The California ISO has posted North American Electric Reliability Corporation/Western Electricity Coordinating Council (NERC/WECC) information files to the Market Results Interface - Settlements (MRI-S) and the Secure File Transfer Protocol (SFTP) server on April 30, 2020. The files contain the NERC/WECC metered demand for assessment year 2020 for scheduling coordinator (SC) review, pursuant to ISO tariff section 11.20.4(a).
Information files can be retrieved in MRI-S by selecting NERC WECC INFO as the run type and setting the post date to 04/30/2020. The files are available on MRI-S and SFTP for 45 calendar days after publication. Scheduling coordinators (SCs) are advised to download the files for validation purposes and future reference.
Item
|
Value
|
Unit
|
Total NERC/WECC Metered Demand for Calendar Year 2019
|
219,157,970.77
|
MWh
|
Estimated Preliminary NERC/WECC Charge Rate for Assessment Year 2021
|
0.046656334
|
$/MWh
|
2019 NERC/WECC metered demand is the summation of monthly NERC/WECC metered demand quantities published previously in the T+9M recalculation statements for January 2019 through July 2019, and T+55B recalculation statements for August 2019 through December 2019. Details regarding assessment of Charge Code 6490 NERC/WECC Charge are provided in the business process manual (BPM) configuration guide available at http://bpmcm.caiso.com/Pages/SnBBPMDetails.aspx?BPM=Settlements%20and%20Billing.
The NERC/WECC information files combined with this market notice shall serve as written notification of each SC's NERC/WECC metered demand for 2019.
Beginning April 30, 2020, each SC will have 60 calendar days to raise any disputes concerning the data calculation.