View the online version


ISO Logo
 
Notice
February 12, 2020

REQUESTED ACTION

Forward to Operating Department

CATEGORIES

System Operations

Notification of Revised ISO Operating Procedures 2310, 2330C and 3210G

MESSAGE

The California ISO has revised the operating procedures referenced below.

 

2310 Real-Time Reliability Must Run Unit Commitment and Dispatch, version 11.0, effective Feb. 12, 2020

Periodic Review:

Removed all tasks not performed by Operations.

Replaced A/S (Ancillary Services) with AS.

Minor formatting and grammar updates.

Removed version history prior to five years.

 

2330C Exceptional Dispatch Instruction Type Codes, version 6.2, effective Feb. 12, 2020

Updated Section 2.3:

Updated "Notes" for "Software Limitation."

Replaced "RTCA/VSA/DSA/OP" with "Reliability Assessment" and updated "Notes."

 

3210G Outages to Connect New or Re-Arranged Facilities, version 4.0, effective Feb. 12, 2020

Periodic Review:

No content changes; only minor format changes.

 

ISO Operating Procedures - http://www.caiso.com/rules/Pages/OperatingProcedures/Default.aspx


CONTACT INFORMATION

ISO Procedure Control Desk at procctrldesk@caiso.com.

Engage with us!
isoball twitterball RSSball Facebookball YouTube
Daily Briefing
Sign up
for
Daily Briefing
ISO Today
Download
ISO Today
Flex Alerts
Sign up
for
Flex Alerts

California Independent System Operator | P.O. Box 639014 | Folsom, CA 95630 | United States


ISO Logo
 
Notice
February 12, 2020

REQUESTED ACTION

Forward to Operating Department

CATEGORIES

System Operations

Notification of Revised ISO Operating Procedures 2310, 2330C and 3210G

MESSAGE

The California ISO has revised the operating procedures referenced below.

 

2310 Real-Time Reliability Must Run Unit Commitment and Dispatch, version 11.0, effective Feb. 12, 2020

Periodic Review:

Removed all tasks not performed by Operations.

Replaced A/S (Ancillary Services) with AS.

Minor formatting and grammar updates.

Removed version history prior to five years.

 

2330C Exceptional Dispatch Instruction Type Codes, version 6.2, effective Feb. 12, 2020

Updated Section 2.3:

Updated "Notes" for "Software Limitation."

Replaced "RTCA/VSA/DSA/OP" with "Reliability Assessment" and updated "Notes."

 

3210G Outages to Connect New or Re-Arranged Facilities, version 4.0, effective Feb. 12, 2020

Periodic Review:

No content changes; only minor format changes.

 

ISO Operating Procedures - http://www.caiso.com/rules/Pages/OperatingProcedures/Default.aspx


CONTACT INFORMATION

ISO Procedure Control Desk at procctrldesk@caiso.com.

Engage with us!
isoball twitterball RSSball Facebookball YouTube
Daily Briefing
Sign up
for
Daily Briefing
ISO Today
Download
ISO Today
Flex Alerts
Sign up
for
Flex Alerts

California Independent System Operator | P.O. Box 639014 | Folsom, CA 95630 | United States

Unsubscribe | Manage preferences | Forward to a friend