ISO Logo
 
Market Notice
May 16, 2018

REQUESTED ACTION

Information Only

CATEGORIES

Information Technology

Market Rules and Design

Western Energy Imbalance Market

Commitment Cost Enhancements Phase 3: Master File Production Implementation

MESSAGE

The California ISO released Master File version 34.0 to production today, which includes updates to the User Interface (UI) and Application Programming Interface (API) with new templates and new validation rules.  Updates for Use Limit Plan Data (ULPD v2), and the Generator Resource Data Template (GRDTv12.0) are as follows:

 

UI

Validation Rules around duration of plans

New Configuration ID

 

API

GRDT V.12 is optional except for Use Limited Multi-Stage Generating Resources (MSGs), which is required

 

These are the same new features that participants reviewed during the March Commitment Cost Enhancements Phase 3 implementation market simulation.

 

The ISO posted an updated version of the Master File User Guide to its website at http://www.caiso.com/Documents/MasterFileUserGuide_Mar2018.pdf.  This updated version includes a complete list of all Use Limited Plan (ULP) and Resource Data Template (RDT) validation rules, and updated RDT submission instructions.  Please refer to Appendix B of the User Guide for more information.

 

More information on the Commitment Cost Enhancements Phase 3 implementation is available on the Release Planning webpage at http://www.caiso.com/informed/Pages/ReleasePlanning/Default.aspx.


CONTACT INFORMATION

Contact the Service Desk for further assistance at (916) 351-2309, (888) 889-0450, or http://www.caiso.com/Pages/ContactUs.aspx

Engage with us!
isoball twitterball RSSball Facebookball YouTube
Daily Briefing
Sign up
for
Daily Briefing
ISO Today
Download
ISO Today
Flex Alerts
Sign up
for
Flex Alerts

California Independent System Operator | P.O. Box 639014 | Folsom, CA 95630 | United States