Notice
April 16, 2024
REQUESTED ACTION
Forward to Operating Department
CATEGORIES
Operations
Notification of revised RC West operating procedure RC0610
MESSAGE

The California ISO has revised the operating procedure referenced below.

 

RC0610 System Operating Limits Methodology for the Operations Horizon, version 3.1, effective April 16, 2024.

Section K: Added line/load tap buses and buses in a radial network to default Bulk Electric System (BES) exclusions for Voltage System Operating Limit (SOL) monitoring and clarified RC West process for addressing BES exclusions. Approved by Voltage SOL task force.

 

The California ISO and RC West operating procedures are available on the Operating Procedures webpage.

CONTACT INFORMATION

Please contact the CAISO/RC West Procedure Control Desk at ProcedureControl@caiso.com with any questions.

California Independent System Operator | P.O. Box 639014 | Folsom, CA 95630 | United States
Copyright © 2024 California Independent System Operator. All rights reserved.