ISO Logo
 
Market Notice
March 29, 2019

REQUESTED ACTION

Forward to Operating Department

CATEGORIES

System Operations

Notification of Revised ISO Operating Procedures 1210, 4510 and 4510A

MESSAGE

The California ISO has revised the operating procedures referenced below.

 

1210 Day-Ahead Market, version 18.2, effective April 1, 2019.

Section D.3.1.2: Added new Step 8

 

4510 Load Management Programs and Underfrequency Load Shedding, version 5.0, effective April 1, 2019.

Annual Review:

  • Section 3.2.1, replaced “ISO Interchange Scheduler Desk” with ‘ISO Transmission Desk”
  • Section 5: Updated procedure reference for Review Criteria
  • Replaced Peak RC (Reliability Coordinator) with the RC and Reliability Messaging Tool (RMT) with Reliability messaging system
  • Minor format and grammar updates

4510A Load Shed Calculation Guideline - Public Attachment, version 10.5, effective April 1, 2019.

Updated the percentages to reflect Peak Loads in 2018

 

ISO Operating Procedures - http://www.caiso.com/rules/Pages/OperatingProcedures/Default.aspx


CONTACT INFORMATION

ISO Procedure Control Desk at procctrldesk@caiso.com

Engage with us!
isoball twitterball RSSball Facebookball YouTube
Daily Briefing
Sign up
for
Daily Briefing
ISO Today
Download
ISO Today
Flex Alerts
Sign up
for
Flex Alerts

California Independent System Operator | P.O. Box 639014 | Folsom, CA 95630 | United States