Notice
May 31, 2023
REQUESTED ACTION
Request for Comment
CATEGORIES
Legal & Regulatory
BPM change management: Proposed revision requests and updated BPMs posted as of 5/31/23
MESSAGE

The California ISO has posted new Proposed Revision Requests (PRRs) reflecting edits to Business Practice Manuals (BPMs). Revised BPMs that have completed the BPM change management process are posted in the BPM Library. All PRRs and related activity are publicly available through the BPM change management site.

 

BPM PRR updates are part of the ISO Daily Briefing in addition to being listed in the “Announcement” sections of the BPM change management tool. These updates include PRRs that have become available for review, upcoming BPM meetings, and comment due dates. All registered BPM users should continue to reference the BPM Change Management tool to see current PRR status. Subscribe to the Daily Briefing to stay up to date.

 

The PRRs listed below have an open 10-business day comment or appeal period from May 31, 2023 through June14, 2023.

 

New PRRs

 

PRR 1508 Reliability Requirements BPM, Clarifications to new use import commitment submission and processing

PRR 1509 Outage Management BPM, Use limit reached outage cards

PRR 1510 Market Operations BPM, Clarifications regarding use-limited resources

PRR 1511 Market Instruments BPM, Clarifications regarding the use limit plan data template and opportunity costs for use-limited resources

PRR 1512 Generator Management BPM, Updates to battery energy storage system conversions, modification submissions, and phased generating facility clarification

PRR 1513 Managing Full Network Model BPM, Full network model scope change management process update

PRR 1514 Reliability Requirements BPM, 2024 Availability assessment hours

 

ISO Recommendations

 

PRR 1491 Settlements and Billing BPM, Updated BPM configuration guide for pre-calculation real time market net amount v5.37 to accommodate ancillary service state of charge constraint initiative

PRR 1492 Settlements and Billing BPM, Created two new charge codes in accordance with the resource sufficiency evaluation enhancement phase 2 initiative

PRR 1493 Settlements and Billing BPM, Updated BPM configuration guide for charge group pre-calculation system resource deemed delivered energy quantity to accommodate logical meter calculator scenarios where the electronic tag is curtailed mid-hour

PRR 1494 Settlements and Billing BPM, Updated charge group pre-calculation metered subsystems deviation penalty quantity to accurately account for resources with spinning/non-spinning capacity dispatches outside contingency intervals

PRR 1495 Settlements and Billing BPM, Updated multiple BPM configuration guides to accommodate market services production allocating one sided charge or payment neutrality adjustments to measured demand in charge code 8989 and charge code 8999 while also achieving revenue neutrality

PRR 1496 Market Instruments BPM, Updating fuel region prices

PRR 1497 Market Operations BPM, Interchange tagging changes related to resource sufficiency evaluation enhancement phase 2 project

PRR 1498 Energy Imbalance Market BPM, Assistance transfer energy

PRR 1499 Settlements and Billing BPM, Updated BPM configuration guide for charge code 701 forecasting service fee 5.6 to accommodate hybrid 2C initiative

PRR 1500 Market Instruments BPM, Open access same time information system and CAISO market results interface report changes for resource sufficiency evaluation enhancements phase 2 project

PRR 1501 Market Operations BPM, Updates details and requirements for hybrid dynamic limits

PRR 1502 Market Instruments BPM, Clarifications to component level dispatchable flag

PRR 1505 Market Operations BPM, Emergency PRR, Refinements to penalty pricing improvements identified from last summer

PRR 1506 Energy Imbalance Market BPM, Emergency PRR, Western energy imbalance market Washington greenhouse gas enhancements

PRR 1507 Market Instruments BPM, Emergency PRR, Western energy imbalance market Washington greenhouse gas enhancements

 

ISO Final Decisions

 

PRR 1490 Reliability Requirements BPM, Clarification for pumping load bidding rule

 

BPM Library Updates

The PRR tracking log on the ISO website lists the updated BPMs in the library.

 

The ISO may unilaterally make and implement revisions to the BPMs in emergency circumstances, as set forth in Sections 22.4.3 and 22.11 of the ISO Tariff and in Section 2.6 of the Business Practice Manual for BPM Change Management. An emergency PRR will continue through the BPM change management stakeholder process to obtain stakeholder input on the revisions and make other recommendations, as necessary.

 

Please note that affected parties must register in order to submit a PRR or written comments.

 

More information on the BPM change management process is available on the BPM webpage of the ISO website.

CONTACT INFORMATION

Please contact Christina Costa at 916-293-1696 or BPM_CM@caiso.com with any questions.

California Independent System Operator | P.O. Box 639014 | Folsom, CA 95630 | United States
Copyright © 2023 California Independent System Operator. All rights reserved.