        | VACADX_1_NAS | VACA-DIXON BATTERY | Forced | 0.70 | 0.00 | PGAE North | 
      
        | VACADX_1_UNITA1 | CalPeak Power Vaca Dixon Unit 1 | Planned | 50.61 | 0.00 | PGAE Gen | 
      
        | VALLEY_5_PERRIS | MWD Perris Hydroelectric Recovery Plant | Forced | 7.94 | 7.94 | SCE Gen | 
      
        | VEDDER_1_SEKERN | TEXACO EXPLORATION & PROD (SE KERN RIVER | Forced | 34.47 | 12.47 | PGAE Gen | 
      
        | VESTAL_2_KERN | KERN RIVER PH 3 UNITS 1 & 2 AGGREGATE | Forced | 36.80 | 7.80 | SCE Gen | 
      
        | VICTOR_1_CREST | Victor Aggregate Solar Resources | Forced | 24.50 | 0.00 | SCE Gen | 
      
        | VICTOR_1_SOLAR2 | Alamo Solar | Forced | 20.00 | 0.00 | SCE Gen | 
      
        | VILLPK_2_VALLYV | MWD Valley View Hydroelectric Recovery P | Forced | 4.10 | 4.10 | SCE Gen | 
      
        | VOYAGR_2_VOAWD5 | Voyager Wind Oasis Alta | Planned/Forced | 13.98 | 13.98 | SCE Gen | 
      
        | VSTAES_6_VESBT1 | Vista Energy Storage | Forced | 40.00 | 6.60 | SDGE Gen | 
      
        | WALCRK_2_CTG1 | Walnut Creek Energy Park Unit 1 | Forced | 96.43 | 0.00 | SCE Gen | 
      
        | WALCRK_2_CTG2 | Walnut Creek Energy Park Unit 2 | Forced | 96.91 | 0.00 | SCE Gen | 
      
        | WALCRK_2_CTG3 | Walnut Creek Energy Park Unit 3 | Forced | 96.65 | 0.00 | SCE Gen | 
      
        | WALCRK_2_CTG4 | Walnut Creek Energy Park Unit 4 | Forced | 96.49 | 0.00 | SCE Gen | 
      
        | WALCRK_2_CTG5 | Walnut Creek Energy Park Unit 5 | Forced | 96.65 | 0.00 | SCE Gen | 
      
        | WALNUT_2_SOLAR | Industry MetroLink PV 1 | Forced | 1.50 | 0.00 | SCE Gen | 
      
        | WESTPT_2_UNIT | West Point Hydro Plant | Planned | 14.00 | 14.00 | PGAE Gen | 
      
        | WFRESN_1_SOLAR | Joya Del Sol | Forced | 1.50 | 0.00 | PGAE Gen | 
      
        | WHTWTR_1_WINDA1 | Whitewater Hill Wind Project | Forced | 61.50 | 21.50 | SCE Gen | 
      
        | WISE_1_UNIT 1 | Wise Hydro Unit 1 | Forced | 14.50 | 8.00 | PGAE Gen | 
      
        | WISHON_6_UNITS | Wishon/San Joaquin  #1-A AGGREGATE | Planned/Forced | 18.40 | 18.40 | PGAE Gen | 
      
        | WNDMAS_2_UNIT 1 | BUENA VISTA ENERGY, LLC | Forced | 38.00 | 1.00 | PGAE Gen | 
      
        | WOLFSK_1_UNITA1 | Wolfskill Energy Center | Planned/Forced | 46.90 | 46.90 | PGAE Gen | 
      
        | WSENGY_1_UNIT 1 | Wheelabrator Shasta | Forced | 50.00 | 16.00 | PGAE North | 
      
        | WSTWND_2_M90WD2 | Mojave 90 | Planned/Forced | 48.85 | 4.25 | SCE Gen | 
      
        | ZOND_6_UNIT | ZOND WINDSYSTEMS INC. | Forced | 17.10 | 17.10 | PGAE Gen | 
      
        | BLKDIA_2_BDEBT1 | Black Diamond Energy Storage | Forced | 200.00 | 200.00 |  | 
      
        | CABALO_2_M2WSR2 | Mustang 2 Whirlaway Solar | Planned | 100.00 | 0.00 |  | 
      
        | CENT40_1_C40SR1 | CENTRAL 40 | Forced | 40.00 | 0.00 |  | 
      
        | SUNST2_5_SS2SR1 | Sun Streams Solar 2 | Planned | 150.00 | 0.00 |  | 
      
        | SUTTER_2_CISO | Sutter Power Plant Pseudo-CISO | Forced | 275.00 | 275.00 |  | 
      
        | VISTRA_5_DALBT1 | Dallas Energy Storage | Forced | 100.00 | 100.00 |  | 
      
        | VISTRA_5_DALBT2 | Dallas Energy Storage 2 | Forced | 100.00 | 100.00 |  | 
      
        | VISTRA_5_DALBT3 | Dallas Energy Storage 3 | Forced | 100.00 | 100.00 |  | 
      
        | VOLTA_7_PONHY1 | VOLTA_7_PONHY1 | Forced | 1.25 | 1.25 |  |