ISO Logo
 
Notice
October 8, 2020

REQUESTED ACTION

Forward to Operating Department

CATEGORIES

Operations

Notification of Revised ISO Operating Procedures 1210 and 3630

MESSAGE

The California ISO has revised the operating procedures referenced below.

 

1210 Day-Ahead Market, version 18.4, effective Oct. 8, 2020.

Updated message in Section A.3.1.6 Ancillary Services Determination as a result of market participants’ enquiries.

Replaced ISO Director, System Operations with ISO Director, Real-Time Operations. Updated Real-Time Operations Management Team roles in Definitions Section.

Updated various section references throughout.

Minor format and grammar updates.

 

3630 Modeling - Scheduling ETC and TOR Rights, version 7.0, effective Oct. 8, 2020.

Periodic Review:

Minor format and grammar updates.

Removed version history prior to five-years.

Updated review criteria procedure reference and added document controlled footer.

 

ISO Operating Procedures - http://www.caiso.com/rules/Pages/OperatingProcedures/Default.aspx


CONTACT INFORMATION

ISO Procedure Control Desk at ProcedureControl@caiso.com
Engage with us!
isoball twitterball RSSball Facebookball YouTube
Daily Briefing
Sign up
for
Daily Briefing
ISO Today
Download
ISO Today
Flex Alerts
Sign up
for
Flex Alerts

California Independent System Operator | P.O. Box 639014 | Folsom, CA 95630 | United States