5 Congestion Revenue Rights

Congestion revenue rights auction efficiency 1B became in effect on January 1, 2019. It includes key changes related to the congestion revenue rights settlements process:

  • Targeted reduction of congestion revenue rights payouts on a constraint by constraint basis.
  • Distribute congestion revenues to the extent that CAISO collected the requisite revenue on the constraint over the month. That is, implement a pro-rata funding for CRRs.
  • Allow surpluses on one constraint in one hour to offset deficits on the same constraint in another hour over the course of the month.
  • Only distribute surpluses to congestion revenue rights if the surplus is collected on a constraint that the congestion revenue right accrued a deficit, and only up to the full target payment value of the congestion revenue right.
  • Distribute remaining surplus revenue at the end of the month, which are associated with constraints that collect more surplus over the month than deficits, to measured demand.

Monthly CRR Revenue

Figure 11 illustrates the daily CRR notional value in the corresponding month for the various transmission elements that experienced congestion during the month. CRR notional value is calculated as the product of CRR implied flow and constraint shadow price in each hour per constraint and CRR.

Figure 11: Daily CRR Notional Value by Transmission Element

Daily CRR Notional Value by Transmission Element

Figure 12 illustrates the daily CRR offset value in the corresponding month for the transmission elements that experienced congestion during the month. CRR offset value is the difference between the revenue collected from the congestion CRR. A positive CRR offset value represents surplus and a negative CRR offset value represents shortfall.

The main reasons for CRR offset shortfall are

  • The line 31334_CLER LKE_60.0_31338_KONOCTI6_60.0_BR_1_1 was binding in 22 days of this month, resulting in offset shortfall of $5.12 million.
  • The nomogram MIGUEL_BKs_MXFLW_NG was binding in three days of this month, resulting in offset shortfall of $1.57 million.

The main reasons for CRR offset surplus are

  • The transformer 30055_GATES1_500_30900_GATES_230_XF_12_P was binding in 14 days of this month, resulting in offset surplus of $0.81 million.
  • The line 31227_HGHLNDJ2_115_31950_CORTINA _115_BR_1_1 was binding throughout this month, resulting in offset surplus of $0.76 million.

Figure 12: Daily CRR Offset Value by Transmission Element

Daily CRR Offset Value by Transmission Element

Furthermore, Table 5 shows the monthly CRR deficit in the month broken out by transmission elements and Table 6 shows the monthly CRR surplus in the month broken out by transmission elements.

Table 5: CRR Deficit by Transmission Element
Constraint Percent
31334_CLER LKE_60.0_31338_KONOCTI6_60.0_BR_1 _1 31.08
Other 20.95
MIGUEL_BKs_MXFLW_NG 9.52
30900_GATES _230_30970_MIDWAY _230_BR_1 _1 9.41
30750_MOSSLD _230_30797_LASAGUIL_230_BR_1 _1 6.08
7820_13810A_RAS_MS-SA_NG 5.56
35616_SNJOSEB _115_35612_TRIMBLE _115_BR_1 _1 4.83
30763_Q0577SS _230_30765_LOSBANOS_230_BR_1 _1 3.82
30805_BORDEN _230_30810_GREGG _230_BR_2 _1 3.29
7820_TL23040_IV_SPS_NG 2.89
34116_LE GRAND_115_34115_ADRA TAP_115_BR_1 _1 2.57
Table 6: CRR Surplus by Transmission Element
Constraint Percent
Other 29.36
30055_GATES1 _500_30900_GATES _230_XF_12_P 19.35
31227_HGHLNDJ2_115_31950_CORTINA _115_BR_1 _1 17.92
NdGrp: 24017_BLYTHESC_161_B1 9.00
99254_J.HINDS2_230_24806_MIRAGE _230_BR_1 _1 8.71
7820_13810A_OVERLOAD_NG 5.83
24801_DEVERS _500_24804_DEVERS _230_XF_1 _P 2.52
30515_WARNERVL_230_30800_WILSON _230_BR_1 _1 2.21
30055_GATES1 _500_30060_MIDWAY _500_BR_1 _1 1.86
NdGrp: 24201_BARRE _66.0_B1 1.63
NdGrp: 32454_DRUM 5 _13.8_B1 1.60

Table 7 shows the monthly CRR payment in the month broken out by transmission elements

Table 7: CRR Payment by Transmission Element
Constraint Percent
Other 32.53
30750_MOSSLD _230_30797_LASAGUIL_230_BR_1 _1 11.16
30763_Q0577SS _230_30765_LOSBANOS_230_BR_1 _1 10.70
31334_CLER LKE_60.0_31338_KONOCTI6_60.0_BR_1 _1 8.53
30900_GATES _230_30970_MIDWAY _230_BR_1 _1 7.68
31227_HGHLNDJ2_115_31950_CORTINA _115_BR_1 _1 6.58
MIGUEL_BKs_MXFLW_NG 5.22
30790_PANOCHE _230_30900_GATES _230_BR_2 _1 5.22
34116_LE GRAND_115_34115_ADRA TAP_115_BR_1 _1 4.89
7820_13810A_RAS_MS-SA_NG 4.07
30055_GATES1 _500_30900_GATES _230_XF_12_P 3.42

Table 8 shows the monthly CRR payments. Net monthly balancing surplus in October was $1.70 million. The auction revenues credited to the balancing account for October was $6.14 million. As a result, the balancing account for October had a surplus of approximately $7.84 million, which was allocated to measured demand. The Net Monthly Balancing Surplus is calculated as sum of CRR surplus plus CRR daily Balancing account minus total auction revenue. The Total Auction revenue is sum of monthly and annual auction revenue. The Allocation to Measured demand is calculated as sum of Total Auction revenue plus Net Monthly Balancing Surplus.

Table 8: CRR Revenue Statistics
Description OCTOBER -2022 SEPTEMBER-2022
CRR Notional Value $58,412,180 $106,075,968
CRR Deficit -$16,482,885 -$44,358,972
CRR Settlement Rule -$1,490 -$5,729
CRR Adjusted Payment $41,927,805 $61,711,267
CRR Surplus $4,224,308 $12,536,238
Monthly Auction Revenue $3,902,197 $5,489,586
Annual Auction Revenue $2,238,777 $3,594,503
CRR Daily Balancing Account $3,616,751 -$10,577,441
Net Monthly Balancing Surplus $1,700,086 -$7,125,292
Allocation to Measured Demand $7,841,060 $1,958,797