Section 3 Market Performance Metrics

Day-Ahead Prices

Figure 3.1 shows the daily simple average prices for all hours in IFM for each of the four default load-aggregation points (DLAP): PG&E, SCE, SDG&E, and VEA.

Average Day-Ahead DLAP prices in PGAE increased relative to the previous month, while prices in SCE, SDGE, and VEA remained largely unchanged between August and September.

TABLE 3.1 below lists the binding constraints that resulted in relatively high or low DLAP prices on certain dates.

Figure 3.1: IFM (Day-Ahead) Simple Average DLAP Prices (All Hours)

IFM (Day-Ahead) Simple Average DLAP Prices (All Hours)
Table 3.1: Day-Ahead Transmission Constraint
DLAP LMPs Affected Dates Transmission Constraint
PGAE; VEA; SDGE; SCE September 1 LOSBANOS-PANOCHE-230kV line from HE 9 to HE 18 and on the METCALF-METCALF-230 XFMR from HE 17 to HE 22
PGAE; VEA; SDGE; SCE September 2 METCALF-METCALF-230 XFMR from HE 9 to HE 23
PGAE; VEA; SDGE; SCE September 4-5 LOSBANOS-PANOCHE-230kV line from HE 9 to HE 17 and on the HENTAP1-MUSTANGS-230kV line from HE 18 to HE 22
PGAE; VEA; SDGE; SCE September 6 MIGUEL_BKs_MXFLW_NG nomogram binding from HE 8 to HE 16 along with congestion on the LOSBANOS-PANOCHE-230kV line from HE 9 to HE 17
PGAE;SDGE September 7-13 LOSBANOS-PANOCHE-230kV line from HE 9 to HE 18 and on the MOSSLD-LASAGUIL-230kV line from HE 9 to HE 17
PGAE September 14 LOSBANOS-PANOCHE-230kV line from HE 9 to HE 18 and on the DEVERS-DEVERS-500 XFMR from HE 8 to HE 18
PGAE; VEA; SDGE; SCE September 15 LOSBANOS-PANOCHE-230kV line from HE 8 to HE 18 and on the MOSSLD-LASAGUIL-230kV line from HE 9 to HE 16
PGAE; VEA; SDGE; SCE September 16 DEVERS-CALCAPS2-500kV line from HE 9 to HE 18 and on the LOSBANOS-PANOCHE-230kV line from HE 9 to HE 18
PGAE; VEA; SDGE; SCE September 17 LOSBANOS-PANOCHE-230kV line from HE 8 to HE 18 and on the DEVERS-CALCAPS2-500kV line from HE 9 to HE 18
VEA; SDGE September 18 LOSBANOS-PANOCHE 230kV line from HE 8 to HE 18 and on the 7690-CONTRL_INYOKN EXP Nomogram from HE 1 to HE 24
VEA; SDGE September 19 EL CAJON-LOSCOCHS-69kV line from HE 1 to HE 24 and on the DEVERS-CALCAPS2-500kV line from HE 9 to HE 17
VEA; SCE September 20-22 LOSBANOS-PANOCHE-230kV line from HE 9 to HE 18
PGAE; VEA; SDGE; SCE September 23 LOSBANOS-PANOCHE-230kV line from HE 9 to HE 18 and on the MESA CAL-LAGUBELL-230kV line from HE 12 to HE 15
PGAE; VEA; SDGE; SCE September 24 SWTWTRTP-SWEETWTR-69kV line from HE 8 to HE 19 and on the EL CAJON-LOSCOCHS-69kV line from HE 1 to HE 24
VEA; SCE September 25-26 LOSBANOS-PANOCHE-230kV line from HE 9 to HE 18 and on the PANOCHE-GATES-230kV line from HE 9 to HE 17
VEA; SCE September 27 LOSBANOS-PANOCHE-230kV line from HE 9 to HE 18 and on the MOSSLD-LASAGUIL-230kV line from HE 9 to HE 16
PGAE; SDGE September 28 LOSBANOS-PANOCHE-230kV line from HE 8 to HE 18 and on the PANOCHE-GATES-230kV line from HE 8 to HE 17
PGAE; SDGE; VEA; SCE September 29 GATES-MIDWAY-230kV line from HE 9 to HE 16 and on the LOSBANOS-PANOCHE-230kV line from HE 8 to HE 17
PGAE: SDGE September 30 GATES-MIDWAY-230kV line from HE 8 to HE 22 and on the GATES2-MIDWAY-500kV line from HE 8 to HE 17

Real-Time Price

Figure 3.2 shows daily simple average prices for all four DLAPs (PG&E, SCE, SDG&E, and VEA) for all hours respectively in FMM.

Except for PGAE, average FMM DLAP prices decreased from the previous month, in line with the load decline described above.

TABLE 3.2 below lists the binding constraints that resulted in relatively high or low DLAP prices on certain dates.

Figure 3.2: FMM Simple Average DLAP Prices (All Hours)

FMM Simple Average DLAP Prices (All Hours)
Table 3.2: FMM Transmission Constraint
DLAP LMPs Affected Dates Transmission Constraint
PGAE September 1 LOSBANOS-PANOCHE-230kV line from HE 9 to HE 18 and on the METCALF-METCALF-230 XFMR from HE 15 to HE 22
PGAE September 2 METCALF-METCALF-230 XFMR from HE 16 to HE 19 and on the MUSTANGS-GATES-230kV line from HE 19 to HE 23
PGAE; VEA September 3 LOSBANOS-PANOCHE-230kV line from HE 9 to HE 18 and on the HENTAP1-MUSTANGS-230kV line from HE 19 to HE 21
PGAE; VEA; SDGE; SCE September 4 7820_TL 230S_OVERLOAD_NG nomogram binding from HE 15 to HE 21 and on the HENTAP1-MUSTANGS-230kV line from HE 18 to HE 22
PGAE; VEA; SDGE; SCE September 5 EL CAJON-LOSCOCHS-69kV line from HE 1 to HE 24 and on the MOSSLD-LASAGUIL-230kV line from HE 10 to HE 16
PGAE; VEA; SDGE; SCE September 6 MIGUEL_BKs_MXFLW_NG nomogram binding from HE 8 to HE 18 and 7820_TL23040_IV_SPS_NG binding from HE 17 to HE 19
PGAE; VEA; SDGE; SCE September 7 MOSSLD-LASAGUIL-230kV line from HE 8 to HE 10 and on the LOSBANOS-PANOCHE-230kV line from HE 8 to HE 18
PGAE; VEA; SDGE; SCE September 8 EL CAJON-LOSCOCHS-69kV line from HE 1 to HE 24 and on the MOSSLD-LASAGUIL-230kV line from HE 8 to HE 17
PGAE; SDGE September 9 LOSBANOS-PANOCHE-230kV line from HE 8 to HE 18
PGAE; VEA; SDGE; SCE September 10 MOSSLD-LASAGUIL-230kV line from HE 9 to HE 17 and on the METCALF-METCALF-230 XFMR from HE 11 to HE 23
SDGE September 11 EL-CAJON-LOSCOCHS-69kV line from HE 15 to HE 22
PGAE; VEA; SDGE; SCE September 12 LOSBANOS-PANOCHE-230kV line from HE 9 to HE 18 and on the SYCAMORE-PENSQTOS-230kV line from HE 9 to HE 13
PGAE; SDGE September 13 LOSBANOS-PANOCHE-230kV line from HE 8 to HE 18 and on the PANOCHE-GATES-230kV line from HE 19 to HE 21
PGAE; VEA; SDGE; SCE September 14-15 LOSBANOS-PANOCHE-230kV line from HE 8 to HE 18 and on the MOSSLD-LASAGUIL-230kV line from HE 9 to HE 10
PGAE; VEA; SDGE; SCE September 16 J.HINDS2-MIRAGE-230kV line from HE 3 to HE 24 and on the LOSBANOS-PANOCHE-230kV line from HE 8 to HE 19
PGAE; VEA; SDGE; SCE September 17 LOSBANOS-PANOCHE-230kV line from HE 11 to HE 19 and on the J.HINDS2-MIRAGE-230kV line from HE 1 to HE 21
SDGE September 18 HPLND-CLVRDLJT 60kV line from HE 1 to HE 3, HE 11 and from HE 15 to HE 22
PGAE; VEA; SDGE; SCE September 19 7820_TL 230S_OVERLOAD_NG nomogram binding from HE 1 to HE 24
PGAE; VEA; SDGE; SCE September 20 7820_PK_EC_OVERLOAD_NG nomogram binding from HE 11 to HE 24
PGAE; VEA; SDGE; SCE September 21 EL CAJON-LOSCOCHS-69kV line from HE 1 to HE 24 and on the LOSBANOS-PANOCHE-230kV line from HE 8 to HE 18
PGAE; VEA; SDGE; SCE September 22 MESA CAL-LAGUBELL-230kV line from HE 9 to HE 12 and on the SYCAMORE-PENSQTOS-230kV line from HE 16 to HE 19
PGAE; VEA; SDGE; SCE September 23 SYCAMORE-PENSQTOS-230kV line from HE 8 to HE 18 and on the MOSSLD-LASAGUIL-230kV line from HE 9 to HE 17
PGAE; VEA; SDGE; SCE September 24 SUNCREST-SUNC TP2-230kV line from HE 8 to HE 16 and on the PANOCHE-GATES-230kV line from HE 8 to HE 17
PGAE; SDGE September 25 EL-CAJON-LOSCOCHS-69kV line from HE 8 to HE 14 and on the PANOCHE-GATES-230kV line from HE 8 to HE 18
PGAE; VEA; SDGE; SCE September 26 SYCAMORE-PENSQTOS-230kV line from HE 8 to HE 18 and on the PANOCHE-GATES-230kV line from HE 8 to HE 21
PGAE; VEA; SDGE; SCE September 27 LOSBANOS-PANOCHE-230kV line from HE 9 to HE 18 and on the MC CALL-MC CALL-230 XFMR from HE 18 to HE 21
PGAE September 28 LOSBANOS-PANOCHE-230kV line from HE 9 to HE 18 and on the LOSBANOS-GATES1-500kV line from HE 11 to HE 16
PGAE; VEA; SDGE; SCE September 29 GATES2-MIDWAY-500kV line from HE 8 to HE 21 and on the MIGUEL-MIGUEL-230 XFMR from HE 10 to HE 18
PGAE September 30 GATES2-MIDWAY-500kV line from HE 8 to HE 22 and on the LOSBANOS-PANOCHE-230kV line from HE 11 to HE 17

Figure 3.3 below shows the daily frequency of positive price spikes and negative prices by price range for the DLAPs in the FMM.

The cumulative frequency of prices in FMM above $250/MWh increased from 0.042 percent in August to 0.13 percent in September, while the cumulative frequency of negative prices increased from 1.08 percent in August to 1.5 percent in September, correlated with an increase in renewable generation curtailment.

Figure 3.3: Daily Frequency of FMM DLAP Positive Price Spikes and Negative Prices

Daily Frequency of FMM DLAP Positive Price Spikes and Negative Prices

Figure 3.4 shows daily simple average prices for all the DLAPs (PG&E, SCE, SDG&E, and VEA) for all hours respectively in RTD.

RTD DLAP prices on average decreased compared to the previous month, except for PGAE, aligning with the decrease in load discussed in the last section.

TABLE 3.3 below lists the binding constraints that resulted in relatively high or low DLAP prices on certain dates.

Figure 3.4: RTD Simple Average DLAP Prices (All Hours)

RTD Simple Average DLAP Prices (All Hours)
Table 3.3: RTD Transmission Constraint
DLAP LMPs Affected Dates Transmission Constraint
PGAE September 1 LOSBANOS-PANOCHE-230kV line from HE 9 to HE 18 and on the METCALF-METCALF-230 XFMR from HE 15 to HE 22
PGAE September 2 METCALF-METCALF-230 XFMR from HE 16 to HE 19 and on the MUSTANGS-GATES-230kV line from HE 19 to HE 23
PGAE; VEA September 3 LOSBANOS-PANOCHE-230kV line from HE 9 to HE 18 and on the HENTAP1-MUSTANGS-230kV line from HE 19 to HE 21
PGAE; VEA; SDGE; SCE September 4 7820_TL 230S_OVERLOAD_NG nomogram binding from HE 14 to HE 21 along with congestion on the HENTAP1-MUSTANGS-230kV line in HE 20
PGAE; VEA; SDGE; SCE September 5 EL CAJON-LOSCOCHS-69kV line from HE 1 to HE 24 and on the MOSSLD-LASAGUIL-230kV line from HE 10 to HE 16
PGAE; VEA; SDGE; SCE September 6 MIGUEL_BKs_MXFLW_NG nomogram binding from HE 8 to HE 18 and 7820_TL23040_IV_SPS_NG binding from HE 18 to HE 19
PGAE; VEA; SDGE; SCE September 7 MOSSLD-LASAGUIL-230kV line from HE 8 to HE 17 and on the LOSBANOS-PANOCHE-230kV line from HE 9 to HE 18
PGAE; SDGE September 8 EL CAJON-LOSCOCHS-69kV line from HE 1 to HE 24 and on the MOSSLD-LASAGUIL-230kV line from HE 8 to HE 18
PGAE; VEA; SDGE; SCE September 9 LOSBANOS-PANOCHE-230kV line from HE 8 to HE 18
PGAE; VEA; SDGE; SCE September 10 LOSBANOS-PANOCHE-230kV line from HE 8 to HE 14 and on the MOSSLD-LASAGUIL-230kV line from HE 9 to HE 18
PGAE; VEA; SDGE; SCE September 11 SYCAMORE-PENSQTOS-230kV line from HE 8 to HE 18
PGAE; VEA; SDGE; SCE September 12 LOSBANOS-PANOCHE-230kV line from HE 9 to HE 18 and on the SYCAMORE-PENSQTOS-230kV line from HE 9 to HE 13
PGAE; SDGE September 13 LOSBANOS-PANOCHE-230kV line from HE 8 to HE 18 and on the PANOCHE-GATES-230kV line from HE 19 to HE 21
PGAE; VEA; SDGE; SCE September 14-15 LOSBANOS-PANOCHE-230kV line from HE 8 to HE 18 and on the MOSSLD-LASAGUIL-230kV line from HE 9 to HE 18
PGAE; VEA; SDGE; SCE September 16 LOSBANOS-PANOCHE-230kV line from HE 8 to HE 19 and on the DEVERS-CALCAPS2-500kV line from HE 9 to HE 19
PGAE; VEA; SDGE; SCE September 17 LOSBANOS-PANOCHE-230kV line from HE 9 to HE 18 and on the J.HINDS2-MIRAGE-230kV line from HE 1 to HE 18
SDGE September 18 SILVERGT-CORONADO 69kV line from HE 13 to HE 16
PGAE; VEA; SDGE; SCE September 19 7820_TL 230S_OVERLOAD_NG nomogram binding from HE 1 to HE 24
PGAE; VEA; SDGE; SCE September 20 7820_PK_EC_OVERLOAD_NG nomogram binding from HE 10 to HE 24
PGAE; VEA; SDGE; SCE September 21 EL CAJON-LOSCOCHS-69kV line from HE 1 to HE 24 and on the LOSBANOS-PANOCHE-230kV line from HE 9 to HE 18
PGAE; VEA; SDGE; SCE September 22 MESA CAL-LAGUBELL-230kV line from HE 9 to HE 12 and on the SYCAMORE-PENSQTOS-230kV line from HE 15 to HE 19
PGAE; VEA; SDGE; SCE September 23 SYCAMORE-PENSQTOS-230kV line from HE 8 to HE 18 and on the MESA CAL-LAGUBELL-230kV line from HE 11 to HE 13
PGAE; VEA; SDGE; SCE September 24 SUNCREST-SUNC TP2-230kV line from HE 8 to HE 16 and on the PANOCHE-GATES-230kV line from HE 9 to HE 18
PGAE; SDGE September 25 S EL-CAJON-LOSCOCHS-69kV line from HE 9 to HE 14 and on the PANOCHE-GATES-230kV line from HE 7 to HE 22
PGAE; VEA; SDGE; SCE September 26 SYCAMORE-PENSQTOS-230kV line from HE 8 to HE 17 and on the LOSBANOS-PANOCHE-230kV line from HE 8 to HE 19
PGAE; VEA; SDGE; SCE September 27-28 LOSBANOS-PANOCHE-230kV line from HE 8 to HE 18 and on the MC CALL-MC CALL-230 XFMR from HE 18 to HE 21
PGAE; VEA; SDGE; SCE September 29 GATES2-MIDWAY-500kV line from HE 8 to HE 17 and on the MIGUEL-MIGUEL-230 XFMR from HE 9 to HE 18
PGAE September 30 GATES2-MIDWAY-500kV line from HE 8 to HE 22 and on the LOSBANOS-PANOCHE-230kV line from HE 10 to HE 16

Figure 3.5 below shows the daily frequency of positive price spikes and negative prices by price range for the DLAPs in RTD.

The cumulative frequency of prices in RTD above $250/MWh increased from 0.0756 percent in August to 0.0781 percent in September, while the cumulative frequency of negative prices increased from 0.748 percent in August to 2.05 percent in September, correlated with an increase in renewable generation curtailment.

Figure 3.5: Daily Frequency of RTD DLAP Positive Price Spikes and Negative Prices

Daily Frequency of RTD DLAP Positive Price Spikes and Negative Prices