The California ISO issued an Exceptional Dispatch Capacity Procurement Mechanism (CPM) designation to HUMBPP_1_UNITS3 to address a non-system reliability need. The quantity of the designation was 15.73 megawatts (MW). The Exceptional Dispatch was issued to address a potential thermal overload in the Pacific Gas & Electric Company (PG&E) Area for the next contingency event.
The ISO has designated the capacity identified below effective Sept. 1, 2020, for a non-system reliability need. The CPM term is for 60 days under the tariff, subject to adjustment and the payment provisions set forth in the CPM tariff provisions.
Resource ID
|
MW
|
TAC Area
|
HUMBPP_1_UNITS3
|
15.73
|
PGE
|
The ISO will provide a designation report in accordance with tariff section 43A.6.2. The report will be available on the ISO website at http://www.caiso.com/market/Pages/ReportsBulletins/Default.aspx, under the Capacity procurement mechanism heading.