Forward to Operating Department
System Operations
Notification of Revised ISO Operating Procedure 3530I
The California ISO has revised the operating procedure referenced below.
3530IStranded Load Scheduling – Public Attachment, version 2.2, effective Dec. 7, 2019
Updated Scheduling Description for VEA Load.
ISO Operating Procedures - http://www.caiso.com/rules/Pages/OperatingProcedures/Default.aspx
ISO Procedure Control Desk at procctrldesk@caiso.com.
Glossary of terms and acronyms
California Independent System Operator | P.O. Box 639014 | Folsom, CA 95630 | United States
Copyright © 2019 All rights reserved