Day-Ahead Prices

Figure 3.1 shows the daily simple average prices for all hours in IFM for each of the four default load-aggregation points (DLAP): PG&E, SCE, SDG&E, and VEA.

Average Day-Ahead DLAP prices in PGAE, SCE, SDGE, and VEA all increased between from October to November, aligning with an increase of gas price.

TABLE 3.1 below lists the binding constraints that resulted in relatively high or low DLAP prices on certain dates.

Figure 3.1: IFM (Day-Ahead) Simple Average DLAP Prices (All Hours)

IFM (Day-Ahead) Simple Average DLAP Prices (All Hours)
Table 3.1: Day-Ahead Transmission Constraint
DLAP LMPs Affected Dates Transmission Constraint
PGAE Nov 1 MOSSLD-LASAGUIL-230kV line from HE 9 to HE 17
PGAE; SDGE Nov 2 7820_TL 230S_OVERLOAD_NG nomogram binding from HE 1 to HE 15 along with congestion on the GATES1-MIDWAY-500kV line from HE 9 to HE 15
PGAE; SDGE Nov 3 MOSSLD-LASAGUIL-230kV line from HE 9 to HE 15 and on the SILVERGT-CORONADO-69kV line from HE 10 to HE 11
PGAE Nov 4 MOSSLD-LASAGUIL-230kV line from HE 8 to HE 17
PGAE Nov 5 PANOCHE-GATES-230kV line from HE 8 to HE 17 and on the MOSSLD-LASAGUIL-230kV line from HE 8 to HE 17
PGAE Nov 6 TESLA-LOSBANOS-500kV line from HE 9 to HE 16 and on the MOSSLD-LASAGUIL-230kV line from HE 8 to HE 17
PGAE Nov 7 TESLA-LOSBANOS-500kV line from HE 9 to HE 15
PGAE Nov 8 GATES1-MIDWAY-500kV line from HE 8 to HE 16
PGAE Nov 9 WHISMAN-MNTA VSA-115kV line from HE 8 to HE 17 and on the LOSBANOS-PANOCHE-230kV line from HE 9 to HE 16
PGAE; SDGE; VEA; SCE Nov 10 DOUBLTTP-FRIARS-138kV line from HE 8 to HE 19
PGAE; VEA Nov 11 DOUBLTTP-FRIARS-138kV line from HE 8 to HE 19
PGAE; VEA Nov 12 7690-CONTRL-INYOKN_EXP_NG nomogram from HE 1 to HE 24
PGAE Nov 13 GATES1-MIDWAY-500kV line from HE 8 to HE 16
PGAE; SDGE; VEA; SCE Nov 14-15 CONTROL-TAP188 115kV line from HE 1 to HE 9 and HE 11 to HE 21 and on the CONTRL-INYOKN EXP nomogram from HE 1 to HE 24
PGAE; VEA Nov 16 CONTROL-TAP188 115kV line from HE 1 to HE 24 and on the on the EL-CAJON-LOSCOCHS 69 kV line from HE 8 to HE 22
PGAE; SDGE; VEA; SCE Nov 17 OMS 50004 IV-ML OUTAGE_NG nomogram binding from HE 9 to HE 18 along with congestion on the SUNCREST-SUNCREST-230 XFMR from HE 9 to HE 16
PGAE; SDGE; VEA; SCE Nov 18 CONTROL-TAP188-115kV line from HE 1 to HE 20 and on the EL CAJON-LOSCOCHS-69kV line from HE 1 to HE 24
PGAE; SDGE; VEA; SCE Nov 19 LOSBANOS-PANOCHE-230kV line from HE 10 to HE 16
PGAE; SDGE; VEA; SCE Nov 20 GATES1-MIDWAY-500kV line from HE 8 to HE 19
PGAE; SDGE; VEA; SCE Nov 21 EL CAJON-LOSCOCHS-69kV line from HE 1 to HE 24
PGAE; SDGE; VEA; SCE Nov 22 CONTROL-TAP188-115kV line from HE 1 to HE 24
PGAE; SDGE Nov 23 MIGUEL_BKs_MXFLW_NG nomogram binding from HE 7 to HE 19 along with congestion on the GATES1-MIDWAY-500kV line from HE 8 to HE 19
PGAE Nov 24-26 GATES1-MIDWAY-500kV line from HE 8 to HE 18
PGAE Nov 27 GATES1-MIDWAY-500kV line from HE 9 to HE 15
PGAE Nov 28 GATES1-MIDWAY-500kV line from HE 8 to HE 19
PGAE Nov 29 GATES1-MIDWAY-500kV line from HE 8 to HE 15
PGAE Nov 30 GATES1-MIDWAY-500kV line from HE 8 to HE 20

Real-Time Price

Figure 3.2 shows daily simple average prices for all four DLAPs (PG&E, SCE, SDG&E, and VEA) for all hours respectively in FMM.

Average FMM DLAP prices across PGAE, SCE, SDGE, and VEA increased relative to the previous month.

TABLE 3.2 below lists the binding constraints that resulted in relatively high or low DLAP prices on certain dates.

Figure 3.2: FMM Simple Average DLAP Prices (All Hours)

FMM Simple Average DLAP Prices (All Hours)
Table 3.2: FMM Transmission Constraint
DLAP LMPs Affected Dates Transmission Constraint
PGAE Nov 1 PANOCHE-GATES-230kV line from HE 10 to HE 11 and on the LOSBANOS-PANOCHE-230kV line from HE 11 to HE 13
PGAE Nov 4 TESLA-LOSBANOS-500kV line from HE 8 to HE 16, MOSSLD-LASAGUIL-230kV line from HE 11 to HE 17, and on the NWK DIST-LS ESTRS-230kV line from HE 16 to HE 18
PGAE Nov 5 TESLA-LOSBANOS-500kV line from HE 8 to HE 16 and on the NWK DIST-LS ESTRS-230kV line from HE 13 to HE 16
PGAE; SDGE Nov 6 TESLA-LOSBANOS-500kV line from HE 10 to HE 15 and on the 115-WTG-at-PEGS-PNM1-CABEZN-RIOPUERC-345kV line from HE 8 to HE 15
PGAE; SDGE Nov 7 EL CAJON-LOSCOCHS-69kV line from HE 1 to HE 19 and on the TESLA-LOSBANOS-500kV line from HE 8 to HE 13
PGAE Nov 8 GATES1-MIDWAY-500kV line from HE 8 to HE 16
PGAE Nov 9 GATES1-MIDWAY-500kV line from HE 8 to HE 16 and on the TESLA-LOSBANOS-500kV line from HE 9 to HE 15
PGAE; SDGE; VEA; SCE Nov 10 DOUBLTTP-FRIARS-138kV line from HE 8 to HE 19 and on the GATES1-MIDWAY-500kV line from HE 8 to HE 15
PGAE Nov 11 GATES1-MIDWAY-500kV line from HE 7 to HE 18
PGAE Nov 12 GATES1-MIDWAY-500kV line from HE 8 to HE 11 and on the LOSBANOS-PANOCHE-230kV line from HE 11 to HE 15
PGAE; SDGE Nov 13 GATES1-MIDWAY-500kV line from HE 8 to HE 16
PGAE; SDGE; VEA; SCE Nov 14 115kV DL Wm Pi-EP1-LUN-DIB flowgate in HE 15
PGAE; SDGE Nov 15 PEGS-PNM1-CABEZN-RIOPUERC flowgate from HE 7 to HE 11
PGAE; SDGE Nov 16 EL-CAJON-LOSCOCHS 69 kV line from HE 15 to HE 22
PGAE; SDGE; VEA; SCE Nov 17 OMS 50004 IV-ML OUTAGE_NG nomogram binding from HE 10 to HE 18 along with congestion on the MIGUEL-MIGUEL-230 XFMR from HE 8 to HE 9
PGAE; SDGE Nov 18 7440_MetcalfImport_Mossld-Metclf nomogram binding from HE 9 to HE 19
PGAE; SDGE; VEA; SCE Nov 20 GATES1-MIDWAY-500kV line from HE 8 to HE 15
PGAE; SDGE Nov 23 MIGUEL_BKs_MXFLW_NG nomogram binding from HE 7 to HE 19
PGAE Nov 25-27 GATES1-MIDWAY-500kV line from HE 7 to HE 16
PGAE Nov 28 GATES1-MIDWAY-500kV line from HE 8 to HE 24
PGAE Nov 29 GATES1-MIDWAY-500kV line from HE 1 to HE 20
PGAE Nov 30 GATES1-MIDWAY-500kV line from HE 8 to HE 16 and on the EL CAJON-LOSCOCHS-69kV line from HE 16 to HE 19

Figure 3.3 below shows the daily frequency of positive price spikes and negative prices by price range for the DLAPs in the FMM.

The cumulative frequency of prices in FMM above $250/MWh increased from 0 in October to 0.0174 percent in November, while the cumulative frequency of negative prices decreased from 9.65 percent in October to 1.31 percent, correlated with an decrease in renewable generation curtailment.

Figure 3.3: Daily Frequency of FMM DLAP Positive Price Spikes and Negative Prices

Daily Frequency of FMM DLAP Positive Price Spikes and Negative Prices

Figure 3.4 shows daily simple average prices for all the DLAPs (PG&E, SCE, SDG&E, and VEA) for all hours respectively in RTD.

Average RTD DLAP prices across PGAE, SCE, SDGE, and VEA increased relative to the previous month.

TABLE 3.3 below lists the binding constraints that resulted in relatively high or low DLAP prices on certain dates.

Figure 3.4: RTD Simple Average DLAP Prices (All Hours)

RTD Simple Average DLAP Prices (All Hours)
Table 3.3: RTD Transmission Constraint
DLAP LMPs Affected Dates Transmission Constraint
PGAE Nov 1 GATES1-MIDWAY-500kV line from HE 9 to HE 13 and on the PANOCHE-GATES-230kV line in HE 10
PGAE Nov 2 7820_TL 230S_OVERLOAD_NG nomogram binding in HE 8
PGAE Nov 3 WHISMAN-MNTA VSA-115kV line from HE 8 to HE 17
PGAE Nov 4 TESLA-LOSBANOS-500kV line from HE 8 to HE 16, MOSSLD-LASAGUIL-230kV line from HE 10 to HE 17, and on the NWK DIST-LS ESTRS-230kV line from HE 17 to HE 19
PGAE Nov 5 PANOCHE-GATES-230kV line from HE 8 to HE 17 and on the NWK DIST-LS ESTRS-230kV line from HE 13 to HE 15
PGAE; SDGE Nov 6 TESLA-LOSBANOS-500kV line from HE 10 to HE 15 and on the 115-WTG-at-PEGS-PNM1-CABEZN-RIOPUERC-345kV line from HE 8 to HE 15
PGAE; SDGE Nov 7 EL CAJON-LOSCOCHS-69kV line from HE 1 to HE 18 and on the TESLA-LOSBANOS-500kV line from HE 8 to HE 13
PGAE Nov 8 GATES1-MIDWAY-500kV line from HE 8 to HE 16
PGAE Nov 9 GATES1-MIDWAY-500kV line from HE 8 to HE 16 and on the TESLA-LOSBANOS-500kV line from HE 8 to HE 15
PGAE; SDGE; SCE; VEA Nov 10 GATES1-MIDWAY-500kV line from HE 8 to HE 15 and on the LOSBANOS-PANOCHE-230kV line from HE 10 to HE 16
PGAE Nov 11 GATES1-MIDWAY-500kV line from HE 7 to HE 17
PGAE Nov 12 MIGUEL-MIGUEL-230kV transformer from HE 9 to HE 15 and on the LOSBANOS-PANOCHE-230kV line from HE 10 to HE 14
PGAE; SDGE Nov 13 GATES1-MIDWAY-500kV line from HE 8 to HE 16
PGAE; SDGE; SCE; VEA Nov 14 PEGS-PNM1-CABEZN-RIOPUERC flowgate from HE 12 to HE 13 and on the COOLWATER KRAMER IM nomogram from HE 11 to HE 12
PGAE; SDGE Nov 15 EL-CAJON-LOSCOCHS 69 kV line in HE 13,14,16 and HE 18
PGAE; SDGE Nov 16 GATES1-MIDWAY 500 kV line from HE 8 to HE 16
PGAE; SDGE; SCE; VEA Nov 17 OMS 50004 IV-ML OUTAGE_NG nomogram binding from HE 9 to HE 18 along with congestion on the MIGUEL-MIGUEL-230 XFMR from HE 8 to HE 9
PGAE; SDGE Nov 18 GATES1-MIDWAY-500kV line from HE 7 to HE 21 and on the TESLA-LOSBANOS-500kV line in HE 15
PGAE; SDGE Nov 19 LOSBANOS-PANOCHE-230kV line from HE 8 to HE 16
PGAE; SDGE; SCE; VEA Nov 20 GATES1-MIDWAY-500kV line from HE 8 to HE 15
PGAE Nov 21 MIDWAY-WIRLWIND-500kV line from HE 13 to HE 14
PGAE; SDGE Nov 22 EL CAJON-LOSCOCHS-69kV line from HE 18 to HE 21
PGAE; SDGE; SCE; VEA Nov 23 MIGUEL_BKs_MXFLW_NG nomogram binding from HE 7 to HE 18
PGAE Nov 24 GATES1-MIDWAY-500kV line from HE 8 to HE 23
PGAE Nov 25-27 GATES1-MIDWAY-500kV line from HE 8 to HE 16
PGAE Nov 28 GATES1-MIDWAY-500kV line from HE 8 to HE 24
PGAE Nov 30 GATES1-MIDWAY-500kV line from HE 8 to HE 16 and on the EL CAJON-LOSCOCHS-69kV line from HE 16 to HE 19

Figure 3.5 below shows the daily frequency of positive price spikes and negative prices by price range for the DLAPs in RTD.

The cumulative frequency of prices in RTD above $250/MWh decreased from 0.008 percent in October to 0 in November, while the cumulative frequency of negative prices decreased from 10.3 percent in October to 1.86 percent in November, correlated with a decrease in renewable generation curtailment.

Figure 3.5: Daily Frequency of RTD DLAP Positive Price Spikes and Negative Prices