Notice
Dec. 7, 2023
REQUESTED ACTION
Information Only
CATEGORIES
Planning
Updated Briefing on Resources Available for Near Term Interconnection posted
MESSAGE

The California ISO has posted an updated version of the Briefing on Resources Available for Near Term Interconnection on the Generator Interconnection webpage.

 

The information contained in this presentation was drawn from non-confidential cluster study reports and reassessments. To the extent differences are found between this information and the source documents, the source documents should be relied upon.

 

The updated version of the Briefing on Resources Available for Near Term Interconnection now includes Cluster 13 Phase II Study information, energy only generation added to south area lists, all code dates, and data as of Sept. 8, 2023 reflected on slides 3, 4, and 6-14.

CONTACT INFORMATION

Please contact Kaitlin McGee at kmcgee@caiso.com or ISOStakeholderAffairs@caiso.com with any questions.

 

California Independent System Operator | P.O. Box 639014 | Folsom, CA 95630 | United States
Copyright © 2023 California Independent System Operator. All rights reserved.