July and August 2021 Capacity Procurement Mechanism Significant Event Designation

MESSAGE

On July 9, 2021, the California ISO issued a Significant Event Capacity Procurement Mechanism (CPM) designation to the 11 resources listed below to address a CPM Significant Event.

 

The ISO tariff defines a CPM significant event as a “substantial event, or a combination of events, that is determined by the CAISO to either result in a material difference from what was assumed in the resource adequacy program for purposes of determining the Resource Adequacy Capacity requirements, or produce a material change in system conditions or in CAISO Controlled Grid operations, that causes, or threatens to cause, a failure to meet Reliability Criteria absent the recurring use of a non-Resource Adequacy Resource(s) on a prospective basis.”

 

On June 29, 2021, Marybel Batjer, President, California Public Utilities Commission, and David Hochschild, Chair, California Energy Commission, sent a letter to Elliot Mainzer, President of the ISO. (See joint statement and letter here) The letter cites several significant changes in the assumptions underlying the resource adequacy program and in system conditions, including: (1) significantly reduced hydroelectric production due to worsening drought conditions; (2) unforeseen limitations on output of thermal resources; (3) extreme heat events that have begun unseasonably early; (4) planned online dates for several new resources have been delayed beyond the summer; (5) further development of demand-side resources in response to emergency procurement authorizations remains uncertain; (6) resources sufficient to meet peak demand are not always adequate to support peak demand net of wind and solar generation (i.e., the net peak demand); and (7) the timeline of the resource adequacy compliance processes provide limited ability to address the changed conditions in the near term. The June 29, letter requests the ISO use its tariff-based authority to procure additional capacity in response to these factors. The ISO has concluded that the combination of these factors constitutes a CPM Significant Event that may last through October.

 

The ISO has designated the 11 resources noted below as CPM capacity to address the CPM Significant Event. The resources listed below offered capacity to the ISO to use under CPM, and that capacity was not procured previously as Resource Adequacy capacity. Ten of the resource designations are effective July 9, 2021, and one is effective Aug. 1, 2021.

 

The quantity resulting from the designations that are effective July 9, is 309.24 MW and the total from the designation effective August 1, is 30 MW.

 

 

Resource ID

Quantity of Designation

Effective Date

TAC

KRNCNY_6_UNIT

4.74

July 9

SYS

BLKCRK_2_GMCBT1

132.5

July 9

SYS

HINSON_6_LBECH1

5

July 9

SYS

HINSON_6_LBECH2

7

July 9

SYS

HINSON_6_LBECH3

7

July 9

SYS

HINSON_6_LBECH4

4

July 9

SYS

VESTAL_2_WELLHD

38

July 9

SYS

SBERDO_2_PSP4

45

July 9

SYS

SBERDO_2_PSP3

15

July 9

SYS

BUCKBL_2_PL1X3

51

July 9

SYS

ELKHIL_2_PL1X3

30

August 1

SYS

 

On July 9, the ISO also issued an Exceptional Dispatch CPM to the resource listed below to address an Exceptional Dispatch CPM System Reliability Need The ISO issued the Exceptional Dispatch to address potential system capacity concerns that are exacerbated by the factors described above that have created the CPM Significant Event. The resource listed below responded to the Exceptional Dispatch and at least part of the capacity that responded was not Resource Adequacy capacity. The CPM quantity resulting from the designation is 121.42 MW.

 

Resource ID

Quantity of Designation

Effective Date

TAC

INTKEP_2_UNITS

121.42

July 9

SYS

 

The CPM term for all 12 of these resources is 30 days, as provided under the tariff, subject to adjustment and the payment provisions in Section 43A of the ISO tariff.

 

The ISO will provide a designation report for these CPM designations under tariff section 43A.6.2. The report will be available on the Reports and Bulletins webpage, under the Capacity procurement mechanism heading.


CONTACT INFORMATION

Abdul Mohammed-Ali at amohammedali@caiso.com or ISO Customer Service at 916-608-7320

Engage with us!
isoball twitterball RSSball Facebookball YouTube
Daily Briefing
Sign up
for
Daily Briefing
ISO Today
Download
ISO Today
Flex Alerts
Sign up
for
Flex Alerts

California Independent System Operator | P.O. Box 639014 | Folsom, CA 95630 | United States