The California ISO has revised the operating procedure referenced below.
2510 NERC Tagging Requirements, version 9.3, effective Dec. 13, 2022.
Periodic Review:
Section 3.1.5: Updated per 2022 review of North American Electric Reliability Corporation (NERC) Standard INT-006-5 Reliability Standard Audit Worksheet (RSAW) to align CAISO Operating Procedure 2510 with the validation process. Updated Western Electricity Coordinating Council (WECC) Standard INT-021-WECC-CRT-3. Updated title of reference to 2510B under Appendix. Minor formatting and grammar edits.
2510A Point of Receipt (POR)/Point of Delivery (POD)-Scheduling Path Cross Reference, version 12.0, effective Dec. 13, 2022.
Periodic Review:
Added Note 9 to clarify PNodes mapping for Sacramento Municipal Utility District (SMUD)/Turlock Irrigation District (TID). Updated from ISO to CAISO in most instances, minor format and grammar edits, and removed history prior to five years.
2510B CAISO Tagging Templates, version 1.2, effective Dec. 13, 2022
Periodic Review: Updated ISO to CAISO and from CISO to CAISO with template titles only.
2510C Allowable Tag and Market Award Combinations, version 1.1, effective Dec. 13, 2022.
Periodic Review: Updated from ISO to CAISO and minor formatting only.
3320 Voltage and VAR Control, version 8.1, effective Dec. 13, 2022.
Periodic Review:
Section 3.1.3: Correction made to Item 2, for dispatching “Legacy” RMR units first.
Updated NERC Requirements. Added reference to 3320A to appendix section. Removed history prior to five years. Minor format and grammar edits for procedures consistency.
The California ISO’s operating procedures are available on the Operating Procedures webpage.